X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31270

Well Details

Well ID: 37-005-31270
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 153958
Farm/Lease Name: DYNAMITE
License Status:
Spud Date:
Permit Date: 2016-12-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.869275
Longitude: -79.565850

For data sources see[1][2][3]

Well History

Date Event
2016-12-01 New Permit Application
2017-02-17 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-08 2017-09-12 6,434 14,813,100 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Company 1 Carrier/Base Fluid Water 7732-18-5 100 88.8933 123,616,000.0
BIO CLEAR 1430 Producers Service Corp Biocide Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5 0.00061501 855.237
Dimethylamine 68439-70-3 0.5 0.00006150 85.524
Glutaraldehyde 111-30-8 20 0.00246004 3420.95
Sand (Proppant) Producers Service Corp Proppant Silica Substrate 14808-60-7 100 10.3486 14,390,900.0
NEFE-180 Producers Service Corp Corrosion Inhibitor/Iron Control 2-Ethylhexanol 104-76-7 10 0.000120008 166.883
2-Propyn-1-ol 107-19-7 5 0.00006000 83.442
Fatty Acids, tall oil 61790-12-3 5 0.00006000 83.442
Coconut oil acid diethanolamine 68603-42-9 5 0.00006000 83.442
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00006000 83.442
Acetic Acid 64-19-7 65 0.000780049 1084.74
Methanol 67-56-1 35 0.000420026 584.092
15% HCL Producers Service Corp Acidizing Hydrochloric Acid 7647-01-0 15 0.0982035 136563
Other Chemical(s) Listed Above See Trade Name(s) List Methanol 67-56-1 35 0.000420026 584.092
Dimethylamine 68439-70-3 0.5 0.00006150 85.524
Coconut oil acid diethanolamine 68603-42-9 5 0.00006000 83.442
Alcohols, ethoxylated 68002-97-1 3.1 0.00241003 3351.4
Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5 0.00061501 855.237
Alcohols, ethoxylated 68551-12-2 3.1 0.00241003 3351.4
Hexamethylene Triamine Penta 34690-00-1 3 0.000364205 506.466
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00006000 83.442
2-Propyn-1-ol 107-19-7 5 0.00006000 83.442
Phosphino Carboxylic Acid Polymer 71050-62-9 3 0.000364205 506.466
2-Ethylhexanol 104-76-7 10 0.000120008 166.883
Alcohols, ethoxylated 68439-50-9 3.1 0.00241003 3351.4
DETA phosphonate 15827-60-8 3 0.000364205 506.466
Fatty Acids, tall oil 61790-12-3 5 0.00006000 83.442
STIMLUBE F Producers Service Corp Friction Reducer Alcohols, ethoxylated 68551-12-2 3.1 0.00241003 3351.4
Alcohols, ethoxylated 68439-50-9 3.1 0.00241003 3351.4
Petroleum Distallates 64742-47-8 30 0.0233228 32432.9
Alcohols, ethoxylated 68002-97-1 3.1 0.00241003 3351.4
SI-1171 Producers Service Corp Scale Inhibitor Copolymer of Maleic and Acrylic Acid 52255-49-9 10 0.00121402 1688.22
Hexamethylene Triamine Penta 34690-00-1 3 0.000364205 506.466
Phosphino Carboxylic Acid Polymer 71050-62-9 3 0.000364205 506.466
DETA phosphonate 15827-60-8 3 0.000364205 506.466

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SNYDER BROS INC 191,967.00 25 0.00 0 0.00 0
2018 SNYDER BROS INC 1,328,498.00 365 0.00 0 0.00 0
2019 SNYDER BROS INC 1,043,157.00 351 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SNYDER BROS INC 5,057.50 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC 1,372.61 Tons LANDFILL 100585
2017 SNYDER BROS INC Drilling Fluid Waste 2,025.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2017 SNYDER BROS INC Drilling Fluid Waste 5,128.28 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC 2,025.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2017 SNYDER BROS INC Produced Fluid 8,047.90 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 1,231.76 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC 434.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 306.30 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 SNYDER BROS INC Drilling Fluid Waste 434.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 3,662.55 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Synthetic Liner Materials 2.47 Tons LANDFILL 100585
2017 SNYDER BROS INC Produced Fluid 45.23 Tons LANDFILL 100585
2017 SNYDER BROS INC Drill Cuttings 1,372.61 Tons LANDFILL 100585
2018 SNYDER BROS INC Synthetic Liner Materials 3.95 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid 30,097.90 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 1,152.00 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid 91.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 SNYDER BROS INC Produced Fluid 62.20 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid 283.10 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 11.03 Tons LANDFILL 100585
2018 SNYDER BROS INC Filter Socks 1.37 Tons LANDFILL 100585
2019 SNYDER BROS INC Produced Fluid 10,627.40 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 18.30 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 SNYDER BROS INC Produced Fluid 2,493.70 Bbl REUSE (AT WELL PAD)
2019 SNYDER BROS INC Produced Fluid 523.50 Bbl INJECTION DISPOSAL WELL 34-099-23171

