X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-31286"

m
 
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-31286
 
| Well ID: 37-005-31286
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.913975, -79.373367 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.913975, -79.373367 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: KUHNS 2H
 
| Farm/Lease Name: KUHNS 2H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 09/05/2017
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 7/31/2017
+
| Permit Date: 2017-07-31
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.913975
 
| Latitude: 40.913975
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
== Production Data ==
+
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Period
+
!scope="col" | Date
!scope="col" | Operator Name
+
!scope="col" | Event
!scope="col" | Gas Quantity (mcf)
 
!scope="col" | Gas Production Days
 
!scope="col" | Oil Quantity (bbl)
 
!scope="col" | Oil Production Days
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
 
|-
 
|-
| 2017
+
| 2017-07-31
| [[SNYDER BROS INC]]
+
| New Permit Application
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
| 2018
+
| 2017-09-05
| [[SNYDER BROS INC]]
+
| Performed Spud Operation
| style="text-align: right;" | 601,744.00
 
| style="text-align: right;" | 148
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2019
 
| [[SNYDER BROS INC]]
 
| style="text-align: right;" | 159,640.00
 
| style="text-align: right;" | 61
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title =Oil and Gas Production Reports
+
  | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
|publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2020-02-27
| date = 2019-03-31
 
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-02-27 }}</ref>
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Disposal Method
 
!scope="col" | Waste Facility ID
 
|-
 
| 2017-09
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 52.64 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2017-09
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 522.28 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017-10
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 726.83 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2017-10
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 448.29 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017-11
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 576.10 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2017-11
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 65.30 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-12
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 34.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-01
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 4.58 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 457.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 65.30 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 43.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23196
 
|-
 
| 2018-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 82.70 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-03
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 35.92 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 6,652.60 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 113.20 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2018-04
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 11.71 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-05
 
| Filter Socks (in Tons) RWC 812
 
| style="text-align: right;" | 0.60 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 3,542.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-05
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 5.13 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-05
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 2.21 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,497.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 65.30 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-06
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 6.66 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 235.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 587.60 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 522.30 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 187.20 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,459.10 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 32.60 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23196
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 261.10 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2018-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 4,032.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 340.60 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 4,708.20 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 727.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,689.60 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Waste Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Inspection Category
 
!scope="col" | Inspection Date
 
!scope="col" | Inspection Type
 
!scope="col" | Inspection Result
 
!scope="col" | Inspection Comments
 
|-
 
| 2633821
 
| Primary Facility
 
| 2017-09-08
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| Drilling had commenced but was not ongoing at the time if the inspection.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  All erosion controls had been implemented as outlined in the E&S plan included within the ESCGP.
 
|-
 
| 2656149
 
| Primary Facility
 
| 2017-11-02
 
| Drilling/Alteration
 
| No Violations Noted
 
| The Rig was tripping out of the hole from the TD @ 12217' at the time of this inspection. Tripping pipe out @ 7000'. Plan is to cement 5 1/2" production casing to surface in the morning. The drilling log information and all equipment on site looked ok.
 
|-
 
| 2668393
 
| Primary Facility
 
| 2017-12-06
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| At time of inspection, stimulation activities ongoing for Wells 1H and 2H.
 
|-
 
| 2673338
 
| Primary Facility
 
| 2017-12-20
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| At time of inspection, wells 2H and 1H have been frac'd, flow back has not yet occurred. Equipment is currently being removed from the location.
 
|-
 
| 2681347
 
| Primary Facility
 
| 2018-01-11
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| At time of inspection, plugs are being drilled out as part of the flowback process for wells 1H and 2H.
 
|-
 
| 2707391
 
| Primary Facility
 
| 2018-03-20
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| Inspection conducted in response to spud notifications for wells 3H, 4H, and 5H.
 
 
 
At time of inspection, wells 1H and 2H drilled and frac'd.
 
