If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22226 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.874761,"lon":-80.013956,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Connoquenessing Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 151035 | |
Farm/Lease Name: GUIHER UNIT 3H | |
License Status: Active | |
Spud Date: 2014-05-14 | |
Permit Date: 2014-03-21 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.874761 | |
Longitude: -80.013956 |
Date | Event |
---|---|
2014-03-21 | New Permit Application |
2014-05-14 | Performed Spud Operation |
2014-07-12 | Drilling Completion |
2016-08-26 | Perforation |
2016-09-06 | Perforation |
2016-09-06 | Performed Stage 1 of Stimulation |
2016-09-06 | Performed Stage 2 of Stimulation |
2016-09-07 | Perforation |
2016-09-07 | Performed Stage 3 of Stimulation |
2016-09-07 | Performed Stage 4 of Stimulation |
2016-09-07 | Performed Stage 5 of Stimulation |
2016-09-08 | Perforation |
2016-09-08 | Performed Stage 6 of Stimulation |
2016-09-12 | Perforation |
2016-09-12 | Performed Stage 7 of Stimulation |
2016-09-12 | Performed Stage 8 of Stimulation |
2016-09-12 | Performed Stage 9 of Stimulation |
2016-09-13 | Perforation |
2016-09-13 | Performed Stage 10 of Stimulation |
2016-09-13 | Performed Stage 11 of Stimulation |
2016-09-14 | Perforation |
2016-09-14 | Performed Stage 12 of Stimulation |
2016-09-14 | Performed Stage 13 of Stimulation |
2016-09-14 | Performed Stage 14 of Stimulation |
2016-09-15 | Perforation |
2016-09-15 | Performed Stage 15 of Stimulation |
2016-09-16 | Perforation |
2016-09-16 | Performed Stage 16 of Stimulation |
2016-09-16 | Performed Stage 17 of Stimulation |
2016-09-19 | Perforation |
2016-09-19 | Performed Stage 18 of Stimulation |
2016-09-19 | Performed Stage 19 of Stimulation |
2016-09-20 | Performed Stage 20 of Stimulation |
2016-09-20 | Performed Stage 21 of Stimulation |
2016-09-21 | Perforation |
2016-09-21 | Performed Stage 22 of Stimulation |
2016-09-22 | Perforation |
2016-09-22 | Performed Stage 23 of Stimulation |
2016-09-23 | Perforation |
2016-09-23 | Performed Stage 24 of Stimulation |
2016-09-23 | Performed Stage 25 of Stimulation |
2016-09-26 | Perforation |
2016-09-26 | Performed Stage 26 of Stimulation |
2016-09-26 | Performed Stage 27 of Stimulation |
2016-09-27 | Perforation |
2016-09-27 | Performed Stage 28 of Stimulation |
2016-09-28 | Perforation |
2016-09-28 | Performed Stage 29 of Stimulation |
2016-09-29 | Perforation |
2016-09-29 | Performed Stage 30 of Stimulation |
2016-09-30 | Perforation |
2016-09-30 | Performed Stage 31 of Stimulation |
2016-09-30 | Performed Stage 32 of Stimulation |
2016-10-03 | Perforation |
2016-10-03 | Performed Stage 33 of Stimulation |
2016-10-03 | Performed Stage 34 of Stimulation |
2016-10-04 | Performed Stage 35 of Stimulation |
2017-02-09 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-09-06 | 2016-10-04 | 5,523 | 10,609,000 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Keane | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 7.24862 | 7,020,010.0 |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Cinnamaldehyde | 104-55-2 | 10 | 0.000240071 | 232.5 | |
Alcohols, C12-16, ethoxylated propoxylated | 68213-24-1 | 2 | 0.00197038 | 1908.23 | ||||
propan-2-ol | 67-63-0 | 5 | 0.000120036 | 116.25 | ||||
Water | 7732-18-5 | 92.5 | 1.08558 | 1,051,340.0 | ||||
Alkyl phosphonic acid | Proprietary | 5 | 0.000841879 | 815.327 | ||||
Water | 7732-18-5 | 85 | 0.0306254 | 29659.5 | ||||
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.000678549 | 657.149 | ||||
ethanediol | 107-21-1 | 10 | 0.00985189 | 9541.17 | ||||
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000452082 | 437.824 | ||||
glutaral | 111-30-8 | 26.7 | 0.00227318 | 2201.49 | ||||
Tar bases, quinoline derivs., benzyl chloride-quaternized | 72480-70-7 | 10 | 0.000240071 | 232.5 | ||||
formic acid | 64-18-6 | 10 | 0.000240071 | 232.5 | ||||
