X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31262

Well Details

Well ID: 37-005-31262
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: SNYDER BROS INC
Well Pad ID: 153668
Farm/Lease Name: RENSHAW 2H
License Status:
Spud Date:
Permit Date: 2016-05-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.715936
Longitude: -79.621589

For data sources see[1][2][3]

Well History

Date Event
2016-05-12 New Permit Application
2017-03-08 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-17 2017-11-06 6,925 13,795,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 MBC-516 Keane Biocide glutaral 111-30-8 26.7 0.0024755 3160.69
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000492319 628.587
didecyldimethylammonium chloride 7173-51-5 8 0.000738942 943.473
KSI-19NW Keane Scale Inhibitor Methanol 67-56-1 30 0.00521498 6658.43
KAI-12 Keane Acid Inhibitor ethylbenzene 100-41-4 1 0.00001368 17.461
xylene 1330-20-7 5 0.00006838 87.303
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00006838 87.303
isoproyl alcohol 67-63-0 5 0.00006838 87.303
prop-2-yn-1-ol 107-19-7 5 0.00006838 87.303
Methanol 67-56-1 90 0.00123079 1571.46
Fatty imidazoline 61790-69-0 5 0.00006838 87.303
KFR-16FW Keane Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0167227 21351.4
oleic acid diethanolamide 93-83-4 1.5 0.0012542 1601.35
Water 7732-18-5 60 0.0501682 64054.2
alcohols, C12-16, ethoxylated 68551-12-2 1 0.000836136 1067.57
ammonium chloride 12125-02-9 1.5 0.0012542 1601.35
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 85 0.563609 719610
Hydrochloric Acid 7647-01-0 15 0.0994604 126990
Other Chemical(s) Listed Above See Trade Name(s) List Fatty imidazoline 61790-69-0 5 0.00006838 87.303
xylene 1330-20-7 5 0.00006838 87.303
didecyldimethylammonium chloride 7173-51-5 8 0.000738942 943.473
isoproyl alcohol 67-63-0 5 0.00006838 87.303
ammonium chloride 12125-02-9 1.5 0.0012542 1601.35
alcohols, C12-16, ethoxylated 68551-12-2 1 0.000836136 1067.57
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0167227 21351.4
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000492319 628.587
Water 7732-18-5 85 0.563609 719610
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00006838 87.303
ethylbenzene 100-41-4 1 0.00001368 17.461
Water 7732-18-5 92.5 0 0
prop-2-yn-1-ol 107-19-7 5 0.00006838 87.303
oleic acid diethanolamide 93-83-4 1.5 0.0012542 1601.35
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 9.05843 11,565,700.0
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 90.1669 115,124,000.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2018 SNYDER BROS INC 1,343,014.00 319 0.00 0 0.00 0
2019 SNYDER BROS INC 886,973.00 281 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SNYDER BROS INC 1,991.25 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC 888.35 Tons LANDFILL 100585
2017 SNYDER BROS INC Drilling Fluid Waste 1,991.25 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid 237.60 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 106.30 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 SNYDER BROS INC Produced Fluid 140.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Synthetic Liner Materials 4.08 Tons LANDFILL 100585
2017 SNYDER BROS INC Drill Cuttings 888.35 Tons LANDFILL 100585
2018 SNYDER BROS INC Synthetic Liner Materials 3.89 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid 26,992.90 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 2,313.10 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid 11.30 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid 467.20 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 61.74 Tons LANDFILL 100585
2018 SNYDER BROS INC Filter Socks 0.73 Tons LANDFILL 100585
2019 SNYDER BROS INC Produced Fluid 13,294.20 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 1,301.10 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Produced Fluid 41.30 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 SNYDER BROS INC Produced Fluid 2,507.10 Bbl REUSE (AT WELL PAD)
2019 SNYDER BROS INC Produced Fluid 10.00 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2573227 Primary Facility 2017-03-20 Drilling/Alteration No Violations Noted Well spudded to 42' on 3/10/2017. Set 42' of new 24" conductor pipe. Cellar-casing look ok.
2580984 Primary Facility 2017-04-06 Routine/Complete Inspection No Violations Noted Drilling had commenced but was not ongoing at the time of the inspection. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2599997 Primary Facility 2017-05-23 Drilling/Alteration No Violations Noted The top hole Rig was drilling @ 1,700' at the time of this inspection. Ran 885' of 13 3/8" pipe-cemented with 655 sks cement-got good 20 bbl return. Daily drilling info and all equipment on site looked ok.
2606699 Primary Facility 2017-06-22 Routine/Complete Inspection No Violations Noted Top-hole drilling had been completed, drill rig had been moved off-site. Well development secondary containment located onsite and it appeared to be in sound condition. There was no evidence observed of any spills to the containment,i.e. There were no sheens observed in the puddles of precipitation on the secondary containment. All access road and site erosion controls had been properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2633970 Primary Facility 2017-09-08 Routine/Complete Inspection No Violations Noted Drilling was not ongoing at the time of the inspection. Secondary containment was located onsite. Minimal precipitation had accumulated on the containment. No sheens were observed in the puddles of water located on the containment. All erosion controls had been properly implemented and maintained as outlined in the E&S plan contained within the ESCGP. Disturbed areas, cut and fill slopes had been temporarily stabilized and vegetation had begun to emerge. There was no observed accelerated erosion or sedimentation in relation to the access road.
2647158 Primary Facility 2017-10-13 Routine/Complete Inspection No Violations Noted Well development impoundment construction had been completed and those areas disturbed by that construction had been temporarily stabilized. All site and access road erosion controls had been implemented and maintained as outlined in the E&S plan included within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Work was underway to set-up equipment and prepare the site for well stimulation activities slated to begin on 10/15/17. Secondary containment had been implemented as outlined in the containment plan.
2656697 Primary Facility 2017-11-03 Routine/Complete Inspection No Violations Noted The Keane frac crew was just getting ready to start fracking stage 32 on the 2H well at the time of this inspection. All site documentation and equipment looked ok.
2681580 Primary Facility 2018-01-11 Routine/Complete Inspection No Violations Noted At time of inspection, wells 1H, 2H, 3H, and 4H have been frac'd, not yet equipped for production. On-site contractors appear to be installing production equipment during this inspection.
2750715 Primary Facility 2018-07-11 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, containment dike and tank battery looks ok.

For data sources see[8]

References