If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-059-24341 | | Well ID: 34-059-24341 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.12758403, -81.34572085 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Guernsey County, Ohio|Guernsey]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[AMERICAN ENERGY UTICA LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2014-06-25 | | Spud Date: 2014-06-25 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Drilling |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.12758403 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.34572085 |
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
+ | |- | ||
+ | | 12335113 | ||
+ | | 2014-11-13 | ||
+ | | | ||
+ | | On the day of my inspection I found that Nomac Drilling rig 80 had reached a total depth of 15985'. They were in the process of running new 5.5 production casing. AEU reported that a spill had just occurred prior to my arrival. They estimated that 20 gallons of oil based mud had been released from a CurryVac truck. The mud was released outside of containment. No fluid made it off of the drilling pad. The spill had been cleaned up by the time I was notified. The contaminated gravel had been scraped up and sent to the landfill. I did not observe any residual contamination at the spill site. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1403786729 | ||
+ | | 2014-06-26 | ||
+ | | | ||
+ | | On the day of my inspection accompanied by ODNR Inspector Brandon Trigg, I witnessed Precision Rathole Inc. drilled a 36 inch diameter hole to the depth of 100 feet and ran 100 feet of 30 inch 118.65#/ft. conductor pipe. O-Tex Pumping LLC was on site and gained circulation with 5bbls of fresh water, 15bbls of gel and 5bbls of fresh water. O-Tex cemented pipe with 370 sacks of class H cement with 2%CaCl, .4% C41P and | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1414428206 | ||
+ | | 2014-10-27 | ||
+ | | | ||
+ | | On the date of inspection I was informed by American Energy Utica (AEU) consultant Van Dietrich that the Nomac 80 rig had drilled a 17.5 inch diameter hole to a depth of 970 feet. Wyoming Casing Crew set 13.375 inch 54.50lbs/ft casing on bottom. O-Tex Pumping, LLC pumped 1270sk of Class H cement, 15.6ppg, 1.2 yield, 2% CaCl, 0.25lbs/sk flake, 0.4% C-41P. O-Tex released the plug and approximately 2bbl into displacement the pressure spiked to 625psi. O-Tex stopped pumping and bled off pressure but still continued to pressure up. AEU plans to drill out the plug and cement, run a Cement Bond Log to find the top of cement, and then decide how to bring cement to surface from there. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1428589695 | ||
+ | | 2015-04-09 | ||
+ | | | ||
+ | | On the day of my inspection production equipment has been installed and awaiting on frac. The site passed preliminary restoration according to ORC 1509.072A. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
|- | |- | ||
| -1866798004 | | -1866798004 | ||
| 2014-06-25 | | 2014-06-25 | ||
− | | | + | | |
− | + | | On the day of my inspection I was on location to set conductor and I witnessed that Precision Rathole Inc. was drilling a 36 inch diameter hole at a depth of 90 feet with a planned td of 100 | |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -382273940 | | -382273940 | ||
| 2014-06-26 | | 2014-06-26 | ||
− | | | + | | |
| On the date of inspection I accompanied ODNR Inspector Doug Bennett to witness a conductor cement string. Refer to Doug Bennett's report for further details. | | On the date of inspection I accompanied ODNR Inspector Doug Bennett to witness a conductor cement string. Refer to Doug Bennett's report for further details. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 750026647 | | 750026647 | ||
| 2014-07-09 | | 2014-07-09 | ||
− | | | + | | |
| On the day of my inspection I witnessed Precision Rathole Inc. was on site drilling mouse holes. I met with Drilling Supervisor Garry Reynolds and verified that top of cement was tagged inside conductor at 77 feet. | | On the day of my inspection I witnessed Precision Rathole Inc. was on site drilling mouse holes. I met with Drilling Supervisor Garry Reynolds and verified that top of cement was tagged inside conductor at 77 feet. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 975637734 | ||
+ | | 2014-11-05 | ||
+ | | | ||
