37-005-31330

Well Details

Well ID: 37-005-31330
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: SNYDER BROS INC
Well Pad ID: 154284
Farm/Lease Name: NEUMANN 7H
License Status:
Spud Date:
Permit Date: 2018-06-26
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.708811
Longitude: -79.626694

For data sources see[1][2][3]

Well History

Date Event
2018-06-26 New Permit Application
2018-07-07 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 SNYDER BROS INC 666,176.00 55 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 SNYDER BROS INC Drilling Fluid Waste 16.88 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Drill Cuttings 1,552.35 Tons LANDFILL 100585
2019 SNYDER BROS INC Other Oil & Gas Wastes 150.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 594.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 SNYDER BROS INC Produced Fluid 13,362.30 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 2,226.10 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Other Oil & Gas Wastes 3.80 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Produced Fluid 10,365.20 Bbl REUSE (AT WELL PAD)
2019 SNYDER BROS INC Other Oil & Gas Wastes 13.10 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 SNYDER BROS INC Synthetic Liner Materials 5.85 Tons LANDFILL 100280
2019 SNYDER BROS INC Synthetic Liner Materials 2.78 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 SNYDER BROS INC Produced Fluid 1,461.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SNYDER BROS INC Filter Socks 0.47 Tons LANDFILL 100585
2019 SNYDER BROS INC Other Oil & Gas Wastes 21.90 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SNYDER BROS INC Produced Fluid 109.33 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 SNYDER BROS INC Waste Water Treatment Sludge 46.70 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 SNYDER BROS INC Other Oil & Gas Wastes 320.90 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2749889 Primary Facility 2018-07-09 Routine/Complete Inspection No Violations Noted Inspection conducted in response to electronic spud notification scheduled for 7/7/18 for well 7H.

At time of inspection, auger rig on-site. Wells 7H and 8H to be spudded today. Wells 1H, 2H, 3H, 4H, 5H, and 6H have been spudded.

2750656 Primary Facility 2018-07-11 Drilling/Alteration No Violations Noted This well was spudded on 7/9/2018. The cellar is 6'X6'. The conductor hole was drilled to 40' and has 40' of 30" pipe installed and cemented to surface. The well has been covered with a steel plate for safety until the top hole Rig arrives.
2782334 Primary Facility 2018-10-02 Drilling/Alteration No Violations Noted The Rig was drilling at 2888' at the time of this inspection. All drilling log information and all equipment on site looked ok.
2793619 Primary Facility 2018-10-24 Drilling/Alteration No Violations Noted On this return date, the Patterson Finishing Rig is moving on the well pad and setting up to resume drilling the final lateral leg of this well and the rest of the 8 wells on this pad. The drillers log and permit copies are on site and all equipment looks ok.
2802723 Primary Facility 2018-11-13 Routine/Complete Inspection No Violations Noted Present during inspection is operator rep Rod Bennett.

According to Department records, this well was spud on 7-7-18. At time of inspection drilling actively taking place on well 2H. According to Mr. Bennett, wells 3H and 4H have been drilled and cemented and drilling will begin on well 1H next week. Mr. Bennett also states that operator intends to drill this well (7H), 5H, 6H, and 8H on this pad.

For data sources see[7]