Well 3H drilled to 40 feet and covered with steel plate. Wells 4H and 5H drilled to 40 feet and covered with steel plates.
 
 
 
Department unable to adequately inspect the entire location due to ongoing high pressure testing occurring on part of the well pad.
 
|-
 
| 2724437
 
| Primary Facility
 
| 2018-04-18
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| At time of inspection, well 2H drilled and frac'd. Well 1H also drilled and frac'd. Wells 3H, 4H, and 5H spudded, not yet completed, covered with steel plates.
 
|-
 
| 2743294
 
| Primary Facility
 
| 2018-06-13
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| At time of inspection, well 2H drilled and frac'd. Well 1H also drilled and frac'd.
 
Drilling rig currently on-site. Wells 3H, 4H, and 5H previously spudded, not yet frac'd.
 
|-
 
| 2818049
 
| Primary Facility
 
| 2018-12-17
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| At time of inspection well appears to be in production. Well head surrounded by cement barriers. Three brine tanks on site.
 
No activity taking place on site at this time.
 
|-
 
| 2823166
 
| Primary Facility
 
| 2019-01-08
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| This well is tagged, in production and temporarily shut in for a sales line upgrade which is taking place at the time of this inspection in order to provide additional pipeline capacity for the 5 wells on this unconventional well pad. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
 
|-
 
| 2828383
 
| Primary Facility
 
| 2019-01-17
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| On 1/17/19 at 0903 hrs., I conducted a routine inspection of Snyder Brothers, Inc.'s Kuhns well pad and associated wells in Boggs Twp., Armstrong Co.  Five wells have been drilled and are equipped for production, including well 2H (API 005-31286).  Well tags are present at the well heads.  There are no violations noted for this inspection.
 
|-
 
| 2853261
 
| Primary Facility
 
| 2019-03-05
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| At the time of inspection, well was producing.  Well integrity was in good condition, with no signs of any leaks or spills onsite.  The well did not have any corrosion.  The cellar was below ground level, with water inside.  No bubbles were seen.  The digital gauges on the well showed the tubing pressure to be 1339 psi and the casing pressure was 1659 psi.  The well was properly labeled and the Emergency Response sign was posted at the site entrance.  There were 3 dual line heaters and 5 separators onsite.  The 1H & 2H wells had smaller separators than the rest of the wells.  There were also 3 tall tanks and a smaller horizontal tank contained within a lined, steel dike.
 
|-
 
|}
 
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Violation ID
 
!scope="col" | Violation Date
 
!scope="col" | Date Resolved
 
!scope="col" | Violation Code
 
!scope="col" | Violation Type
 
!scope="col" | Violation Comments
 
|-
 
|}-->
 
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Penalty ID
 
!scope="col" | Penalty Code
 
!scope="col" | Penalty Status
 
!scope="col" | Penalty Date
 
!scope="col" | Enforcement Date
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
|-
 
|}-->
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Compliance Report
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 461: Line 81:
 
|-
 
|-
 
| 1
 
| 1
| 12/05/2017
+
| 2017-12-05
| 12/17/2017
+
| 2017-12-17
| style="text-align: right;" | 6684
+
| style="text-align: right;" | 6,684
| style="text-align: right;" | 9,819,050.0
+
| style="text-align: right;" | 9,819,050
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 537: Line 157:
 
| style="text-align: right;" | 2341.86
 
| style="text-align: right;" | 2341.86
 
|-
 
|-
| quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides
+
| quaternary ammonium compounds,<br/> benzyl-C12-16-alkyldimethyl, chlorides
 
| 68424-85-1
 
| 68424-85-1
 
| style="text-align: right;" | 5.3
 
| style="text-align: right;" | 5.3
Line 589: Line 209:
 
| style="text-align: right;" | 699.05
 
| style="text-align: right;" | 699.05
 
|-
 
|-
| quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides
+
| quaternary ammonium compounds,<br/> benzyl-C12-16-alkyldimethyl, chlorides
 
