X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405030510003

Well Details

Well ID: 0405030510003
Loading map...
Location: 00/10-05-040-03W5/3
Location Alias: 00/10-05-40-03 W5M
Location Alias 2: 00/10-05-040-03 W5/03
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 03
Section: 05
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 10-5-40-3
Operator Name: Cenovus Energy Inc.
License Number: 0024085
License Date: 1963-04-29
License Status: Suspension
Spud Date: 1963-05-31
Final Drill Date: 1963-06-12
Well Total Depth: 2209.80 m
Surface Hole Latitude: 52.415733
Surface Hole Longitude: -114.394495

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-06-15 Perforation Treatment Performed - Jet Perforation
1962-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-25 Perforation Treatment Performed - Cement Squeeze
1962-06-26 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-04-29 Obtained License
1963-06-01 Lost Circulation Occurred
1963-06-12 Drill Stem Test Performed
1963-06-12 Finished Drilling
1963-06-12 Well Mode changed to Drilled and Cased
1963-06-14 Production Casing Operation Performed
1963-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-11-23 Perforation Treatment Performed - Jet Perforation
1963-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-11-29 Perforation Treatment Performed - Fractured
1965-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-08-05 Perforation Treatment Performed - Cement Plug
1995-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-03 Perforation Treatment Performed - Jet Perforation
1995-06-03 Well Log Performed
1995-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-22 Well Began Production
1995-06-22 Well Fluid changed to Crude Oil
1995-06-22 Well Mode changed to Pumping
2017-03-01 Well Fluid changed to Crude Oil
2017-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-06-15 Perforation 2177.20 2179.90 7
1962-06-20 Acid Treatment 2177.20 2179.90 0
1962-06-25 Cement Squeeze 2177.20 2179.90 0
1962-06-26 Hydra Jet Perforation 2166.80 2166.80 0
1962-06-27 Acid Treatment 2166.80 2166.80 0
1963-09-25 Acid Treatment 2166.80 2166.80 0
1963-11-23 Perforation 1929.40 1930.30 13
1963-11-25 Acid Treatment 1929.40 1930.30 0
1963-11-29 Fracture 1929.40 1930.30 0
1965-02-01 Acid Treatment 2166.80 2166.80 0
1970-08-05 Cement Plug 1929.40 1930.30 0
1995-06-03 Packing Device Capped w/Cement 2153.50 2156.50 0
1995-06-03 Perforation 2140.60 2147.60 13
1995-06-04 Acid Treatment 2140.60 2147.60 0
1995-06-09 Acid Treatment 2140.60 2147.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4372 0.0 0.0 0.0
1996 8598 0.0 0.0 0.0
1997 8575 0.0 0.0 0.0
1998 8742 0.0 0.0 0.0
1999 8304 0.0 0.0 0.0
2000 8675 0.0 0.0 0.0
2001 8632 0.0 0.0 0.0
2002 8731 0.0 0.0 0.0
2003 8540 0.0 0.0 0.0
2004 8744 0.0 0.0 0.0
2005 8578 0.0 0.0 0.0
2006 8727 0.0 0.0 0.0
2007 8159 0.0 0.0 0.0
2008 8514 0.0 0.0 0.0
2009 6768 0.0 0.0 0.0
2010 7695 0.0 0.0 0.0
2011 8161 0.0 0.0 0.0
2012 8058 0.0 0.0 0.0
2013 7011 0.0 0.0 0.0
2014 8478 0.0 0.0 0.0
2015 4986 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1963-06-01 Lost Circulation 117.30 117.30

For data sources see[6]

References