X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-30188

Well Details

Well ID: 37-005-30188
Loading map...
Operator Name: BITTINGER DRILLING L A BITTINGER DBA
First Permit Date: 2009-02-10
Last Permit Date: 2009-02-10
Spud Date: 2009-09-09
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.86925
Longitude: -79.315491

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 2784.0 365.0 0.0 0.0 0.0 0.0
2012-0 2945.0 365.0 0.0 0.0 0.0 0.0
2011-0 4210.0 365.0 0.0 0.0 0.0 0.0
2010-0 5190.0 365.0 0.0 0.0 0.0 0.0
2009-0 500.0 45.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 60.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2010-0 PRODUCED FLUID 25.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2010-0 PRODUCED FLUID 40.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2011-0 PRODUCED FLUID 70.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2012-0 PRODUCED FLUID 60.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2013-0 PRODUCED FLUID 130.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1829414 2009-09-21 No Violations Noted Drilling appeared to have been completed at the time of the inspection. Belwo grade pit onsite and it had more than the two feet of required freeboard. Noted that the erosion control measures (i.e. filter fabric fence) had been installed properly. Observed no accelerated erosion & sedimentation in relation to the access road or well-site at the time of the inspection. The operator should continue to monitor the site for accelerated erosion & sedimentation until final restoration activities are completed.
1852022 2009-09-11 No Violations Noted conductor set and sanded in, cement returns, cellar bubbling at 9 5/8" X 7" annular space

References