X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435160214002

Well Details

Well ID: 0435160214002
Loading map...
Location: 00/14-02-043-16W5/2
Location Alias: 00/14-02-43-16 W5M
Location Alias 2: 00/14-02-043-16 W5/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 16
Section: 02
County/Municipality: Clearwater County
Well Name: IKM STOLBERG 14-2-43-16
Operator Name: Briko Energy Corp.
License Number: 0258269
License Date: 2001-08-07
License Status: Suspension
Spud Date: 2001-09-07
Final Drill Date: 2001-09-27
Well Total Depth: 1485.00 m
Surface Hole Latitude: 52.679354
Surface Hole Longitude: -116.218985

For data sources see[1][2]

Well History

Date Event
2001-08-07 Obtained License
2001-09-10 Surface Casing Operation Performed
2001-09-11 Direction Drilling Operation Performed - Deviate
2001-09-16 Drill Stem Test Performed
2001-09-19 Direction Drilling Operation Performed - Deviate
2001-09-23 Drill Stem Test Performed
2001-09-24 Drill Stem Test Performed
2001-09-25 Drill Stem Test Performed
2001-09-26 Well Log Performed
2001-09-27 Finished Drilling
2001-09-27 Well Log Performed
2001-09-29 Production Casing Operation Performed
2001-09-30 Rig Released
2001-09-30 Well Mode changed to Drilled and Cased
2001-12-11 Well Log Performed
2001-12-12 Perforation Treatment Performed - Jet Perforation
2001-12-12 Well Log Performed
2001-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-17 Perforation Treatment Performed - Fractured
2002-01-11 Well Began Production
2002-01-11 Well Fluid changed to Crude Oil
2002-01-11 Well Mode changed to Pumping
2012-06-08 Well Fluid changed to Crude Oil
2012-06-08 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-09-11 329.00 Deviate (5 - 79 degrees)
2001-09-19 721.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-12-12 Perforation 1127.00 1131.00 13
2001-12-12 Perforation 1137.00 1141.00 13
2001-12-17 Acid Treatment 1127.00 1141.00 0
2001-12-17 Fracture 1127.00 1141.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 7792 0.0 0.0 0.0
2003 2838 0.0 0.0 0.0
2004 2619 0.0 0.0 0.0
2005 7436 0.0 0.0 0.0
2006 5874 0.0 0.0 0.0
2007 7143 0.0 0.0 0.0
2008 6641 0.0 0.0 0.0

For data sources see[6]

References