X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31243

Well Details

Well ID: 37-005-31243
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 152962
Farm/Lease Name: FURNACE RUN
License Status: Active
Spud Date: 2016-01-20
Permit Date: 2015-09-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.851261
Longitude: -79.544492

For data sources see[1][2][3]

Well History

Date Event
2015-09-16 New Permit Application
2016-01-20 Performed Spud Operation
2016-05-13 Drilling Completion
2016-06-13 Performed Stage 1 of Stimulation
2016-06-14 Perforation
2016-06-14 Performed Stage 1 of Stimulation
2016-06-14 Performed Stage 2 of Stimulation
2016-06-15 Perforation
2016-06-15 Performed Stage 3 of Stimulation
2016-06-16 Perforation
2016-06-16 Performed Stage 4 of Stimulation
2016-06-17 Perforation
2016-06-17 Performed Stage 5 of Stimulation
2016-06-17 Performed Stage 6 of Stimulation
2016-06-18 Perforation
2016-06-18 Performed Stage 7 of Stimulation
2016-06-18 Performed Stage 8 of Stimulation
2016-06-19 Perforation
2016-06-19 Performed Stage 10 of Stimulation
2016-06-19 Performed Stage 9 of Stimulation
2016-06-20 Perforation
2016-06-20 Performed Stage 11 of Stimulation
2016-06-20 Performed Stage 12 of Stimulation
2016-06-20 Performed Stage 13 of Stimulation
2016-06-21 Perforation
2016-06-21 Performed Stage 14 of Stimulation
2016-06-21 Performed Stage 15 of Stimulation
2016-06-21 Performed Stage 16 of Stimulation
2016-06-22 Perforation
2016-06-22 Performed Stage 17 of Stimulation
2016-06-23 Perforation
2016-06-23 Performed Stage 18 of Stimulation
2016-06-23 Performed Stage 19 of Stimulation
2016-06-23 Performed Stage 20 of Stimulation
2016-06-24 Perforation
2016-06-24 Performed Stage 21 of Stimulation
2016-06-24 Performed Stage 22 of Stimulation
2016-06-25 Perforation
2016-06-25 Performed Stage 23 of Stimulation
2016-06-26 Perforation
2016-06-26 Performed Stage 24 of Stimulation
2016-06-26 Performed Stage 25 of Stimulation
2016-06-26 Performed Stage 26 of Stimulation
2016-06-27 Perforation
2016-06-27 Performed Stage 27 of Stimulation
2016-06-27 Performed Stage 28 of Stimulation
2016-06-27 Performed Stage 29 of Stimulation
2016-06-27 Performed Stage 30 of Stimulation
2016-06-28 Perforation
2016-06-28 Performed Stage 31 of Stimulation
2016-06-28 Performed Stage 32 of Stimulation
2016-06-29 Perforation
2016-06-29 Performed Stage 33 of Stimulation
2016-06-29 Performed Stage 34 of Stimulation
2016-06-29 Performed Stage 35 of Stimulation
2016-06-30 Perforation
2016-06-30 Performed Stage 36 of Stimulation
2016-06-30 Performed Stage 37 of Stimulation
2016-07-01 Perforation
2016-07-01 Performed Stage 38 of Stimulation
2016-07-01 Performed Stage 39 of Stimulation
2016-07-02 Perforation
2016-07-02 Performed Stage 40 of Stimulation
2016-07-02 Performed Stage 41 of Stimulation
2016-07-03 Perforation
2016-07-03 Performed Stage 42 of Stimulation
2016-07-03 Performed Stage 43 of Stimulation
2019-06-11 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-06-13 2016-07-03 6,524 13,528,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 EC6330a NALCO Scale Inhibitor Sodium Phosphate, Tribasic 7601-54-9 3 0.00027947 355.28
Ethylene Glycol 107-21-1 3 0.00027947 355.28
Water Snyder Brothers Carrier/Base Fluid Water 7732-18-5 100 88.8042 112,894,000.0
FFR730 NALCO Friction Reducer Oxyalkylated alcohol Proprietary 3 0.00116265 1478.04
K-139 NALCO Biocide Glutaraldehyde 111-30-8 3 0.000512756 651.85
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 7.5 0.00128189 1629.63
Ethanol 64-17-5 3 0.000512756 651.85
AI-600P Weatherford Corrosion Inhibitor Ethylene Glycol 107-21-1 30 0.000465812 592.172
Dimethylformamide 68-12-2 15 0.000232906 296.086
1-Octanol 111-87-5 3 0.00004658 59.217
Alkyl Pyridine 68391-11-7 0.6 0.00000854 10.856
2-Butoxyethanol 111-76-2 3 0.00004658 59.217
Methanol 67-56-1 1.8 0.00002717 34.543
Pyridine, alkyl derives, quaternized with Benzyl chloride 68909-18-2 10 0.000155271 197.391
Triethyl Phosphate 78-40-0 1.8 0.00002717 34.543
Cinnamaldehyde 104-55-2 10 0.000155271 197.391
Nonyl Phenol Ethoxylate, Branched 127087-87-0 10 0.000155271 197.391
1-Decanol 112-30-1 3 0.00004658 59.217
Sand (Proppant) Keane Proppant Crystallilne silica 14808-60-7 100 10.4582 13,295,200.0
FR-16FW Keane Friction Reducer Oleic Acid Diethanolamide 93-83-4 1.5 0.000445176 565.938
Water 7732-18-5 55 0.0163231 20751.1
Ammonium chloride 12125-02-9 1.5 0.000445176 565.938
Alcohols, C12-16, ethoxylated 68551-12-2 1 0.000296784 377.292
distillates (petroleum), hydrotreated light 64742-47-8 17.5 0.00519373 6602.61
FEAC-30 Keane Iron Control Acetic Acid 64-19-7 45 0.00100806 1281.52
Citric Acid 77-92-9 27.5 0.000616038 783.149
Hydrochloric Acid (15%) FSTI Acidizing Water 7732-18-5 75 0.47923 609229
Hydrochloric Acid 7647-01-0 15 0.095846 121846

