X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-169-22083"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-169-22083
 
| Well ID: 34-169-22083
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.901289548, -81.7560946735 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.90128504, -81.75641613 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Wayne County, Ohio|Wayne]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[BERNHARDT JAMES R INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 1979-01-27
 
| Spud Date: 1979-01-27
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Final Restoration
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.901289548
+
| Latitude: 40.90128504
 
|-
 
|-
| Longitude: -81.7560946735
+
| Longitude: -81.75641613
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 1984-0
 +
| style="text-align:right;" | 1667.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1985-0
 +
| style="text-align:right;" | 1138.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1986-0
 +
| style="text-align:right;" | 1020.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1987-0
 +
| style="text-align:right;" | 600.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1988-0
 +
| style="text-align:right;" | 247.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1989-0
 +
| style="text-align:right;" | 5.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1990-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1991-0
 +
| style="text-align:right;" | 3313.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1992-0
 +
| style="text-align:right;" | 2947.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1993-0
 +
| style="text-align:right;" | 1830.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1994-0
 +
| style="text-align:right;" | 2187.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1995-0
 +
| style="text-align:right;" | 1768.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1996-0
 +
| style="text-align:right;" | 1887.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1997-0
 +
| style="text-align:right;" | 1715.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1999-0
 +
| style="text-align:right;" | 1614.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2000-0
 +
| style="text-align:right;" | 1959.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2001-0
 +
| style="text-align:right;" | 1818.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2002-0
 +
| style="text-align:right;" | 1221.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2003-0
 +
| style="text-align:right;" | 971.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2004-0
 +
| style="text-align:right;" | 527.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2005-0
 +
| style="text-align:right;" | 719.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2006-0
 +
| style="text-align:right;" | 676.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2009-0
 +
| style="text-align:right;" | 930.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 639.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 274:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1330147034
 
| -1330147034
 
| 2004-01-07
 
| 2004-01-07
|
+
|  
 
| Grout top of hole with 3 yards to surface . Cement remained at surface after job was complete.The top of the clay was about 115 ft.---fill to surface with cement from that point.
 
| Grout top of hole with 3 yards to surface . Cement remained at surface after job was complete.The top of the clay was about 115 ft.---fill to surface with cement from that point.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -452037934
 
| 2003-12-23
 
|
 
| Returned today and set Lime plug at 2380 with rock and stone and tree. 500 shovels
 
|
 
|
 
|
 
|-
 
|-
 
| -468145739
 
| 2003-12-22
 
|
 
| Set bottom plug and rip 4 1/2 casing . Set bottom plug with 300shovels clay.Then after rip set another 300 shovels.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 145019507
 
| 145019507
 
| 2003-12-31
 
| 2003-12-31
|
+
|  
 
| After having problem with bridge it did set at 790ft and Glen Davis filled back to 700ft on 12/302003 Today tag plug at 700ft and run in hole with 41/2 casing to 250ft and fill to surface with 5 tons of clay.
 
| After having problem with bridge it did set at 790ft and Glen Davis filled back to 700ft on 12/302003 Today tag plug at 700ft and run in hole with 41/2 casing to 250ft and fill to surface with 5 tons of clay.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1496505067
 
| 1496505067
 
| 2003-12-24
 
| 2003-12-24
|
+
|  
 
| Found that the Operator is not going to plug today because he is waiting for fishing equipment and will not be ready until after Christmas.
 
| Found that the Operator is not going to plug today because he is waiting for fishing equipment and will not be ready until after Christmas.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 217573287
 
| 217573287
 
| 2003-12-29
 
| 2003-12-29
|
+
|  
 
| The operator is fishing for 7 inch casing and should be ready to pull all of it today.
 
| The operator is fishing for 7 inch casing and should be ready to pull all of it today.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -452037934
 +
| 2003-12-23
 +
|
 +
| Returned today and set Lime plug at 2380 with rock and stone and tree. 500 shovels
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -468145739
 +
| 2003-12-22
 +
|
 +
| Set bottom plug and rip 4 1/2 casing . Set bottom plug with 300shovels clay.Then after rip set another 300 shovels.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 854022905
 
| 854022905
 
| 2004-09-02
 
| 2004-09-02
|
+
|  
 
| Meets requirements for restoration final.
 
| Meets requirements for restoration final.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 897664378
 
| 897664378
 
| 2003-12-30
 
| 2003-12-30
|
+
|  
 
| Check on rig and found that they are having trouble going in hole with the bridge and did get it set and it held at 790 ft. Fill to surface with clay.Plans are to let it settle over the weekend and top it off with grout to surface.
 
| Check on rig and found that they are having trouble going in hole with the bridge and did get it set and it held at 790 ft. Fill to surface with clay.Plans are to let it settle over the weekend and top it off with grout to surface.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 17:34, 15 July 2015

Well Details

Well ID: 34-169-22083
Loading map...
County: Wayne
Municipality:
Operator Name: BERNHARDT JAMES R INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1979-01-27
Unconventional: No
Configuration: Vertical
Well Status: Final Restoration
Violations: 0
Latitude: 40.90128504
Longitude: -81.75641613

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
1984-0 1667.0 0.0
1985-0 1138.0 0.0
1986-0 1020.0 0.0
1987-0 600.0 0.0
1988-0 247.0 0.0
1989-0 5.0 0.0
1990-0 0.0 0.0
1991-0 3313.0 0.0
1992-0 2947.0 0.0
1993-0 1830.0 0.0
1994-0 2187.0 0.0
1995-0 1768.0 0.0
1996-0 1887.0 0.0
1997-0 1715.0 0.0
1999-0 1614.0 0.0
2000-0 1959.0 0.0
2001-0 1818.0 0.0
2002-0 1221.0 0.0
2003-0 971.0 0.0
2004-0 527.0 0.0
2005-0 719.0 0.0
2006-0 676.0 0.0
2009-0 930.0 0.0
2010-0 639.0 0.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1330147034 2004-01-07 Grout top of hole with 3 yards to surface . Cement remained at surface after job was complete.The top of the clay was about 115 ft.---fill to surface with cement from that point.
145019507 2003-12-31 After having problem with bridge it did set at 790ft and Glen Davis filled back to 700ft on 12/302003 Today tag plug at 700ft and run in hole with 41/2 casing to 250ft and fill to surface with 5 tons of clay.
1496505067 2003-12-24 Found that the Operator is not going to plug today because he is waiting for fishing equipment and will not be ready until after Christmas.
217573287 2003-12-29 The operator is fishing for 7 inch casing and should be ready to pull all of it today.
-452037934 2003-12-23 Returned today and set Lime plug at 2380 with rock and stone and tree. 500 shovels
-468145739 2003-12-22 Set bottom plug and rip 4 1/2 casing . Set bottom plug with 300shovels clay.Then after rip set another 300 shovels.
854022905 2004-09-02 Meets requirements for restoration final.
897664378 2003-12-30 Check on rig and found that they are having trouble going in hole with the bridge and did get it set and it held at 790 ft. Fill to surface with clay.Plans are to let it settle over the weekend and top it off with grout to surface.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.