| 68424-85-1
 
| 68424-85-1
 
| style="text-align: right;" | 5.3
 
| style="text-align: right;" | 5.3
Line 723: Line 343:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 601,744.00
 +
| style="text-align: right;" | 148
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 815,530.00
 +
| style="text-align: right;" | 336
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 448.29 Tons
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 34.80 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 65.30 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 65.30 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 1,355.57 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 970.57 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 8.87 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 4.58 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 652.90 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 714.90 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 25,442.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Filter Socks
 +
| style="text-align: right;" | 0.60 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 52.76 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 76.10 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 483.40 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23171
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 12,031.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,902.10 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2633821
 +
| Primary Facility
 +
| 2017-09-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Drilling had commenced but was not ongoing at the time if the inspection.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  All erosion controls had been implemented as outlined in the E&S plan included within the ESCGP.
 +
|-
 +
| 2656149
 +
| Primary Facility
 +
| 2017-11-02
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| The Rig was tripping out of the hole from the TD @ 12217' at the time of this inspection. Tripping pipe out @ 7000'. Plan is to cement 5 1/2" production casing to surface in the morning. The drilling log information and all equipment on site looked ok.
 +
|-
 +
| 2668393
 +
| Primary Facility
 +
| 2017-12-06
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At time of inspection, stimulation activities ongoing for Wells 1H and 2H.
 +
|-
 +
| 2673338
 +
| Primary Facility
 +
| 2017-12-20
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At time of inspection, wells 2H and 1H have been frac'd, flow back has not yet occurred. Equipment is currently being removed from the location.
 +
|-
 +
| 2681347
 +
| Primary Facility
 +
| 2018-01-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At time of inspection, plugs are being drilled out as part of the flowback process for wells 1H and 2H.
 +
|-
 +
| 2707391
 +
| Primary Facility
 +
| 2018-03-20
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| Inspection conducted in response to spud notifications for wells 3H, 4H, and 5H.
 +
 +
At time of inspection, wells 1H and 2H drilled and frac'd.
 +
Well 3H drilled to 40 feet and covered with steel plate. Wells 4H and 5H drilled to 40 feet and covered with steel plates.
 +
 +
Department unable to adequately inspect the entire location due to ongoing high pressure testing occurring on part of the well pad.
 +
|-
 +
| 2724437
 +
| Primary Facility
 +
| 2018-04-18
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At time of inspection, well 2H drilled and frac'd. Well 1H also drilled and frac'd. Wells 3H, 4H, and 5H spudded, not yet completed, covered with steel plates.
 +
|-
 +
| 2743294
 +
| Primary Facility
 +
| 2018-06-13
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At time of inspection, well 2H drilled and frac'd. Well 1H also drilled and frac'd.
 +
Drilling rig currently on-site. Wells 3H, 4H, and 5H previously spudded, not yet frac'd.
 +
|-
 +
| 2818049
 +
| Primary Facility
 +
| 2018-12-17
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At time of inspection well appears to be in production. Well head surrounded by cement barriers. Three brine tanks on site.
 +
No activity taking place on site at this time.
 +
|-
 +
| 2823166
 +
| Primary Facility
 +
| 2019-01-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well is tagged, in production and temporarily shut in for a sales line upgrade which is taking place at the time of this inspection in order to provide additional pipeline capacity for the 5 wells on this unconventional well pad. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
 +
|-
 +
| 2828383
 +
| Primary Facility
 +
| 2019-01-17
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On 1/17/19 at 0903 hrs., I conducted a routine inspection of Snyder Brothers, Inc.'s Kuhns well pad and associated wells in Boggs Twp., Armstrong Co.  Five wells have been drilled and are equipped for production, including well 2H (API 005-31286).  Well tags are present at the well heads.  There are no violations noted for this inspection.
 +
|-
 +
| 2853261
 +
| Primary Facility
 +
| 2019-03-05
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection, well was producing.  Well integrity was in good condition, with no signs of any leaks or spills onsite.  The well did not have any corrosion.  The cellar was below ground level, with water inside.  No bubbles were seen.  The digital gauges on the well showed the tubing pressure to be 1339 psi and the casing pressure was 1659 psi.  The well was properly labeled and the Emergency Response sign was posted at the site entrance.  There were 3 dual line heaters and 5 separators onsite.  The 1H & 2H wells had smaller separators than the rest of the wells.  There were also 3 tall tanks and a smaller horizontal tank contained within a lined, steel dike.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Latest revision as of 09:33, 21 May 2020

