X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30864"

m
m
Line 208: Line 208:
 
| Bbl
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-37-007-24355
+
| 34-007-24355
 
| B & B OILFIELD SERVICE - MILLER & CO #3 (SWIW #28)
 
| B & B OILFIELD SERVICE - MILLER & CO #3 (SWIW #28)
 
| GARRETTSVILLE
 
| GARRETTSVILLE
Line 230: Line 230:
 
| Bbl
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-37-083-24137
+
| 34-083-24137
 
| ELKHEAD GAS & OIL - CHAPIN WELL # 7 (SWIW # 8)
 
| ELKHEAD GAS & OIL - CHAPIN WELL # 7 (SWIW # 8)
 
| HOWARD
 
| HOWARD
Line 241: Line 241:
 
| Bbl
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-37-155-21438
+
| 34-155-21438
 
| KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS
 
| KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS
 
| VIENNA
 
| VIENNA
Line 252: Line 252:
 
| Bbl
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-37-155-21447
+
| 34-155-21447
 
| KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS
 
| KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS
 
| VIENNA
 
| VIENNA
Line 285: Line 285:
 
| Bbl
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-37-121-23995
+
| 34-121-23995
 
| WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL
 
| WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL
 
| DEXTER CITY
 
| DEXTER CITY

Revision as of 15:26, 23 June 2014

Well Details

Well ID: 37-005-30864
Loading map...
County: Armstrong
Municipality: Kittanning Township
Operator Name: EQT PRODUCTION CO
Well Pad ID: 149393
Farm/Lease Name: SWANK 590636
First Permit Date: 2011-08-24
Last Permit Date: 2011-08-24
Spud Date: 2011-11-02
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: 1
Latitude: 40.71698
Longitude: -79.475697