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-06-13 1 13,528,326 8,815 9,396
2016-06-14 2 Silica Sand 13,528,326 8,019 8,687
2016-06-15 3 Silica Sand 13,528,326 7,742 8,953
2016-06-16 4 Silica Sand 13,528,326 7,646 8,667
2016-06-17 5 Silica Sand 13,528,326 7,801 8,279
2016-06-17 6 Silica Sand 13,528,326 7,841 9,028
2016-06-18 7 Silica Sand 13,528,326 7,791 8,360
2016-06-18 8 Silica Sand 13,528,326 7,550 8,928
2016-06-19 9 Silica Sand 13,528,326 7,649 8,295
2016-06-19 10 Silica Sand 13,528,326 7,521 8,741
2016-06-20 11 Silica Sand 13,528,326 7,795 8,906
2016-06-20 12 Silica Sand 13,528,326 7,774 8,839
2016-06-20 13 Silica Sand 13,528,326 7,838 9,193
2016-06-21 14 Silica Sand 13,528,326 7,614 8,428
2016-06-21 15 Silica Sand 13,528,326 7,554 8,178
2016-06-21 16 Silica Sand 13,528,326 7,542 9,010
2016-06-22 17 Silica Sand 13,528,326 8,319 9,382
2016-06-23 18 Silica Sand 13,528,326 7,395 8,080
2016-06-23 19 Silica Sand 13,528,326 7,297 7,681
2016-06-23 20 Silica Sand 13,528,326 7,332 7,935
2016-06-24 21 Silica Sand 13,528,326 7,501 9,227
2016-06-24 22 Silica Sand 13,528,326 7,203 9,496
2016-06-25 23 Silica Sand 13,528,326 6,918 7,306
2016-06-26 24 Silica Sand 13,528,326 7,095 7,693
2016-06-26 25 Silica Sand 13,528,326 7,324 7,736
2016-06-26 26 Silica Sand 13,528,326 7,015 7,605
2016-06-27 27 Silica Sand 13,528,326 6,860 7,098
2016-06-27 28 Silica Sand 13,528,326 7,089 7,751
2016-06-27 29 Silica Sand 13,528,326 6,969 9,254
2016-06-27 30 Silica Sand 13,528,326 6,958 7,210
2016-06-28 31 Silica Sand 13,528,326 7,052 7,589
2016-06-28 32 Silica Sand 13,528,326 6,944 7,274
2016-06-29 33 Silica Sand 13,528,326 6,803 7,081
2016-06-29 34 Silica Sand 13,528,326 7,056 7,402
2016-06-29 35 Silica Sand 13,528,326 6,581 7,174
2016-06-30 36 Silica Sand 13,528,326 6,986 8,862
2016-06-30 37 Silica Sand 13,528,326 6,638 6,899
2016-07-01 38 Silica Sand 13,528,326 6,440 8,202
2016-07-01 39 Silica Sand 13,528,326 6,910 7,501
2016-07-02 40 Silica Sand 13,528,326 6,778 7,608
2016-07-02 41 Silica Sand 13,528,326 6,786 7,242
2016-07-03 42 Silica Sand 13,528,326 7,030 8,298
2016-07-03 43 Silica Sand 13,528,326 6,556 7,763

