X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-29773"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-29773
 
| Well ID: 37-005-29773
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.63, -79.366969 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.63, -79.366969 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 13: Line 13:
 
| Municipality: [[South Bend Township,_Armstrong_County,_Pennsylvania|South Bend Township]]
 
| Municipality: [[South Bend Township,_Armstrong_County,_Pennsylvania|South Bend Township]]
 
|-
 
|-
| Operator Name: [[DOMINION ENERGY TRANS INC]]
+
| Operator Name:  
 
|-
 
|-
 
| Well Pad ID: [[147045]]
 
| Well Pad ID: [[147045]]
Line 19: Line 19:
 
| Farm/Lease Name: HARRY D ANDES 3
 
| Farm/Lease Name: HARRY D ANDES 3
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2008-08-12
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2008-03-24
 
| Permit Date: 2008-03-24
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.63
 
| Latitude: 40.63
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-03-24
 +
| New Permit Application
 +
|-
 +
| 2008-08-12
 +
| Performed Spud Operation
 +
|-
 +
| 2008-08-26
 +
| Drilling Completion
 +
|-
 +
| 2009-01-29
 +
| New Permit Application
 +
|-
 +
| 2009-05-01
 +
| Drilling Completion
 +
|-
 +
| 2009-05-19
 +
| Perforation
 +
|-
 +
| 2009-09-10
 +
| DRILLED DEEPER
 +
|-
 +
| 2009-09-10
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 110:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 114: Line 164:
 
| 2009
 
| 2009
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
| style="text-align: right;" | 38,856.76
+
| style="text-align: right;" | 38856.76
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 204: Line 254:
 
| 2019
 
| 2019
 
| [[DOMINION ENERGY TRANS INC]]
 
| [[DOMINION ENERGY TRANS INC]]
| style="text-align: right;" | 1,958.00
+
| style="text-align: right;" | 7,917.00
| style="text-align: right;" | 90
+
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 230: Line 280:
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
 
| Drilling
 
| Drilling
| style="text-align: right;" | 910.00 Bbl
+
| style="text-align: right;" | 570.00 Bbl
 
| Brine or Industrial Waste Treatment Plt
 
| Brine or Industrial Waste Treatment Plt
| PA0091472
+
| PA0095443
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
 
| Drilling
 
| Drilling
| style="text-align: right;" | 900.00 Bbl
+
| style="text-align: right;" | 910.00 Bbl
 
| Brine or Industrial Waste Treatment Plt
 
| Brine or Industrial Waste Treatment Plt
| PA0095273
+
| PA0091472
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
 
| Drilling
 
| Drilling
| style="text-align: right;" | 570.00 Bbl
+
| style="text-align: right;" | 900.00 Bbl
 
| Brine or Industrial Waste Treatment Plt
 
| Brine or Industrial Waste Treatment Plt
| PA0095443
+
| PA0095273
 
|-
 
|-
 
| 2008
 
| 2008
Line 254: Line 304:
 
| Reuse other than road spreading
 
| Reuse other than road spreading
 
| 37-063-35665
 
| 37-063-35665
 +
|-
 +
| 2009
 +
| [[CONSOL GAS CO]]
 +
| Brine
 +
| style="text-align: right;" | 300.00 Bbl
 +
| Brine or Industrial Waste Treatment Plt
 +
| PA0091472
 
|-
 
|-
 
| 2009
 
| 2009
Line 264: Line 321:
 
| 2009
 
| 2009
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
| Fracking Fluid
+
| Brine
| style="text-align: right;" | 6,800.00 Bbl
+
| style="text-align: right;" | 1,825.00 Bbl
 
| Brine or Industrial Waste Treatment Plt
 
| Brine or Industrial Waste Treatment Plt
| PA0091472
+
| PA0095273
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
| Drilling
+
| Brine
| style="text-align: right;" | 850.00 Bbl
+
| style="text-align: right;" | 100.00 Bbl
 
| Brine or Industrial Waste Treatment Plt
 
| Brine or Industrial Waste Treatment Plt
 
| PA0095443
 
| PA0095443
Line 279: Line 336:
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
 
