X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706110110002

Well Details

Well ID: 0706110110002
Loading map...
Location: 00/10-01-070-11W6/2
Location Alias: 00/10-01-70-11 W6M
Location Alias 2: 00/10-01-070-11 W6/02
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 11
Section: 01
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 10-1-70-11
Operator Name: Cenovus Energy Inc.
License Number: 0074579
License Date: 1979-02-20
License Status: Issued
Spud Date: 1979-03-17
Final Drill Date: 1979-05-14
Well Total Depth: 2880.00 m
Surface Hole Latitude: 55.032990
Surface Hole Longitude: -119.53475

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-02-20 Obtained License
1979-04-02 Drill Stem Test Performed
1979-04-11 Drill Stem Test Performed
1979-04-17 Drill Stem Test Performed
1979-04-20 Well Log Performed
1979-05-11 Drill Stem Test Performed
1979-05-14 Finished Drilling
1979-05-19 Production Casing Operation Performed
1979-07-28 Perforation Treatment Performed - Jet Perforation
1979-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-08 Perforation Treatment Performed - Fractured
1979-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-11-01 Perforation Treatment Performed - Jet Perforation
1979-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-03 Perforation Treatment Performed - Fractured
1979-11-06 Perforation Treatment Performed - Fractured
1979-11-09 Perforation Treatment Performed - Jet Perforation
1979-11-12 Perforation Treatment Performed - Jet Perforation
1979-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-14 Perforation Treatment Performed - Fractured
1979-11-17 Perforation Treatment Performed - Fractured
1979-11-21 Perforation Treatment Performed - Jet Perforation
1979-12-05 Perforation Treatment Performed - Cement Squeeze
1979-12-06 Perforation Treatment Performed - Jet Perforation
1979-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-12-11 Perforation Treatment Performed - Jet Perforation
1979-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-13 Perforation Treatment Performed - Fractured
1979-12-18 Perforation Treatment Performed - Fractured
1980-01-05 Perforation Treatment Performed - Jet Perforation
1980-01-05 Well Mode changed to Drilled and Cased
1980-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-08 Perforation Treatment Performed - Fractured
1980-01-16 Drill Stem Test Performed
1980-01-16 Perforation Treatment Performed - Fractured
1994-03-15 Well Began Production
1994-03-15 Well Fluid changed to Gas
1994-03-15 Well Mode changed to Flowing
1994-08-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-28 Perforation 2776.00 2780.00 12
1979-07-29 Acid Treatment 2776.00 2780.00 0
1979-07-31 Acid Treatment 2776.00 2780.00 0
1979-08-08 Fracture 2776.00 2780.00 0
1979-10-31 Packing Device Capped w/Cement 2770.00 2770.00 0
1979-11-01 Perforation 2449.50 2462.00 6
1979-11-02 Acid Treatment 2449.50 2462.00 0
1979-11-03 Fracture 2449.50 2462.00 0
1979-11-06 Fracture 2449.50 2462.00 0
1979-11-09 Perforation 2438.00 2454.00 6
1979-11-12 Perforation 2220.00 2231.00 12
1979-11-13 Acid Treatment 2220.00 2231.00 0
1979-11-14 Fracture 2220.00 2231.00 0
1979-11-17 Fracture 2220.00 2231.00 0
1979-11-21 Perforation 2215.00 2220.00 6
1979-12-05 Cement Squeeze 2215.00 2231.00 0
1979-12-06 Perforation 1963.00 1968.00 6
1979-12-07 Acid Treatment 1963.00 1968.00 0
1979-12-10 Packing Device Capped w/Cement 1958.00 1958.00 0
1979-12-11 Perforation 1941.50 1947.00 10
1979-12-12 Acid Treatment 1941.50 1947.00 0
1979-12-13 Fracture 1941.50 1947.00 0
1979-12-18 Fracture 1941.50 1947.00 0
1980-01-05 Perforation 1848.50 1855.00 12
1980-01-06 Acid Treatment 1848.50 1855.00 0
1980-01-08 Fracture 1848.50 1855.00 0
1980-01-16 Fracture 1848.50 1855.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 3101 0.0 0.0 0.0

For data sources see[5]

References