X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524260909000

Well Details

Well ID: 0524260909000
Loading map...
Location: 00/09-09-052-26W4/0
Location Alias: 00/09-09-52-26 W4M
Location Alias 2: 00/09-09-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 09
County/Municipality: Stony Plain 135
Well Name: CEDAR CREEK GSPIKE 9-9-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0020402
License Date: 1961-02-09
License Status: Suspension
Spud Date: 1961-02-15
Final Drill Date: 1961-03-18
Well Total Depth: 1575.20 m
Surface Hole Latitude: 53.477555
Surface Hole Longitude: -113.765743

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-02-09 Obtained License
1961-02-26 Drill Stem Test Performed
1961-02-28 Drill Stem Test Performed
1961-03-01 Drill Stem Test Performed
1961-03-03 Drill Stem Test Performed
1961-03-05 Drill Stem Test Performed
1961-03-06 Drill Stem Test Performed
1961-03-09 Drill Stem Test Performed
1961-03-13 Liner Casing Operation Performed
1961-03-16 Drill Stem Test Performed
1961-03-17 Drill Stem Test Performed
1961-03-18 Drill Stem Test Performed
1961-03-18 Finished Drilling
1961-03-18 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-03-18 Well Mode changed to Drilled and Cased
1961-04-02 Well Began Production
1961-04-02 Well Fluid changed to Crude Oil
1961-04-02 Well Mode changed to Flowing
1961-05-20 Perforation Treatment Performed - Acid Wash - No Pressure
1961-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-05-29 Well Fluid changed to Crude Oil
1961-05-29 Well Mode changed to Pumping
1961-12-20 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-11-29 Perforation Treatment Performed - Cement Squeeze
1962-12-06 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-12-10 Perforation Treatment Performed - Acid Wash - No Pressure
1962-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-20 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-12-20 Perforation Treatment Performed - Acid Wash - No Pressure
1965-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-13 Perforation Treatment Performed - Cement Squeeze
1981-01-07 Perforation Treatment Performed - Jet Perforation
1981-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-16 Well Began Injection
1981-01-16 Well Fluid changed to Water
1981-01-16 Well Type changed to Disposal
1982-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-31 Well Fluid changed to Water
1986-03-31 Well Mode changed to Suspended
1986-03-31 Well Type changed to Disposal
1994-03-16 Well Fluid changed to Water
1994-03-16 Well Type changed to Disposal
2007-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-28 Plug Back Performed
2007-10-28 Well Fluid changed to Water
2007-10-28 Well Mode changed to Abandoned Zone
2007-10-28 Well Type changed to Disposal
2007-11-03 Perforation Treatment Performed - Cement Plug
2007-11-03 Plug Back Performed
2007-11-04 Perforation Treatment Performed - Cement Plug
2007-11-05 Perforation Treatment Performed - Jet Perforation
2007-11-06 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-03-18 Hydra Jet Perforation 1557.80 1557.80 0
1961-05-20 Acid Wash 1557.80 1557.80 0
1961-05-21 Acid Treatment 1557.80 1557.80 16
1961-12-20 Hydra Jet Perforation 1556.90 1556.90 0
1962-11-29 Cement Squeeze 1556.90 1557.20 0
1962-12-06 Hydra Jet Perforation 1557.80 1557.80 0
1962-12-10 Acid Wash 1557.80 1557.80 0
1962-12-11 Acid Treatment 1557.80 1557.80 0
1964-12-20 Hydra Jet Perforation 1556.90 1556.90 0
1964-12-20 Acid Wash 1556.90 1557.80 0
1965-02-23 Acid Treatment 1556.90 1557.80 0
1980-12-13 Cement Squeeze 1556.90 1557.80 0
1981-01-07 Perforation 1560.60 1561.60 13
1981-01-10 Acid Treatment 1560.60 1561.60 0
1982-08-09 Acid Treatment 1560.60 1561.60 0
2007-10-28 Packing Device Capped w/Cement 1539.00 1547.00 0
2007-11-03 Cement Plug 1457.00 1539.00 0
2007-11-04 Cement Plug 834.00 900.00 0
2007-11-05 Perforation 521.80 522.50 99
2007-11-05 Perforation 356.00 356.50 99
2007-11-06 Remedial Casing Cementing 521.80 522.50 0
2007-11-06 Remedial Casing Cementing 356.00 356.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0

For data sources see[5]

References