X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-21568"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-21568
 
| Well ID: 37-019-21568
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.810736, -80.038676 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.810736, -80.038676 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: LONCHENA P 1
 
| Farm/Lease Name: LONCHENA P 1
 
|-
 
|-
| License Status: Active
+
| License Status: INACTIVE
 
|-
 
|-
| Spud Date: 2008-10-13
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2008-05-30
 
| Permit Date: 2008-05-30
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.810736
 
| Latitude: 40.810736
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-05-30
 +
| New Permit Application
 +
|-
 +
| 2008-10-13
 +
| Performed Spud Operation
 +
|-
 +
| 2008-10-19
 +
| Drilling Completion
 +
|-
 +
| 2009-03-25
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 98:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 96: Line 134:
 
| 2009
 
| 2009
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 13,250.00
+
| style="text-align: right;" | 13250.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 218: Line 256:
 
| 2010
 
| 2010
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 200.00 Bbl
 
| style="text-align: right;" | 200.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 225: Line 263:
 
| 2011
 
| 2011
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 232.00 Bbl
+
| style="text-align: right;" | 71.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| INJECTION DISPOSAL WELL
| 34-099-23127
+
| 34-155-23584
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 70.00 Bbl
 
| style="text-align: right;" | 70.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 239: Line 277:
 
| 2011
 
| 2011
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 71.00 Bbl
+
| style="text-align: right;" | 232.00 Bbl
| INJECTION DISPOSAL WELL
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-155-23584
+
| 34-099-23127
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 180.00 Bbl
 
| style="text-align: right;" | 180.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 253: Line 291:
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 83.50 Bbl
 
| style="text-align: right;" | 83.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 260: Line 298:
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 90.00 Bbl
 
| style="text-align: right;" | 90.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 267: Line 305:
 
| 2018
 
| 2018
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 170.00 Bbl
 
| style="text-align: right;" | 170.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 274: Line 312:
 
| 2019
 
| 2019
 
| [[PENNENERGY RESOURCES LLC]]
 
| [[PENNENERGY RESOURCES LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 393: Line 431:
 
|-
 
|-
 
|}
 
|}
<!--==== Penalties Applied ====
+
==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Violation ID
Line 404: Line 442:
 
!scope="col" | Amount Collected
 
!scope="col" | Amount Collected
 
|-
 
|-
|}-->
+
| 549295
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title =Oil and Gas Compliance Report
 
  | title =Oil and Gas Compliance Report

Revision as of 21:34, 21 May 2020

Well Details

Well ID: 37-019-21568
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Forward Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 146595
Farm/Lease Name: LONCHENA P 1
License Status: INACTIVE
Spud Date:
Permit Date: 2008-05-30
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.810736
Longitude: -80.038676

For data sources see[1][2][3]

Well History

Date Event
2008-05-30 New Permit Application
2008-10-13 Performed Spud Operation
2008-10-19 Drilling Completion
2009-03-25 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 VISTA OPR INC 0.00 0 0.00 0 0.00 0
2009 VISTA OPR INC 13250.00 365 0.00 0 0.00 0
2010 VISTA OPR INC 29,231.99 182 0.00 0 36,688.47 182
2011 VISTA OPR INC 59,837.46 359 0.00 0 65,004.24 181
2012 RE GAS DEV LLC 29,831.07 366 0.00 0 27,134.11 182
2013 RE GAS DEV LLC 27,373.87 365 0.00 0 1.60 181
2014 RE GAS DEV LLC 24,216.95 365 0.00 0 0.00 0
2015 RE GAS DEV LLC 24,649.29 359 0.00 0 0.00 0
2016 RE GAS DEV LLC 19,962.04 359 0.00 0 0.00 0
2017 RE GAS DEV LLC 17,873.29 355 0.00 0 0.00 0
2018 RE GAS DEV LLC 10,758.68 201 0.00 0 0.00 0
2019 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 VISTA OPR INC Brine 731.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 VISTA OPR INC Produced Fluid 200.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 VISTA OPR INC Produced Fluid 71.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2011 VISTA OPR INC Produced Fluid 70.00 Bbl INJECTION DISPOSAL WELL 34-049-23127
2011 VISTA OPR INC Produced Fluid 232.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127
2012 VISTA OPR INC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-007-22038
2013 RE GAS DEV LLC Produced Fluid 83.50 Bbl INJECTION DISPOSAL WELL 34-155-23759
2016 RE GAS DEV LLC Produced Fluid 90.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2018 RE GAS DEV LLC Produced Fluid 170.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1742212 Primary Facility 2008-10-15 Drilling/Alteration Viol(s) Noted & Immediately Corrected
1755059 Primary Facility 2008-12-09 Routine/Complete Inspection No Violations Noted
1792423 Primary Facility 2009-04-24 Routine/Complete Inspection No Violations Noted
1794307 Primary Facility 2009-04-28 Drilling/Alteration No Violations Noted
1794786 Primary Facility 2009-05-04 Drilling/Alteration No Violations Noted
1796480 Primary Facility 2009-05-08 Routine/Complete Inspection No Violations Noted
1797650 Primary Facility 2009-05-11 Drilling/Alteration No Violations Noted
1802889 Primary Facility 2009-06-04 Drilling/Alteration No Violations Noted
1805389 Primary Facility 2009-06-12 Routine/Complete Inspection No Violations Noted
1811526 Primary Facility 2009-07-09 Routine/Complete Inspection No Violations Noted
1902928 Primary Facility 2010-07-26 Routine/Complete Inspection No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1742212 549295 10/15/2008 2008-10-15 102.4INADPLN - E&S Plan not adequate Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
549295

For data sources see[7]

References