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2013643 2011-10-25 No Violations Noted @ 40'
2013659 2011-10-26 No Violations Noted Site construction is still ongoing and the well had been spudded. Erosion controls had been implemented as outlined in the E&S plan contained within ESX10-005-0006.
2015289 2011-10-31 Violation(s) Noted Site construction was still underway on the well pad. Conductor pipe had been set for the wells on the pad. During construction activities, prior to lining the drill pits and impoundment onsite, the construction crews pumped out snow melt and precipitation to the sediment traps located on the western side of the well pad. Contact with EQT representative Brian Welsh and Trumbull representatie onsite found that this water was not tested in accordance with PA Code 25 Chapter 78.60 for pH or TDS. In addition this discharge of water toward the sediment trap entered a field drain and resulted in a direct discharge of this water to an UNT of Horney Camp Run. 623570
2015289 2011-10-31 Violation(s) Noted Site construction was still underway on the well pad. Conductor pipe had been set for the wells on the pad. During construction activities, prior to lining the drill pits and impoundment onsite, the construction crews pumped out snow melt and precipitation to the sediment traps located on the western side of the well pad. Contact with EQT representative Brian Welsh and Trumbull representatie onsite found that this water was not tested in accordance with PA Code 25 Chapter 78.60 for pH or TDS. In addition this discharge of water toward the sediment trap entered a field drain and resulted in a direct discharge of this water to an UNT of Horney Camp Run. 623570
2022321 2011-11-22 No Violations Noted @ 3310' tripping in hole
2023967 2011-12-02 No Violations Noted Plugged back to KOP 6080'
2025309 2011-11-09 No Violations Noted Site construction is still ongoing at the time of the inspection. Erosion controls had been implemented as outlined in the E&S plan contained within ESX10-005-0006. Drill and frac flowback pits were in the process of being lined. Met onsite with EQT representative Brian Welsh to review the location of a field drain located outside of the LOD for ESX10-005-0006 as a result of the transport of the discharge of precipitation related to the 10/31/11 inspection. Site review found that the field drain appears to be located approximately 50 feet downslope of the two sediment traps to the west side of the well pad. If the site E&S plan is followed properly and the site is temporarily stabilized with seed, mulch and subsequent vegetation and the sediment trap is properly maintained this should result in effectively minimizing accelerated erosion and sedimentation.
2036183 2012-01-23 No Violations Noted Site construction completed. Well had been spudded, drilling was not ongoing at the time of the inspection. Drill pit and well stimulation impoundments located onsite and they had more than the required two feet of lined freeboard.
2042052 2012-02-08 No Violations Noted @ 6524'
2049238 2012-02-16 No Violations Noted @ 8802'
2070690 2012-05-23 No Violations Noted Drilling had been completed at the time of the inspection. Site was in the process of being set up for well stimulation. Drill pit, flowback impoundment and freshwater impoundment were located onsite and all had more than the required two feet of lined freeboard. All well stimulation equipment onsite was located on containment. All erosion controls had been properly maintained and there was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site.
2086485 2012-07-19 No Violations Noted Fraced
2093404 2012-08-17 No Violations Noted Drilling complete on 4 wells. Production equipment being installed.
2098450 2012-09-07 No Violations Noted Drilling had been completed at the time of the inspection. Wells were in the process of being equipped for production. Brine tanks were observed onsite within containment. Brine tanks appeared to be in sound condition. Drilling pit located onsite and it contained fluids and drill cuttings. Drill pit had more than the required two feet of lined freeboard. Fresh-water impoundment located onsite and it had more than the required two feet of lined freeboard. Frac-flowback impoundment located onsite and it had been emptied except for a few small puddles of fluid. This impoundment was in the process of being prepped to remove the liner and regrade the impoundment. Twelve Baker tanks were observed onsite and both they and the well head apparatus were located on containment. All erosion controls were continuing to function properly and no evidence was observed of accelerated erosion or sedimentation.
2114015 2012-10-25 No Violations Noted Drill pit and frac flowback impoundment had been regraded and final site grading work was underway. Drill cuttings had been solidified and transported to the Evergreen landfill in Indiana County. Frac flowback sludge and frac flowback impoundment liner was contained in lined roll-off boxes onsite. There were four empty Veolia roll-offs still located onsite and there were approximately eight to ten sealed Waste Management roll-off boxes located onsite. Currently the storage of the roll-off boxes containing sludge from the frac flowback pit and the liner from the frac-flowback pit are not on secondary containment. This does not meet the requirements that all hydraulic fracturing additives and flowback be on containment as outlined in the Oil & Gas Act 3218.2(c). On future well pads all roll-off boxes which contain frac flowback sludge and frac flowback impoundment liner should be stored on containment to minimize the possibility of a discharge of liquids from these tanks onto the ground.
2122672 2012-12-10 No Violations Noted Drilling had been completed at the time of the inspection. Wells were in the process of being equipped for production. Brine tanks were observed onsite within containment. Brine tanks appeared to be in sound condition. Fresh-water impoundment located onsite and it had more than two feet of lined freeboard. All implemented erosion controls had been properly maintained. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 253375.0 115.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 PRODUCED FLUID 26.0 Bbl INJECTION DISPOSAL WELL 34-007-24355 B & B OILFIELD SERVICE - MILLER & CO #3 (SWIW #28) GARRETTSVILLE OH
2012-2 PRODUCED FLUID 100.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1 BLAZEK PUMP AND WELL HIRAM OH
2012-2 PRODUCED FLUID 745.0 Bbl INJECTION DISPOSAL WELL 34-083-24137 ELKHEAD GAS & OIL - CHAPIN WELL # 7 (SWIW # 8) HOWARD OH
2012-2 PRODUCED FLUID 683.0 Bbl INJECTION DISPOSAL WELL 34-155-21438 KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS VIENNA OH
2012-2 PRODUCED FLUID 160.0 Bbl INJECTION DISPOSAL WELL 34-155-21447 KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS VIENNA OH
2012-2 FRACING FLUID WASTE 2404.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 8794.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 301.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL DEXTER CITY OH
2012-1 DRILLING FLUID WASTE 769.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) WILLIAMSPORT PA
2012-1 DRILLING FLUID WASTE 1138.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-1 FRACING FLUID WASTE 7635.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING

References