Well Details

Well ID: 34-153-23145
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-02-08
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.0334221674
Longitude: -81.557890462

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-170895460 2012-02-15 Poulson Drilling is moving off location. The pits are being pumped down by Pander Trucking.
-1917623222 2012-07-16 Preliminary Restoration is approved.
1326771211 2012-01-11 On site to excavate test holes in order to determine the depth to ground water. Holes were dug to the water table east, north and northeast of the well stake. The test area encountered peat under several feet of fill material. Water was encountered approximately four feet below ground level. The decision was made to excavate the pits to four feet and to place a berm two feet high around the pits with the liner extending across and over the berm.
1328535246 2012-02-02 Bass Energy has had the location cleared and has started building the location. Stone is being hauled in to build the drilling pad for Poulson Drilling. The required identification is posted at the entrance. No violations at this time.
1329149543 2012-02-10 Conductor casing was cemented 2/8 and surface casing on 2/9. Poulson is drilling ahead at 1380' on this date. The pits are fenced, lined and in good condition. No violations at this time.
1333655647 2012-03-21 Berry Well Service is on site to swab the well after frac and prior to running tubing and rods if necessary. Flowback is directed to a frac tank. No violations at this time.