X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166061911000

Well Details

Well ID: 1166061911000
Loading map...
Location: 00/11-19-116-06W6/0
Location Alias: 00/11-19-16-06 W6M
Location Alias 2: 00/11-19-116-06 W6/00
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 06
Section: 19
County/Municipality: Mackenzie County
Well Name: ACL AMBER 11-19-116-6
Operator Name: Paramount Resources Ltd.
License Number: 0107749
License Date: 1984-06-19
License Status: Abandoned
Spud Date: 1984-07-30
Final Drill Date: 1984-08-28
Well Total Depth: 1625.00 m
Surface Hole Latitude: 59.091145
Surface Hole Longitude: -119.013974

For data sources see[1][2]

Well History

Date Event
1984-06-19 Obtained License
1984-08-02 Surface Casing Operation Performed
1984-08-04 Lost Circulation Occurred
1984-08-16 Drill Stem Test Performed
1984-08-16 Lost Circulation Occurred
1984-08-18 Drill Stem Test Performed
1984-08-20 Lost Circulation Occurred
1984-08-21 Drill Stem Test Performed
1984-08-23 Drill Stem Test Performed
1984-08-25 Drill Stem Test Performed
1984-08-26 Lost Circulation Occurred
1984-08-27 Drill Stem Test Performed
1984-08-28 Drill Stem Test Performed
1984-08-28 Finished Drilling
1984-08-28 Well Log Performed
1984-08-28 Well Mode changed to Drilled and Cased
1984-08-29 Well Log Performed
1984-08-31 Drill Stem Test Performed
1984-09-01 Production Casing Operation Performed
1984-09-02 Rig Released
1984-12-11 Well Log Performed
1984-12-12 Perforation Treatment Performed - Jet Perforation
1984-12-12 Well Log Performed
1984-12-14 Well Began Production
1984-12-14 Well Fluid changed to Crude Oil
1984-12-14 Well Mode changed to Flowing
1985-02-19 Well Log Performed
1985-02-23 Well Log Performed
1988-02-12 Well Log Performed
1988-02-14 Perforation Treatment Performed - Jet Perforation
1989-03-02 Well Fluid changed to Crude Oil
1989-03-02 Well Mode changed to Suspended
1993-03-07 Well Fluid changed to Crude Oil
1993-03-07 Well Mode changed to Flowing
1993-10-15 Perforation Treatment Performed - Jet Perforation
1993-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-15 Perforation Treatment Performed - Jet Perforation
1995-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-23 Perforation Treatment Performed - Jet Perforation
1997-01-23 Well Log Performed
1997-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-29 Well Log Performed
1997-01-31 Perforation Treatment Performed - Cement Squeeze
1997-02-03 Well Log Performed
2001-05-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-07 Plug Back Performed
2001-05-07 Well Fluid changed to Crude Oil
2001-05-07 Well Mode changed to Abandoned Zone
2001-05-08 Perforation Treatment Performed - Jet Perforation
2001-05-08 Well Log Performed
2001-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-10 Perforation Treatment Performed - Jet Perforation
2001-05-10 Well Log Performed
2001-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-06-15 Well Log Performed
2004-06-17 Perforation Treatment Performed - Cement Squeeze
2004-06-20 Well Log Performed
2004-06-21 Perforation Treatment Performed - Jet Perforation
2004-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-03 Well Log Performed
2009-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-24 Plug Back Performed
2009-04-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-12-12 Perforation 1597.00 1599.00 13
1988-02-14 Perforation 1592.00 1594.00 13
1993-10-15 Perforation 1579.00 1581.00 13
1993-10-16 Acid Treatment 1579.00 1581.00 0
1995-04-15 Perforation 1529.00 1530.00 13
1995-04-15 Perforation 1536.00 1537.00 13
1995-04-16 Acid Treatment 1529.00 1537.00 0
1997-01-23 Perforation 1567.00 1570.00 13
1997-01-23 Perforation 1563.00 1566.00 13
1997-01-23 Perforation 1553.00 1558.00 13
1997-01-23 Perforation 1531.50 1539.00 13
1997-01-25 Acid Treatment 1531.50 1570.00 0
1997-01-31 Cement Squeeze 1563.00 1570.00 0
2001-05-07 Packing Device Capped w/Cement 1517.00 1525.00 0
2001-05-08 Perforation 1408.50 1411.00 14
2001-05-08 Perforation 1415.00 1417.00 14
2001-05-08 Perforation 1418.50 1420.00 14
2001-05-09 Acid Treatment 1408.50 1420.00 0
2001-05-10 Perforation 1345.00 1348.00 14
2001-05-10 Perforation 1360.00 1363.00 14
2001-05-10 Perforation 1369.00 1373.50 14
2001-05-11 Acid Treatment 1345.00 1373.00 0
2004-06-17 Cement Squeeze 1408.50 1420.00 0
2004-06-21 Perforation 1408.50 1411.00 13
2004-06-22 Acid Treatment 1408.50 1411.00 0
2009-03-24 Packing Device Capped w/Cement 1392.00 1400.00 0
2009-03-24 Packing Device Capped w/Cement 1329.00 1337.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 136 0.0 0.0 0.0
1985 3362 0.0 0.0 0.0
1986 3993 0.0 0.0 0.0
1987 6031 0.0 0.0 0.0
1988 5737 0.0 0.0 0.0
1989 1076 0.0 0.0 0.0
1993 4388 0.0 0.0 0.0
1994 5951 0.0 0.0 0.0
1995 4728 0.0 0.0 0.0
1996 7726 0.0 0.0 0.0
1997 2556 0.0 0.0 0.0
2000 1200 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-08-04 Lost Circulation 695.00 823.00
1984-08-16 Lost Circulation 1535.00 1535.00
1984-08-20 Lost Circulation 1545.00 1545.00
1984-08-26 Lost Circulation 1605.00 1625.00

For data sources see[6]

References