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 SNYDER BROS INC 378,174.00 65 0.00 0 0.00 0
2017 SNYDER BROS INC 1,318,044.00 304 0.00 0 0.00 0
2018 SNYDER BROS INC 708,690.00 215 0.00 0 0.00 0
2019 SNYDER BROS INC 718,113.00 349 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 SNYDER BROS INC Drill Cuttings 1,279.92 Tons LANDFILL 100585
2016 SNYDER BROS INC Fracturing Fluid Waste 35.05 Bbl INJECTION DISPOSAL WELL 34-155-24079
2016 SNYDER BROS INC Produced Fluid 4,047.86 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SNYDER BROS INC Fracturing Fluid Waste 5,457.23 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SNYDER BROS INC Produced Fluid 77.60 Bbl INJECTION DISPOSAL WELL 34-155-24063
2016 SNYDER BROS INC Fracturing Fluid Waste 3,794.03 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 SNYDER BROS INC Drilling Fluid Waste 200.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SNYDER BROS INC Produced Fluid 142.69 Bbl INJECTION DISPOSAL WELL 34-133-24462
2016 SNYDER BROS INC Produced Fluid 2,264.75 Bbl INJECTION DISPOSAL WELL 34-155-24079
2016 SNYDER BROS INC Produced Fluid 5,845.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016 SNYDER BROS INC Fracturing Fluid Waste 52.20 Tons LANDFILL 100585
2016 SNYDER BROS INC Produced Fluid 232.81 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 SNYDER BROS INC Synthetic Liner Materials 7.02 Tons LANDFILL 100585
2016 SNYDER BROS INC Fracturing Fluid Waste 2,714.60 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 6,834.10 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC Produced Fluid 68.80 Bbl INJECTION DISPOSAL WELL 34-155-24063
2017 SNYDER BROS INC 12,229.71 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC 32.54 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC 6,233.27 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC 13.37 Tons LANDFILL 100585
2017 SNYDER BROS INC Produced Fluid 912.44 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Waste Water Treatment Sludge 13.37 Tons LANDFILL 100585
2017 SNYDER BROS INC Produced Fluid 13,372.74 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Synthetic Liner Materials 4.08 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid 1,321.70 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid 20,007.20 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 475.30 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SNYDER BROS INC Produced Fluid 11,265.30 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Other Oil & Gas Wastes 18.80 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 687.90 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Produced Fluid 2,384.90 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2441907 Primary Facility 2016-01-20 Routine/Complete Inspection No Violations Noted Pre-operational inspection. Site construction was still ongoing, perimeter E&S controls had been installed as outlined in the approved ESCGP. Conductor rig is to scheduled to be onsite the afternoon of 01/20/16. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2442036 Primary Facility 2016-01-20 Routine/Complete Inspection No Violations Noted Rocky Mountain getting ready to spud well in at time of inspection. Proper spud notification was made. Operator stoning well pad in preparation to install containment. All ok so far.
2443453 Primary Facility 2016-01-26 Drilling/Alteration No Violations Noted Well tagged-basement set-well spudded - 44' of 26" conductor pipe grouted in so far. Protective cage around basement.
2446472 Primary Facility 2016-02-03 Routine/Complete Inspection No Violations Noted Drilling had commenced but was not ongoing at the time of the inspection. Top-hole drill rig was enroute to the well-site. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2448022 Primary Facility 2016-02-08 Drilling/Alteration No Violations Noted Rig @ 398' at time of inspection. Balanced mine string cement job did not hold. Working with Operator on forward plan to re-cement mine string as required.
2448024 Primary Facility 2016-02-09 Drilling/Alteration No Violations Noted Operator re-cemented mine string. Hole dry and dusting as remediate mine string job worked. Rig @ 700' at time of this inspection and all is going well.