+ | | On the day of my inspection I found that Nomac Drilling rig 80 had new 9.625 casing ran to a depth of 6486'. The casing was equipped with a DV tool at 3516'. They were circulating when I arrived. O-Tex Pumping attempted to cement the casing to surface in one stage. Although good circulation was maintained throughout the job, no cement was circulated to surface. There were approximately 3 barrels of gel spacer circulated to surface when O-Tex reached their maximum displacement volume. Nomac 80 opened the DV tool and circulated for 12 hours. O-Tex cemented the second stage of the job. Good circulation was maintained throughout the job with approximately 80 barrels of cement returns. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-059-24341 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.12758403,"lon":-81.34572085,"icon":""}]} |
County: Guernsey | |
Municipality: | |
Operator Name: AMERICAN ENERGY UTICA LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-06-25 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Drilling | |
Violations: 0 | |
Latitude: 40.12758403 | |
Longitude: -81.34572085 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
12335113 | 2014-11-13 | On the day of my inspection I found that Nomac Drilling rig 80 had reached a total depth of 15985'. They were in the process of running new 5.5 production casing. AEU reported that a spill had just occurred prior to my arrival. They estimated that 20 gallons of oil based mud had been released from a CurryVac truck. The mud was released outside of containment. No fluid made it off of the drilling pad. The spill had been cleaned up by the time I was notified. The contaminated gravel had been scraped up and sent to the landfill. I did not observe any residual contamination at the spill site. | ||||
1403786729 | 2014-06-26 | On the day of my inspection accompanied by ODNR Inspector Brandon Trigg, I witnessed Precision Rathole Inc. drilled a 36 inch diameter hole to the depth of 100 feet and ran 100 feet of 30 inch 118.65#/ft. conductor pipe. O-Tex Pumping LLC was on site and gained circulation with 5bbls of fresh water, 15bbls of gel and 5bbls of fresh water. O-Tex cemented pipe with 370 sacks of class H cement with 2%CaCl, .4% C41P and | ||||
1414428206 | 2014-10-27 | On the date of inspection I was informed by American Energy Utica (AEU) consultant Van Dietrich that the Nomac 80 rig had drilled a 17.5 inch diameter hole to a depth of 970 feet. Wyoming Casing Crew set 13.375 inch 54.50lbs/ft casing on bottom. O-Tex Pumping, LLC pumped 1270sk of Class H cement, 15.6ppg, 1.2 yield, 2% CaCl, 0.25lbs/sk flake, 0.4% C-41P. O-Tex released the plug and approximately 2bbl into displacement the pressure spiked to 625psi. O-Tex stopped pumping and bled off pressure but still continued to pressure up. AEU plans to drill out the plug and cement, run a Cement Bond Log to find the top of cement, and then decide how to bring cement to surface from there. | ||||
1428589695 | 2015-04-09 | On the day of my inspection production equipment has been installed and awaiting on frac. The site passed preliminary restoration according to ORC 1509.072A. | ||||
-1866798004 | 2014-06-25 | On the day of my inspection I was on location to set conductor and I witnessed that Precision Rathole Inc. was drilling a 36 inch diameter hole at a depth of 90 feet with a planned td of 100 | ||||
-382273940 | 2014-06-26 | On the date of inspection I accompanied ODNR Inspector Doug Bennett to witness a conductor cement string. Refer to Doug Bennett's report for further details. | ||||
750026647 | 2014-07-09 | On the day of my inspection I witnessed Precision Rathole Inc. was on site drilling mouse holes. I met with Drilling Supervisor Garry Reynolds and verified that top of cement was tagged inside conductor at 77 feet. | ||||
975637734 | 2014-11-05 | On the day of my inspection I found that Nomac Drilling rig 80 had new 9.625 casing ran to a depth of 6486'. The casing was equipped with a DV tool at 3516'. They were circulating when I arrived. O-Tex Pumping attempted to cement the casing to surface in one stage. Although good circulation was maintained throughout the job, no cement was circulated to surface. There were approximately 3 barrels of gel spacer circulated to surface when O-Tex reached their maximum displacement volume. Nomac 80 opened the DV tool and circulated for 12 hours. O-Tex cemented the second stage of the job. Good circulation was maintained throughout the job with approximately 80 barrels of cement returns. |
For data sources see[1]