If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30749 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.645241,"lon":-79.605636,"icon":""}]} |
County: Armstrong | |
Municipality: Gilpin Township | |
Operator Name: US ENERGY EXPLORATION CORP | |
Well Pad ID: | |
Farm/Lease Name: WOLAK 1 | |
First Permit Date: 2011-01-03 | |
Last Permit Date: 2011-01-03 | |
Spud Date: | |
Unconventional: No | |
Horizontal: No | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 40.645241 | |
Longitude: -79.605636 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1929831 | 2010-11-18 | No Violations Noted | Well was staked, site was not constructed at the time of the inspection. Contacted E&S plan preparer regarding minor changes to the plan. Specifically it was requested that the entire well pad be rocked with clean durable rock so as to minimize the amountof sediment generated during well development, the OG-57 application was revised to agree with the plan with respect to the encapsulation of the drill cuttings, and the diversion ditch collecting runoff from above the site was changed to direct runoff away from instead of towards the nearest residence. With these changes the E&S plan as compiled should effectively minimize accelerated erosion & sedimentation provided the plan is implemented and maintained properly. |
For data sources see[3]