2448827 Primary Facility 2016-02-11 Drilling/Alteration No Violations Noted Ran 992' of 13 3/8" and cemented with 768 sks gas block cement-waited 12 hours-back to drilling @ 1350' at time of inspection. Drilling equipment and down hole paperwork looked ok.
2449742 Primary Facility 2016-02-16 Drilling/Alteration No Violations Noted Rig ran 1994' of J-55 LTC 9 5/8"-cemented with 589 sks of gas block cement. Cement returned-Rig shut down to wait on cement-centralizers in place. Rig drilling @ 2010' at time of this inspection.
2452091 Primary Facility 2016-02-23 Drilling/Alteration No Violations Noted Well @ 6122'. Rig tripped out-loading hole with 440 bbls synthetic oil getting ready to skid to #2 at time of this inspection. Operator installed sound wall for noise mitigation.
2466964 Primary Facility 2016-03-22 Routine/Complete Inspection No Violations Noted Drilling was ongoing for the Furnace Run 2H-A well at the time of the inspection. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2483422 Primary Facility 2016-05-11 Drilling/Alteration No Violations Noted Big finishing Rig Nomac 78 was drilling in the curve at 8550' @ time of this inspection. Daily drilling log - BOP tests - on site equipment looked ok.
2486076 Primary Facility 2016-05-19 Drilling/Alteration No Violations Noted Nomac 78 finishing rig had rigged down and equipment was moving off site @ time of this inspection. All equipment on site looked ok.
2492298 Primary Facility 2016-06-13 Drilling/Alteration No Violations Noted Keane had just moved in and hooked frac equipment up to this well and was pressure testing in prep for frac. Site equipment looked ok.
2500114 Primary Facility 2016-07-06 Drilling/Alteration No Violations Noted Last frac plug set in curve. Snubbing unit due in shortly. Frac stack being removed from well @ time of inspection. All equipment on site looked ok.
2505522 Primary Facility 2016-07-28 Routine/Complete Inspection No Violations Noted Drilling and well stimulation activities appeared to have been completed. Work was underway to equip the wells for production. Site work was underway related to the PCSM for the associated ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2528546 Primary Facility 2016-10-17 Routine/Complete Inspection No Violations Noted Well tagged-shut in. Annulus was shut. Well head casing-production set equipment-tank battery/containment dike looked ok.
2537998 Primary Facility 2016-11-18 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2546435 Primary Facility 2016-12-21 Site Restoration No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been effectively stabilized with vegetation achieving 70% uniform coverage all PCSM controls had been implemented as outlined in the site restoration plans.
2563712 Primary Facility 2017-02-21 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production, brine tank located onsite. Brine tank appeared to be in sound condition. No accelerated erosion or sedimentation observed in relation to the site or access road. AST that had been onsite for flowback containment had been deconstructed and removed. There was no staining observed indicative that any spills or leaks occurred.
2643083 Primary Facility 2017-10-03 Routine/Complete Inspection No Violations Noted All site and access road erosion controls had been implemented and maintained as outlined in the E&S plan included within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access. Brine tanks located onsite within secondary containment. Both the tanks and secondary containment appeared to be in sound condition.
2672739 Primary Facility 2017-12-19 Routine/Complete Inspection No Violations Noted At time of inspection, wells 1H, 2H-A, 3H-A, 4H all drilled and appear equipped for production.
2705285 Primary Facility 2018-03-14 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, tank battery and dike containment look excellent.
2771537 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by cement barriers. Four brine tanks on site.
2798013 Primary Facility 2018-11-05 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, dike containment and tank battery look ok.
2820995 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[9]

References