Well Details

Well ID: 37-005-31286
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Boggs Township
Operator Name: SNYDER BROS INC
Well Pad ID: 154069
Farm/Lease Name: KUHNS 2H
License Status:
Spud Date:
Permit Date: 2017-07-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.913975
Longitude: -79.373367

For data sources see[1][2][3]

Well History

Date Event
2017-07-31 New Permit Application
2017-09-05 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-05 2017-12-17 6,684 9,819,050 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (15%) Keane Acid Inhibitor Water 7732-18-5 85 0.504429 466793
Hydrochloric Acid 7647-01-0 15 0.0890169 82375.3
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 10.7624 9,959,450.0
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 88.5466 81,940,000.0
KSI-19 Keane Scale Inhibitor Methanol 67-56-1 30 0.00394562 3651.23
MBC-516 Keane Biocide glutaral 111-30-8 26.7 0.00253068 2341.86
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000503292 465.741
didecyldimethylammonium chloride 7173-51-5 8 0.000755412 699.05
Other Chemical(s) Listed Above See Trade Name(s) List prop-2-yn-1-ol 107-19-7 5 0.00005877 54.383
ammonium chloride 12125-02-9 1.5 0.00110607 1023.55
xylene 1330-20-7 5 0.00005877 54.383
Fatty imidazoline 61790-69-0 5 0.00005877 54.383
isoproyl alcohol 67-63-0 5 0.00005877 54.383
didecyldimethylammonium chloride 7173-51-5 8 0.000755412 699.05
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000503292 465.741
ethylbenzene 100-41-4 1 0.00001175 10.877
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0147477 13647.3
oleic acid diethanolamide 93-83-4 1.5 0.00110607 1023.55
alcohols, C12-16, ethoxylated 68551-12-2 1 0.000737383 682.366
Water 7732-18-5 85 0.504429 466793
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00005877 54.383
Water 7732-18-5 92.5 0 0
KFR-16FW Keane Friction Reducer oleic acid diethanolamide 93-83-4 1.5 0.00110607 1023.55
alcohols, C12-16, ethoxylated 68551-12-2 1 0.000737383 682.366
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0147477 13647.3
Water 7732-18-5 60 0.044243 40941.9
ammonium chloride 12125-02-9 1.5 0.00110607 1023.55
KAI-12 Keane Acid Inhibitor ethylbenzene 100-41-4 1 0.00001175 10.877
Fatty imidazoline 61790-69-0 5 0.00005877 54.383
prop-2-yn-1-ol 107-19-7 5 0.00005877 54.383
isoproyl alcohol 67-63-0 5 0.00005877 54.383
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00005877 54.383
xylene 1330-20-7 5 0.00005877 54.383
Methanol 67-56-1 90 0.00105781 978.89