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2546443 Primary Facility 2016-12-21 Preoperation Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All cut and fill slopes had been temporarily stabilized and all erosion controls, i.e. silt socks & sediment traps, had been properly constructed and implemented. There were a few minor construction details being addressed. No accelerated erosion or sedimentation was observed in relation to the site or access road.
2563424 Primary Facility 2017-02-21 Drilling/Alteration No Violations Noted Well permit, site sign, drilling log book all present and up to date. 6'x6' cellar in place. Drilled and set 84' of new 24" conductor pipe. Site and equipment looked good.
2563718 Primary Facility 2017-02-21 Routine/Complete Inspection No Violations Noted Site had been constructed in accordance with the E&S plan contained within the ESCGP. All E&S controls appeared to be functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing at the time of the inspection.
2586292 Primary Facility 2017-04-24 Drilling/Alteration No Violations Noted Operator continued drilling operations on 4-23-17. The Rig shanked the bit at 860' and was waiting on cement to arrive to cement back the hole and angle deviate drill around after cement sets up. Daily drilling log and all equipment on site looked ok.
2589500 Primary Facility 2017-05-02 Drilling/Alteration No Violations Noted Rig lost the bit @ 960'. Cemented back to 478' with 610 sks cement. Went in with 8" motor & tool to attempt to angle deviate and drill down with hole opener tool. Daily drilling information and all equipment on site looked ok.
2590360 Primary Facility 2017-05-04 Drilling/Alteration No Violations Noted Plug and skid was cancelled. Rig was able to drill to 860'-ran 804' of 13 3/8" casing-cemented with 800 sks cement- got a 55 bbl return-shut down for 8 hours-running back in hole to drill out cement shoe at the time of this inspection. Daily drilling information up to date-all equipment looked ok.
2591855 Primary Facility 2017-05-09 Drilling/Alteration No Violations Noted The Rig had finished drilling the top hole portion of this well and had moved off at the time of this inspection. The well was covered over with a steel plate until the next Rig arrives. Everything left on site looked ok.
2595488 Primary Facility 2017-05-15 Drilling/Alteration No Violations Noted Top hole portion TD'd at 1,975'. Ran 1,912' of 9 5/8" casing and cemented to surface with good return. Rig gone-well covered over until finishing Rig arrives. All equipment on site looked ok.
2599996 Primary Facility 2017-05-23 Drilling/Alteration No Violations Noted Precision tripple Rig # 532 had just set up and rigged up over the bore hole. On site staff was holding their pre-drill safety/procedure meeting at the time of this inspection. All equipment on site looked ok.
2602321 Primary Facility 2017-06-06 Drilling/Alteration No Violations Noted The Rig was running the 5 1/2" production casing and getting ready to cement it to surface at the time of this inspection. Daily drilling info-all equipment on site looked ok.
2604737 Primary Facility 2017-06-16 Routine/Complete Inspection No Violations Noted Drilling had been completed. Drilling was ongoing on the well pad for the Dynamite 3H. Secondary containment onsite and it appeared to be in sound condition. Drill cutting waste containers were onsite on the secondary containment. Drill cuttings are being hauled off-site for disposal. All E&S controls had been properly implemented and maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2619504 Primary Facility 2017-07-27 Routine/Complete Inspection No Violations Noted Drilling had been completed, work was ongoing to prep the site for well stimulation activities. Well pad secondary containment had been inspected and patched as necessary after removal of the drilling equipment. All site and access road erosion controls appeared to be functioning properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
2626418 Primary Facility 2017-08-14 Drilling/Alteration No Violations Noted Frac crew just finished stage 8 - set 2 retrievable plugs and performed a negative/positive test after installing each plug. A hanger with BPV was also installed in well to provide a third barrier while RD existing valves and waiting on replacements at the time of this inspection.
2626501 Primary Facility 2017-08-15 Drilling/Alteration No Violations Noted Frac crew was removing the frac stack valves to wait on new valves to arrive from another company at the time of this inspection. Well head looked ok.
2628199 Primary Facility 2017-08-21 Drilling/Alteration No Violations Noted Frac crew just finished installing new Weatherford frac stack valves-pressure tested and getting ready to resume frac. All equipment on site looked ok.
2630645 Primary Facility 2017-08-28 Drilling/Alteration No Violations Noted Frac crew had just finished fracking stage 18 out of the planned 48 stages for this well at the time of this inspection.
2641948 Primary Facility 2017-09-29 Routine/Complete Inspection No Violations Noted Well stimulation equipment is slated to be brought onsite and well stimulation activities resume for the Dynamite 1H beginning Monday October 2, 2017. All site and access erosion controls had been implemented and maintained as outlined in the E&S Plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2648461 Primary Facility 2017-10-17 Routine/Complete Inspection No Violations Noted All erosion controls for the site and access road had been implemented and maintained as outlined in the E&S plan. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Secondary containment was located onsite, set in place and maintained as outlined in the Containment plan. Well stimulation activities had been completed. Work was underway to prepare the site and set-up the equipment necessary for drilling out the frac plugs.
2665258 Primary Facility 2017-11-29 Routine/Complete Inspection No Violations Noted At time of inspection, well is drilled and has been stimulated. The remaining three wells on the pad are also drilled and have been stimulated. On-site contractors appear to be preparing and maintaining equipment for the production of the wells.
2680915 Primary Facility 2018-01-10 Routine/Complete Inspection No Violations Noted At time of inspection, well 4H is drilled and appears equipped for production. Wells 1H, 2H, and 3H are also drilled and appear equipped for production.
2709841 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2724358 Primary Facility 2018-04-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 4H is drilled and appears equipped for production. Wells 1H, 2H, and 3H are also drilled and appear equipped for production.
2743230 Primary Facility 2018-06-13 Routine/Partial Inspection No Violations Noted At time of inspection, well 4H is drilled and appears equipped for production. Wells 1H, 2H, and 3H are also drilled and appear equipped for production.
2766749 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2818438 Primary Facility 2018-12-17 Site Restoration No Violations Noted Inspection conducted in response to Post Drilling Restoration Report received by Department.

Well appears to be in production. Well head surrounded by cement barriers. Three brine tanks located on site. This restoration report has been reviewed and is approved.

2821033 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[8]

References