X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-25869

Well Details

Well ID: 37-005-25869
Loading map...
Operator Name: KRIEBEL MINERALS INC
First Permit Date: 1997-11-06
Last Permit Date: 1997-11-06
Spud Date: 1998-07-30
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.747408
Longitude: -79.467465

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 6378.0 322.0 0.0 0.0 0.0 0.0
2012-0 7339.0 324.0 0.0 0.0 0.0 0.0
2011-0 7869.0 323.0 0.0 0.0 0.0 0.0
2010-0 9557.0 353.0 0.0 0.0 0.0 0.0
2009-0 9736.0 329.0 0.0 0.0 0.0 0.0
2008-0 10113.0 335.0 0.0 0.0 0.0 0.0
2007-0 11697.0 365.0 0.0 0.0 0.0 0.0
2006-0 13303.0 358.0 0.0 0.0 0.0 0.0
2005-0 14510.0 365.0 0.0 0.0 0.0 0.0
2004-0 16512.0 366.0 0.0 0.0 0.0 0.0
2003-0 18962.0 365.0 0.0 0.0 0.0 0.0
2002-0 20783.0 364.0 0.0 0.0 0.0 0.0
2001-0 23039.0 364.0 0.0 0.0 0.0 0.0
2000-0 18792.0 365.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2002-0 BRINE 30.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT FRANKLIN BRINE -- INDIANA PLT
2004-0 BRINE 40.0 Bbl OTHER PENNSYLVANIA BRINE TREATMENT
2010-0 PRODUCED FLUID 45.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2011-0 PRODUCED FLUID 45.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
902311 1999-12-02 No Violations Noted EQUIP/RESTOR/TANK & TAG
1958305 2011-03-16 No Violations Noted Drilling was completed on 08/02/98. Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and appeared to be in sound condition. No accelerated erosion & sedimentation was observed in relation to the access road or well-site.

References