dipropylene gylcol, monomethyl ether | 34590-94-8 | 20 | 0.000480143 | 465 | ||||
Ethoxylated alcohol | Proprietary | 10 | 0.000240071 | 232.5 | ||||
Fatty alcohols ethoxylated | Proprietary | 2 | 0.00197038 | 1908.23 | ||||
Hydrochloric Acid (7.5%) | Keane | Acid Inhibitor | Water | 7732-18-5 | 92.5 | 1.08558 | 1,051,340.0 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0880198 | 85243.8 | ||||
KAI-13 | Keane | Acid Inhibitor | Ethoxylated alcohol | Proprietary | 10 | 0.000240071 | 232.5 | |
dipropylene gylcol, monomethyl ether | 34590-94-8 | 20 | 0.000480143 | 465 | ||||
formic acid | 64-18-6 | 10 | 0.000240071 | 232.5 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.000240071 | 232.5 | ||||
propan-2-ol | 67-63-0 | 5 | 0.000120036 | 116.25 | ||||
ethanediol | 107-21-1 | 40 | 0.000960286 | 930 | ||||
Tar bases, quinoline derivs., benzyl chloride-quaternized | 72480-70-7 | 10 | 0.000240071 | 232.5 | ||||
Water | XTO Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 91.4155 | 88,532,400.0 | |
MBC-516 | Keane | Biocide | Proprietary | Proprietary | 56.7 | 0.00482902 | 4676.72 | |
glutaral | 111-30-8 | 26.7 | 0.00227318 | 2201.49 | ||||
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.000678549 | 657.149 | ||||
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000452082 | 437.824 | ||||
KFR-17 | Keane | Friction Reducer | ethanediol | 107-21-1 | 10 | 0.00985189 | 9541.17 | |
Fatty alcohols ethoxylated | Proprietary | 2 | 0.00197038 | 1908.23 | ||||
Alcohols, C12-16, ethoxylated propoxylated | 68213-24-1 | 2 | 0.00197038 | 1908.23 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 45 | 0.0443335 | 42935.3 | ||||
Hydrochloric Acid (15%) | Keane | Acidizing | Water | 7732-18-5 | 85 | 0.0306254 | 29659.5 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.00540447 | 5234.02 | ||||
KSI-16NW | Keane | Scale Inhibitor | ammonia | 7664-41-7 | 0.5 | 0.00008419 | 81.533 | |
Alkyl phosphonic acid | Proprietary | 5 | 0.000841879 | 815.327 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-09-06 | 1 | SAND | 6,713,532 | 7,144 | 6,005 |
2016-09-06 | 2 | SAND | 6,713,532 | 7,265 | 5,743 |
2016-09-07 | 3 | SAND | 6,713,532 | 7,960 | 6,034 |
2016-09-07 | 4 | SAND | 6,713,532 | 6,897 | 5,412 |
2016-09-07 | 5 | SAND | 6,713,532 | 6,885 | 5,745 |
2016-09-08 | 6 | SAND | 6,713,532 | 7,530 | 6,111 |
2016-09-12 | 7 | SAND | 6,713,532 | 7,345 | 5,230 |
2016-09-12 | 8 | SAND | 6,713,532 | 8,206 | 5,655 |
2016-09-12 | 9 | SAND | 6,713,532 | 6,602 | 5,250 |
2016-09-13 | 10 | SAND | 6,713,532 | 7,767 | 5,228 |
2016-09-13 | 11 | SAND | 6,713,532 | 6,759 | 5,478 |
2016-09-14 | 12 | SAND | 6,713,532 | 8,171 | 5,321 |
2016-09-14 | 13 | SAND | 6,713,532 | 6,745 | 5,570 |
2016-09-14 | 14 | SAND | 6,713,532 | 6,224 | 5,531 |
2016-09-15 | 15 | SAND | 6,713,532 | 6,366 | 5,237 |
2016-09-16 | 16 | SAND | 6,713,532 | 5,987 | 5,250 |
2016-09-16 | 17 | SAND | 6,713,532 | 5,887 | 5,281 |
2016-09-19 | 18 | SAND | 6,713,532 | 5,936 | 5,370 |
2016-09-19 | 19 | SAND | 6,713,532 | 5,784 | 4,616 |
2016-09-20 | 20 | SAND | 6,713,532 | 6,419 | 6,430 |
2016-09-20 | 21 | SAND | 6,713,532 | 6,295 | 5,712 |
2016-09-21 | 22 | SAND | 6,713,532 | 6,396 | 6,329 |
2016-09-22 | 23 | SAND | 6,713,532 | 6,274 | 6,561 |
2016-09-23 | 24 | SAND | 6,713,532 | 8,288 | 6,496 |
2016-09-23 | 25 | SAND | 6,713,532 | 5,977 | 5,241 |
2016-09-26 | 26 | SAND | 6,713,532 | 6,383 | 5,577 |
2016-09-26 | 27 | SAND | 6,713,532 | 6,582 | 5,240 |
2016-09-27 | 28 | SAND | 6,713,532 | 8,134 | 6,047 |
2016-09-28 | 29 | SAND | 6,713,532 | 5,663 | 5,620 |
2016-09-29 | 30 | SAND | 6,713,532 | 5,886 | 6,031 |
2016-09-30 | 31 | SAND | 6,713,532 | 5,785 | 5,618 |
2016-09-30 | 32 | SAND | 6,713,532 | 5,715 | 5,730 |
2016-10-03 | 33 | SAND | 6,713,532 | 5,502 | 6,036 |
2016-10-03 | 34 | SAND | 6,713,532 | 5,496 | 5,307 |
2016-10-04 | 35 | SAND | 6,713,532 | 5,567 | 5,707 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 833,434.00 | 349 | 0.00 | 0 | 736.49 | 349 |