| Drilling
 
| Drilling
| style="text-align: right;" | 1,000.00 Bbl
+
| style="text-align: right;" | 40.00 Bbl
 
| Other
 
| Other
| 37-129-27582
+
| 37-125-23141
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
 
| Drilling
 
| Drilling
| style="text-align: right;" | 100.00 Bbl
+
| style="text-align: right;" | 850.00 Bbl
| Other
 
| 37-125-23269
 
|-
 
| 2009
 
| [[CONSOL GAS CO]]
 
| Brine
 
| style="text-align: right;" | 100.00 Bbl
 
 
| Brine or Industrial Waste Treatment Plt
 
| Brine or Industrial Waste Treatment Plt
 
| PA0095443
 
| PA0095443
Line 300: Line 350:
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
 
| Fracking Fluid
 
| Fracking Fluid
| style="text-align: right;" | 100.00 Bbl
+
| style="text-align: right;" | 6,800.00 Bbl
| Other
 
| 37-063-36161
 
|-
 
| 2009
 
| [[CONSOL GAS CO]]
 
| Brine
 
| style="text-align: right;" | 300.00 Bbl
 
 
| Brine or Industrial Waste Treatment Plt
 
| Brine or Industrial Waste Treatment Plt
 
| PA0091472
 
| PA0091472
Line 313: Line 356:
 
| 2009
 
| 2009
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
| Brine
+
| Drilling
| style="text-align: right;" | 1,825.00 Bbl
+
| style="text-align: right;" | 100.00 Bbl
| Brine or Industrial Waste Treatment Plt
+
| Other
| PA0095273
+
| 37-125-23269
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
 
| Fracking Fluid
 
| Fracking Fluid
| style="text-align: right;" | 3,900.00 Bbl
+
| style="text-align: right;" | 100.00 Bbl
| Brine or Industrial Waste Treatment Plt
+
| Other
| PA0095443
+
| 37-063-36161
 
|-
 
|-
 
| 2009
 
| 2009
Line 335: Line 378:
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
 
| Drilling
 
| Drilling
| style="text-align: right;" | 40.00 Bbl
+
| style="text-align: right;" | 1,000.00 Bbl
 
| Other
 
| Other
| 37-125-23141
+
| 37-129-27582
 +
|-
 +
| 2009
 +
| [[CONSOL GAS CO]]
 +
| Fracking Fluid
 +
| style="text-align: right;" | 3,900.00 Bbl
 +
| Brine or Industrial Waste Treatment Plt
 +
| PA0095443
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
| Drilling Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 1,300.00 Bbl
+
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
Line 348: Line 398:
 
| 2010
 
| 2010
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 1,000.00 Bbl
 
| style="text-align: right;" | 1,000.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 355: Line 405:
 
| 2010
 
| 2010
 
| [[CONSOL GAS CO]]
 
| [[CONSOL GAS CO]]
| Fracing Fluid Waste (in Barrels)
+
| Drilling Fluid Waste
| style="text-align: right;" | 100.00 Bbl
+
| style="text-align: right;" | 1,300.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
Line 362: Line 412:
 
| 2011
 
| 2011
 
| [[DOMINION ENERGY TRANS INC]]
 
| [[DOMINION ENERGY TRANS INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 369: Line 419:
 
| 2011
 
| 2011
 
| [[DOMINION ENERGY TRANS INC]]
 
| [[DOMINION ENERGY TRANS INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 89.00 Bbl
 
| style="text-align: right;" | 89.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 376: Line 426:
 
| 2012
 
| 2012
 
| [[DOMINION ENERGY TRANS INC]]
 
| [[DOMINION ENERGY TRANS INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 365.00 Bbl
 
| style="text-align: right;" | 365.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 383: Line 433:
 
| 2014
 
| 2014
 
| [[DOMINION ENERGY TRANS INC]]
 
| [[DOMINION ENERGY TRANS INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 66.00 Bbl
 
| style="text-align: right;" | 66.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 390: Line 440:
 
| 2015
 
| 2015
 
| [[DOMINION ENERGY TRANS INC]]
 
| [[DOMINION ENERGY TRANS INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 247.00 Bbl
 
