If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-005-31330 | | Well ID: 37-005-31330 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.708811, -79.626694 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 21: | Line 21: | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 07 | + | | Spud Date: 2018-07-07 |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2018-06-26 |
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 79: | Line 104: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 84: | Line 110: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[SNYDER BROS INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | | + | | style="text-align: right;" | 100.00 Bbl |
− | | | + | | INJECTION DISPOSAL WELL |
+ | | 34-099-23158 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[SNYDER BROS INC]] | ||
| Drill Cuttings (in Tons) RWC 810 | | Drill Cuttings (in Tons) RWC 810 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,552.35 Tons |
| LANDFILL | | LANDFILL | ||
| 100585 | | 100585 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[SNYDER BROS INC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
| Drilling Fluid Waste (in Barrels) RWC 803 | | Drilling Fluid Waste (in Barrels) RWC 803 | ||
| style="text-align: right;" | 16.88 Bbl | | style="text-align: right;" | 16.88 Bbl | ||
Line 108: | Line 131: | ||
| 34-099-23158 | | 34-099-23158 | ||
|- | |- | ||
− | | | + | | 2019 |
− | + | | [[SNYDER BROS INC]] | |
− | | | ||
− | |||
− | |||
− | |||
− | |||
| Synthetic Liner Materials (in Tons) RWC 806 | | Synthetic Liner Materials (in Tons) RWC 806 | ||
| style="text-align: right;" | 5.85 Tons | | style="text-align: right;" | 5.85 Tons | ||
Line 206: | Line 224: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-005-31330 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.708811,"lon":-79.626694,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: South Buffalo Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 154284 | |
Farm/Lease Name: NEUMANN 7H | |
License Status: Active | |
Spud Date: 2018-07-07 | |
Permit Date: 2018-06-26 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.708811 | |
Longitude: -79.626694 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | SNYDER BROS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | SNYDER BROS INC | Produced Fluid (in Barrels) RWC 802 | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Drill Cuttings (in Tons) RWC 810 | 1,552.35 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Drilling Fluid Waste (in Barrels) RWC 803 | 16.88 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Synthetic Liner Materials (in Tons) RWC 806 | 5.85 Tons | LANDFILL | 100280 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2749889 | Primary Facility | 2018-07-09 | Routine/Complete Inspection | No Violations Noted | Inspection conducted in response to electronic spud notification scheduled for 7/7/18 for well 7H.
At time of inspection, auger rig on-site. Wells 7H and 8H to be spudded today. Wells 1H, 2H, 3H, 4H, 5H, and 6H have been spudded. |
2750656 | Primary Facility | 2018-07-11 | Drilling/Alteration | No Violations Noted | This well was spudded on 7/9/2018. The cellar is 6'X6'. The conductor hole was drilled to 40' and has 40' of 30" pipe installed and cemented to surface. The well has been covered with a steel plate for safety until the top hole Rig arrives. |
2782334 | Primary Facility | 2018-10-02 | Drilling/Alteration | No Violations Noted | The Rig was drilling at 2888' at the time of this inspection. All drilling log information and all equipment on site looked ok. |
2793619 | Primary Facility | 2018-10-24 | Drilling/Alteration | No Violations Noted | On this return date, the Patterson Finishing Rig is moving on the well pad and setting up to resume drilling the final lateral leg of this well and the rest of the 8 wells on this pad. The drillers log and permit copies are on site and all equipment looks ok. |
2802723 | Primary Facility | 2018-11-13 | Routine/Complete Inspection | No Violations Noted | Present during inspection is operator rep Rod Bennett.
According to Department records, this well was spud on 7-7-18. At time of inspection drilling actively taking place on well 2H. According to Mr. Bennett, wells 3H and 4H have been drilled and cemented and drilling will begin on well 1H next week. Mr. Bennett also states that operator intends to drill this well (7H), 5H, 6H, and 8H on this pad. |
For data sources see[6]