If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22048 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.898358,"lon":-79.779203,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Donegal Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 144567 | |
Farm/Lease Name: WELTER UNIT 1H | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2013-03-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.898358 | |
Longitude: -79.779203 |
Date | Event |
---|---|
2013-03-14 | New Permit Application |
2013-04-20 | Performed Spud Operation |
2013-06-11 | Drilling Completion |
2013-09-24 | Perforation |
2014-08-20 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-12-04 | 2013-12-31 | 5,997 | 6,373,770 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Proprietary Blend Surfactants | NA | 35 | 0.000630512 | 373.841 |
Short Chained Glycol Ether | 112-34-5 | 50 | 0.000900731 | 534.059 | ||||
Ethoxylated alcohol | NA | 35 | 0.000630512 | 373.841 | ||||
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Other - (non-hazardous) | NA | 92.5 | 0.0491213 | 29124.9 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.00398281 | 2361.47 | ||||
Acetic Acid (10%) | Chemical Solvents, Inc. | Acidizing | Other - (non-hazardous) | NA | 90 | 0.0673932 | 39958.6 | |
Acetic Acid | 64-19-7 | 10 | 0.00748814 | 4439.85 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Other - (non-hazardous) | NA | 70 | 0.0437146 | 25919.1 | |
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0187348 | 11108.2 | ||||
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Other - (non-hazardous) | NA | 70 | 0.00754299 | 4472.37 | |
Ethylene Glycol | 107-21-1 | 30 | 0.00323271 | 1916.73 | ||||
Biocide, EC6116A | Nalco | Biocide | Other - (non-hazardous) | NA | 5 | 0.000523395 | 310.33 | |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.000523395 | 310.33 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00314037 | 1861.98 | ||||
Polyethylene Glycol | 25322-68-3 | 60 | 0.00628074 | 3723.96 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.7075 | 53,189,100.0 | |
Hydrochloric Acid (15%) | PPG Industries | Acidizing | Other - (non-hazardous) | NA | 85 | 1.72727 | 1,024,130.0 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.304812 | 180728 | ||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 7.98408 | 4,733,900.0 | |
Clay Stabilizer, Cla-Chek G | Shrieve | Clay Stabilizer | Water | 7732-18-5 | 15 | 0.00942351 | 5587.36 | |
Other - (non-hazardous) | NA | 85 | 0.0533999 | 31661.7 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 172,763.00 | 143 | 0.00 | 0 | 56.80 | 143 |
2015 | XTO ENERGY INC | 236,220.00 | 357 | 0.00 | 0 | 409.71 | 206 |
2016 | XTO ENERGY INC | 179,495.00 | 334 | 0.00 | 0 | 449.19 | 305 |
2017 | XTO ENERGY INC | 161,666.00 | 275 | 0.00 | 0 | 382.88 | 275 |
2018 | XTO ENERGY INC | 115,578.60 | 233 | 0.00 | 0 | 278.10 | 233 |
2019 | XTO ENERGY INC | 138,079.82 | 321 | 0.00 | 0 | 316.86 | 321 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | XTO ENERGY INC | Drill Cuttings | 1,864.31 Tons | LANDFILL | 101397 |
2013 | XTO ENERGY INC | Drill Cuttings | 26.33 Tons | LANDFILL | 100403 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 211.30 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 5,072.20 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 2,382.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 124.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | XTO ENERGY INC | Produced Fluid | 707.90 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 493.30 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 607.10 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 425.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 310.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 98.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 3,835.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 973.20 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 804.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 1,303.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 32.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 210.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 1,118.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 567.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 148.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 539.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2166706 | Primary Facility | 2013-05-14 | Drilling/Alteration | No Violations Noted | |
2172489 | Primary Facility | 2013-05-23 | Routine/Partial Inspection | No Violations Noted | |
2181872 | Primary Facility | 2013-07-03 | Routine/Partial Inspection | No Violations Noted | |
2189576 | Primary Facility | 2013-07-31 | Routine/Complete Inspection | No Violations Noted | |
2194763 | Primary Facility | 2013-08-06 | Routine/Partial Inspection | No Violations Noted | |
2271496 | Primary Facility | 2014-05-13 | Routine/Partial Inspection | No Violations Noted | |
2605700 | Primary Facility | 2017-06-20 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
Well drilled, completed, and in production. Production equipment on site. Gathering pipeline connected to well pad. There is a well development impoundment on site. Well site PCSM plan has been implemented and site has 100% vegetation. Well tag in place, and well head has been fenced. |
2719096 | Primary Facility | 2018-04-17 | Routine/Partial Inspection | No Violations Noted | On 4/17/2018, WQS Brian MacQuarrie onsite for routine inspection. Site sign maintained at entrance to site. Access road maintained. Well pad has 3 wells in production. Production equipment consists of 4 four hundred bbl tanks and 3 GPUs installed within secondary containment. Well development impoundment adjacent to well pad fenced in and maintained. No apparent issues. |
For data sources see[8]