| style="text-align: right;" | 247.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 397: Line 447:
 
| 2015
 
| 2015
 
| [[DOMINION ENERGY TRANS INC]]
 
| [[DOMINION ENERGY TRANS INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 200.00 Bbl
 
| style="text-align: right;" | 200.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 403: Line 453:
 
|-
 
|-
 
| 2017
 
| 2017
| [[DOMINION ENERGY TRANS INC]]
 
| Waste comment only
 
| style="text-align: right;" | 0.00
 
|
 
 
|  
 
|  
 +
 +
| style="text-align: right;" | 90.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-009-23821
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[DOMINION ENERGY TRANS INC]]
 
| [[DOMINION ENERGY TRANS INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 90.00 Bbl
 
| style="text-align: right;" | 90.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-009-23821
 
| 34-009-23821
 +
|-
 +
| 2017
 +
|
 +
 +
| style="text-align: right;" | 0.00
 +
|
 +
|
 +
|-
 +
| 2017
 +
|
 +
| Waste comment only
 +
| style="text-align: right;" | 0.00
 +
|
 +
|
 
|-
 
|-
 
| 2018
 
| 2018
| [[DOMINION ENERGY TRANS INC]]
+
|  
 
| Waste comment only
 
| Waste comment only
 
| style="text-align: right;" | 0.00  
 
| style="text-align: right;" | 0.00  
Line 424: Line 488:
 
|-
 
|-
 
| 2019
 
| 2019
| [[DOMINION ENERGY TRANS INC]]
+
|  
 
| Waste comment only
 
| Waste comment only
 
| style="text-align: right;" | 0.00  
 
| style="text-align: right;" | 0.00  
 
|  
 
|  
 +
|
 +
|-
 +
| 2019
 +
|
 +
| Waste comment only
 +
| style="text-align: right;" | 0.00
 +
| NO VALUE REPORTED
 
|  
 
|  
 
|-
 
|-

Latest revision as of 01:10, 2 June 2020

Well Details

Well ID: 37-005-29773
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Bend Township
Operator Name:
Well Pad ID: 147045
Farm/Lease Name: HARRY D ANDES 3
License Status: ACTIVE
Spud Date:
Permit Date: 2008-03-24
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.63
Longitude: -79.366969

For data sources see[1][2][3]