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2018 SNYDER BROS INC 601,744.00 148 0.00 0 0.00 0
2019 SNYDER BROS INC 815,530.00 336 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SNYDER BROS INC Drill Cuttings 448.29 Tons INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Drilling Fluid Waste 34.80 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 65.30 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC Drilling Fluid Waste 65.30 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC Drill Cuttings 1,355.57 Tons LANDFILL 100585
2017 SNYDER BROS INC Drilling Fluid Waste 970.57 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Synthetic Liner Materials 8.87 Tons LANDFILL 100585
2018 SNYDER BROS INC Drill Cuttings 4.58 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid 652.90 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid 714.90 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 25,442.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Filter Socks 0.60 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid 52.76 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid 76.10 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 SNYDER BROS INC Produced Fluid 483.40 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Produced Fluid 12,031.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 2,902.10 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2633821 Primary Facility 2017-09-08 Routine/Complete Inspection No Violations Noted Drilling had commenced but was not ongoing at the time if the inspection. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All erosion controls had been implemented as outlined in the E&S plan included within the ESCGP.
2656149 Primary Facility 2017-11-02 Drilling/Alteration No Violations Noted The Rig was tripping out of the hole from the TD @ 12217' at the time of this inspection. Tripping pipe out @ 7000'. Plan is to cement 5 1/2" production casing to surface in the morning. The drilling log information and all equipment on site looked ok.
2668393 Primary Facility 2017-12-06 Routine/Complete Inspection No Violations Noted At time of inspection, stimulation activities ongoing for Wells 1H and 2H.
2673338 Primary Facility 2017-12-20 Routine/Complete Inspection No Violations Noted At time of inspection, wells 2H and 1H have been frac'd, flow back has not yet occurred. Equipment is currently being removed from the location.
2681347 Primary Facility 2018-01-11 Routine/Complete Inspection No Violations Noted At time of inspection, plugs are being drilled out as part of the flowback process for wells 1H and 2H.
2707391 Primary Facility 2018-03-20 Routine/Partial Inspection No Violations Noted Inspection conducted in response to spud notifications for wells 3H, 4H, and 5H.

At time of inspection, wells 1H and 2H drilled and frac'd. Well 3H drilled to 40 feet and covered with steel plate. Wells 4H and 5H drilled to 40 feet and covered with steel plates.

Department unable to adequately inspect the entire location due to ongoing high pressure testing occurring on part of the well pad.

2724437 Primary Facility 2018-04-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 2H drilled and frac'd. Well 1H also drilled and frac'd. Wells 3H, 4H, and 5H spudded, not yet completed, covered with steel plates.
2743294 Primary Facility 2018-06-13 Routine/Partial Inspection No Violations Noted At time of inspection, well 2H drilled and frac'd. Well 1H also drilled and frac'd.

Drilling rig currently on-site. Wells 3H, 4H, and 5H previously spudded, not yet frac'd.

2818049 Primary Facility 2018-12-17 Routine/Complete Inspection No Violations Noted At time of inspection well appears to be in production. Well head surrounded by cement barriers. Three brine tanks on site.

No activity taking place on site at this time.

2823166 Primary Facility 2019-01-08 Routine/Complete Inspection No Violations Noted This well is tagged, in production and temporarily shut in for a sales line upgrade which is taking place at the time of this inspection in order to provide additional pipeline capacity for the 5 wells on this unconventional well pad. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
2828383 Primary Facility 2019-01-17 Routine/Complete Inspection No Violations Noted On 1/17/19 at 0903 hrs., I conducted a routine inspection of Snyder Brothers, Inc.'s Kuhns well pad and associated wells in Boggs Twp., Armstrong Co. Five wells have been drilled and are equipped for production, including well 2H (API 005-31286). Well tags are present at the well heads. There are no violations noted for this inspection.
2853261 Primary Facility 2019-03-05 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. Well integrity was in good condition, with no signs of any leaks or spills onsite. The well did not have any corrosion. The cellar was below ground level, with water inside. No bubbles were seen. The digital gauges on the well showed the tubing pressure to be 1339 psi and the casing pressure was 1659 psi. The well was properly labeled and the Emergency Response sign was posted at the site entrance. There were 3 dual line heaters and 5 separators onsite. The 1H & 2H wells had smaller separators than the rest of the wells. There were also 3 tall tanks and a smaller horizontal tank contained within a lined, steel dike.

For data sources see[8]

References