X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425093005000

Well Details

Well ID: 0425093005000
Loading map...
Location: 00/05-30-042-09W5/0
Location Alias: 00/05-30-42-09 W5M
Location Alias 2: 00/05-30-042-09 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 09
Section: 30
County/Municipality: Clearwater County
Well Name: DEKALB ET AL FERRIER 5-30-42-9
Operator Name: Paramount Resources Ltd.
License Number: 0114290
License Date: 1985-04-22
License Status: RecCertified
Spud Date: 1985-06-11
Final Drill Date: 1985-07-08
Well Total Depth: 2540.00 m
Surface Hole Latitude: 52.644566
Surface Hole Longitude: -115.291561

For data sources see[1][2]

Well History

Date Event
1985-04-22 Obtained License
1985-06-11 Lost Circulation Occurred
1985-06-13 Surface Casing Operation Performed
1985-06-25 Well Log Performed
1985-06-26 Drill Stem Test Performed
1985-06-26 Well Log Performed
1985-07-08 Finished Drilling
1985-07-08 Well Log Performed
1985-07-08 Well Mode changed to Drilled and Cased
1985-07-09 Drill Stem Test Performed
1985-07-10 Drill Stem Test Performed
1985-07-11 Drill Stem Test Performed
1985-07-12 Production Casing Operation Performed
1985-07-13 Rig Released
1985-09-07 Well Log Performed
1985-09-12 Perforation Treatment Performed - Jet Perforation
1985-09-30 Perforation Treatment Performed - Fractured
1985-10-09 Perforation Treatment Performed - Jet Perforation
1985-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-13 Perforation Treatment Performed - Fractured
1986-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-06-03 Plug Back Performed
1986-06-03 Well Log Performed
1986-06-03 Well Mode changed to Abandoned Zone
1986-06-04 Perforation Treatment Performed - Jet Perforation
1986-06-09 Perforation Treatment Performed - Fractured
1989-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-10-25 Plug Back Performed
1989-10-25 Well Abandoned
1989-10-27 Perforation Treatment Performed - Jet Perforation
1989-10-27 Perforation Treatment Performed - Remedial Casing
1989-10-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-09-12 Perforation 2462.80 2464.50 13
1985-09-30 Fracture 2462.80 2464.50 0
1985-10-09 Perforation 2462.80 2464.50 13
1985-10-12 Acid Treatment 2462.80 2464.50 0
1985-10-13 Fracture 2462.80 2464.50 0
1986-06-03 Packing Device Capped w/Cement 2147.00 2155.00 0
1986-06-04 Perforation 2115.00 2116.00 13
1986-06-04 Perforation 2118.00 2119.00 13
1986-06-09 Fracture 2115.00 2119.00 0
1989-10-25 Packing Device Capped w/Cement 2092.00 2100.00 0
1989-10-27 Perforation 550.00 550.80 13
1989-10-27 Remedial Casing Cementing 550.00 550.80 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-06-11 Lost Circulation 65.00 65.00

For data sources see[5]

References