Well History

Date Event
2008-03-24 New Permit Application
2008-08-12 Performed Spud Operation
2008-08-26 Drilling Completion
2009-01-29 New Permit Application
2009-05-01 Drilling Completion
2009-05-19 Perforation
2009-09-10 DRILLED DEEPER
2009-09-10 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1997 ABARTA OIL & GAS CO INC 0.00 0 0.00 0 0.00 0
1998 ABARTA OIL & GAS CO INC 0.00 0 0.00 0 0.00 0
2008 CONSOL GAS CO 0.00 0 0.00 0 0.00 0
2009 CONSOL GAS CO 38856.76 365 0.00 0 0.00 0
2010 DOMINION ENERGY TRANS INC 39,626.50 366 0.00 0 0.00 0
2011 DOMINION ENERGY TRANS INC 20,493.00 365 0.00 0 0.00 0
2012 DOMINION ENERGY TRANS INC 21,756.00 366 0.00 0 0.00 0
2013 DOMINION ENERGY TRANS INC 20,454.00 364 0.00 0 0.00 0
2014 DOMINION ENERGY TRANS INC 34,551.00 364 0.00 0 0.00 0
2015 DOMINION ENERGY TRANS INC 9,377.00 361 0.00 0 0.00 0
2016 DOMINION ENERGY TRANS INC 8,445.00 365 0.00 0 0.00 0
2017 DOMINION ENERGY TRANS INC 6,930.00 365 0.00 0 0.00 0
2018 DOMINION ENERGY TRANS INC 8,015.00 362 0.00 0 0.00 0
2019 DOMINION ENERGY TRANS INC 7,917.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 CONSOL GAS CO Drilling 570.00 Bbl Brine or Industrial Waste Treatment Plt PA0095443
2008 CONSOL GAS CO Drilling 910.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2008 CONSOL GAS CO Drilling 900.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2008 CONSOL GAS CO Drilling 900.00 Bbl Reuse other than road spreading 37-063-35665
2009 CONSOL GAS CO Brine 300.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009 CONSOL GAS CO Fracking Fluid 100.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2009 CONSOL GAS CO Brine 1,825.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2009 CONSOL GAS CO Brine 100.00 Bbl Brine or Industrial Waste Treatment Plt PA0095443
2009 CONSOL GAS CO Drilling 40.00 Bbl Other 37-125-23141
2009 CONSOL GAS CO Drilling 850.00 Bbl Brine or Industrial Waste Treatment Plt PA0095443
2009 CONSOL GAS CO Fracking Fluid 6,800.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009 CONSOL GAS CO Drilling 100.00 Bbl Other 37-125-23269
2009 CONSOL GAS CO Fracking Fluid 100.00 Bbl Other 37-063-36161
2009 CONSOL GAS CO Drilling 9,100.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009 CONSOL GAS CO Drilling 1,000.00 Bbl Other 37-129-27582
2009 CONSOL GAS CO Fracking Fluid 3,900.00 Bbl Brine or Industrial Waste Treatment Plt PA0095443
2010 CONSOL GAS CO Fracing Fluid Waste 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 CONSOL GAS CO Produced Fluid 1,000.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 CONSOL GAS CO Drilling Fluid Waste 1,300.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 DOMINION ENERGY TRANS INC Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 DOMINION ENERGY TRANS INC Produced Fluid 89.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 DOMINION ENERGY TRANS INC Produced Fluid 365.00 Bbl INJECTION DISPOSAL WELL 34-167-28462
2014 DOMINION ENERGY TRANS INC Produced Fluid 66.00 Bbl INJECTION DISPOSAL WELL 34-167-28462
2015 DOMINION ENERGY TRANS INC Produced Fluid 247.00 Bbl INJECTION DISPOSAL WELL 34-167-28462
2015 DOMINION ENERGY TRANS INC Produced Fluid 200.00 Bbl INJECTION DISPOSAL WELL 34-009-23821
2017 90.00 Bbl INJECTION DISPOSAL WELL 34-009-23821
2017 DOMINION ENERGY TRANS INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-009-23821
2017 0.00
2017 Waste comment only 0.00
2018 Waste comment only 0.00
2019 Waste comment only 0.00
2019 Waste comment only 0.00 NO VALUE REPORTED

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1727928 Primary Facility 2008-08-13 Drilling/Alteration No Violations Noted Spudded 8/12/08. Pits/tanks/freeboard/E&S controls OK.
1794219 Primary Facility 2009-04-24 Drilling/Alteration No Violations Noted MARCELLUS/Falcon Drilling rigging-up to drill deeper/ID&pit ok/E&S ok
1796616 Primary Facility 2009-05-07 Routine/Complete Inspection No Violations Noted Drilling was completed at the time of the inspection, well had not been equipped for production. Below grade pit located onsite, and it had more than the 2 feet of required freeboard. No accelerated erosion & sedimentation noted in relation to the well pad or access road.
1800543 Primary Facility 2009-05-14 Routine/Complete Inspection No Violations Noted MARCELLUS/well being prepared to be frac'd/ID&pit ok/E&S ok
2411736 Primary Facility 2015-09-30 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated eorsion in relation to the site or access road. It was noted that the well was located amongst a cultivated agricultural field.
2440531 Primary Facility 2016-01-13 Routine/Complete Inspection No Violations Noted Well tagged-in production. Annulus open. Well head casing-production equipment-2-100 bbl tanks-dike all look ok.
2667345 Primary Facility 2017-11-21 Routine/Complete Inspection No Violations Noted At time of inspection, well drilled and appears equipped for production.
2686914 Primary Facility 2018-01-26 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production equipment, two grounded 100 bbl fiberglass tanks and containment dike look ok. I am placing a call to the operator to request that the dike drain plug be placed back into the end of the drain outside of the dike.
2689389 Primary Facility 2018-02-01 Routine/Complete Inspection No Violations Noted At time of inspection, well is drilled and appears equipped for production.

For data sources see[7]

References