2018 | XTO ENERGY INC | 559,048.73 | 322 | 39.27 | 30 | 564.41 | 292 |
2019 | XTO ENERGY INC | 565,899.29 | 365 | 0.00 | 0 | 771.29 | 365 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | XTO ENERGY INC | Drill Cuttings | 812.39 Tons | LANDFILL | 100403 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 4,181.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | XTO ENERGY INC | Other Oil & Gas Wastes | 20.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 62.16 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 327.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 140.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 5,497.95 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 5,960.72 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 6,275.58 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 15,770.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Other Oil & Gas Wastes | 9.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 320.16 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 119.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 7,794.09 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Other Oil & Gas Wastes | 84.97 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2018 | XTO ENERGY INC | Produced Fluid | 120.30 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 6,511.05 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 4,010.21 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 1,642.11 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 1,323.21 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2273400 | Primary Facility | 2014-05-21 | Drilling/Alteration | No Violations Noted | |
2277285 | Primary Facility | 2014-06-04 | Routine/Partial Inspection | No Violations Noted | |
2286175 | Primary Facility | 2014-07-08 | Drilling/Alteration | No Violations Noted | |
2362237 | Primary Facility | 2015-04-14 | Routine/Partial Inspection | No Violations Noted | |
2486259 | Primary Facility | 2016-05-19 | Routine/Partial Inspection | No Violations Noted | |
2537967 | Primary Facility | 2016-11-21 | Administrative/File Review | No Violations Noted | |
2721329 | Primary Facility | 2018-04-23 | Routine/Partial Inspection | No Violations Noted | On 4/22/2018, WQS Brian MacQuarrie onsite. Five wells in production; the 3H-019-22226, 4H-019-22227, 5H-019-22229, 6H-019-22230 and 7HB-019-22228. Six 400 bbl tanks installed within secondary containment structure. XTO Mountain Gathering equipment staged onsite. |
2763027 | Primary Facility | 2018-08-13 | Routine/Partial Inspection | No Violations Noted | On 8/13/2018, WQS Brian MacQuarrie onsite. Five wells in production;3H-019-22226, 4H-019-22227, 7HB-019-22228, 5H-019-22229 and 6H-019-22230. Six 400 bbl tanks installed in containment. Six temporary tanks containing rainwater from inside production water secondary containment structure staged on well pad awaiting disposal approval. Timber Mats from Mountain Gathering staged on well pad. Freshwater impoundment fenced in and maintained. Well site stabilized with vegetation. |
2839398 | Primary Facility | 2019-02-13 | Routine/Partial Inspection | No Violations Noted | On 2/13/2019, WQS Brian MacQuarrie onsite to conduct inspection. Well site consists of five wells in production; Lutherlyn 6H(019-22230), Lutherlyn 5H (019-22229), Guiher 3H (019-22226), Guiher 4H (019-22227) and Guiher 7HB (019-22228). Wells properly tagged. Production equipment consists of five GPUs installed within secondary containment structure. Tank battery consists of six 400 bbl tanks ( five for production water and one for condensate). Timber mats from pipeline activities staged on well pad. Two roll off containers staged on pad, one empty, and one contains compost filter sock. Fresh water impoundment fenced in and locked. Previously disturbed areas well vegetated. |
For data sources see[9]