X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-31330"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-31330
 
| Well ID: 37-005-31330
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.708811, -79.626694 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.708811, -79.626694 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 07/07/2018
+
| Spud Date: 2018-07-07
 
|-
 
|-
| Permit Date: 6/26/2018
+
| Permit Date: 2018-06-26
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 79: Line 104:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 84: Line 110:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2018-09
+
| 2018
| Drill Cuttings (in Tons) RWC 810
+
| [[SNYDER BROS INC]]
| style="text-align: right;" | 216.35 Tons
+
| Produced Fluid (in Barrels) RWC 802
| LANDFILL
+
| style="text-align: right;" | 100.00 Bbl
| 100585
+
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 
|-
 
|-
| 2018-10
+
| 2018
 +
| [[SNYDER BROS INC]]
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
| style="text-align: right;" | 356.40 Tons
+
| style="text-align: right;" | 1,552.35 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100585
 
| 100585
 
|-
 
|-
| 2018-10
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[SNYDER BROS INC]]
| style="text-align: right;" | 100.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-11
 
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 16.88 Bbl
 
| style="text-align: right;" | 16.88 Bbl
Line 108: Line 131:
 
| 34-099-23158
 
| 34-099-23158
 
|-
 
|-
| 2018-12
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[SNYDER BROS INC]]
| style="text-align: right;" | 979.60 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2019-02
 
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 5.85 Tons
 
| style="text-align: right;" | 5.85 Tons
Line 206: Line 224:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 06:46, 20 August 2019

Well Details

Well ID: 37-005-31330
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: SNYDER BROS INC
Well Pad ID: 154284
Farm/Lease Name: NEUMANN 7H
License Status: Active
Spud Date: 2018-07-07
Permit Date: 2018-06-26
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.708811
Longitude: -79.626694

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 SNYDER BROS INC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 100.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Drill Cuttings (in Tons) RWC 810 1,552.35 Tons LANDFILL 100585
2018 SNYDER BROS INC Drilling Fluid Waste (in Barrels) RWC 803 16.88 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Synthetic Liner Materials (in Tons) RWC 806 5.85 Tons LANDFILL 100280

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2749889 Primary Facility 2018-07-09 Routine/Complete Inspection No Violations Noted Inspection conducted in response to electronic spud notification scheduled for 7/7/18 for well 7H.

At time of inspection, auger rig on-site. Wells 7H and 8H to be spudded today. Wells 1H, 2H, 3H, 4H, 5H, and 6H have been spudded.

2750656 Primary Facility 2018-07-11 Drilling/Alteration No Violations Noted This well was spudded on 7/9/2018. The cellar is 6'X6'. The conductor hole was drilled to 40' and has 40' of 30" pipe installed and cemented to surface. The well has been covered with a steel plate for safety until the top hole Rig arrives.
2782334 Primary Facility 2018-10-02 Drilling/Alteration No Violations Noted The Rig was drilling at 2888' at the time of this inspection. All drilling log information and all equipment on site looked ok.
2793619 Primary Facility 2018-10-24 Drilling/Alteration No Violations Noted On this return date, the Patterson Finishing Rig is moving on the well pad and setting up to resume drilling the final lateral leg of this well and the rest of the 8 wells on this pad. The drillers log and permit copies are on site and all equipment looks ok.
2802723 Primary Facility 2018-11-13 Routine/Complete Inspection No Violations Noted Present during inspection is operator rep Rod Bennett.

According to Department records, this well was spud on 7-7-18. At time of inspection drilling actively taking place on well 2H. According to Mr. Bennett, wells 3H and 4H have been drilled and cemented and drilling will begin on well 1H next week. Mr. Bennett also states that operator intends to drill this well (7H), 5H, 6H, and 8H on this pad.

For data sources see[6]

References