X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262506000

Well Details

Well ID: 0524262506000
Loading map...
Location: 00/06-25-052-26W4/0
Location Alias: 00/06-25-52-26 W4M
Location Alias 2: 00/06-25-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 25
County/Municipality: Edmonton
Well Name: CASE ACHESON 6-25-52-26
Operator Name: Obsidian Energy Ltd.
License Number: 0083128
License Date: 1980-05-30
License Status: RecCertified
Spud Date: 1980-06-13
Final Drill Date: 1980-06-19
Well Total Depth: 1298.00 m
Surface Hole Latitude: 53.517941
Surface Hole Longitude: -113.703355

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-30 Obtained License
1980-06-19 Finished Drilling
1980-06-19 Well Mode changed to Drilled and Cased
1980-06-20 Drill Stem Test Performed
1980-06-21 Production Casing Operation Performed
1980-07-10 Perforation Treatment Performed - Jet Perforation
1980-07-11 Well Began Production
1980-07-11 Well Fluid changed to Crude Oil
1980-07-11 Well Mode changed to Flowing
1985-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-31 Perforation Treatment Performed - Fractured
2000-01-19 Well Fluid changed to Crude Oil
2000-01-19 Well Mode changed to Closed
2000-08-05 Well Fluid changed to Crude Oil
2000-08-05 Well Mode changed to Pumping
2001-09-07 Well Fluid changed to Crude Oil
2001-09-07 Well Mode changed to Suspended
2006-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-09-06 Plug Back Performed
2006-09-06 Well Fluid changed to Crude Oil
2006-09-06 Well Log Performed
2006-09-06 Well Mode changed to Abandoned Zone
2006-09-07 Perforation Treatment Performed - Jet Perforation
2006-09-07 Well Log Performed
2006-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-09-08 Perforation Treatment Performed - Remedial Casing
2006-09-11 Perforation Treatment Performed - Jet Perforation
2006-09-11 Perforation Treatment Performed - Remedial Casing
2006-09-11 Well Log Performed
2006-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-16 Well Abandoned
2006-12-16 Well Fluid changed to Crude Oil
2006-12-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-10 Perforation 1241.50 1246.00 13
1985-05-31 Acid Treatment 1241.50 1246.00 0
1985-05-31 Fracture 1241.50 1246.00 0
2006-09-06 Packing Device Capped w/Cement 1223.50 1231.50 0
2006-09-07 Perforation 433.00 434.00 17
2006-09-08 Remedial Casing Cementing 433.00 434.00 0
2006-09-08 Packing Device Capped w/Cement 419.00 427.00 0
2006-09-11 Perforation 340.00 341.00 17
2006-09-11 Remedial Casing Cementing 340.00 341.00 0
2006-09-12 Packing Device Capped w/Cement 327.00 335.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2741 0.0 0.0 0.0
1981 7263 0.0 0.0 0.0
1982 8743 0.0 0.0 0.0
1983 8609 0.0 0.0 0.0
1984 8020 0.0 0.0 0.0
1985 8443 0.0 0.0 0.0
1986 8487 0.0 0.0 0.0
1987 8707 0.0 0.0 0.0
1988 8779 0.0 0.0 0.0
1989 8447 0.0 0.0 0.0
1990 8304 0.0 0.0 0.0
1991 8755 0.0 0.0 0.0
1992 8779 0.0 0.0 0.0
1993 8751 0.0 0.0 0.0
1994 8753 0.0 0.0 0.0
1995 8735 0.0 0.0 0.0
1996 7835 0.0 0.0 0.0
1997 8285 0.0 0.0 0.0
1998 5855 0.0 0.0 0.0
1999 1136 0.0 0.0 0.0
2000 3995 0.0 0.0 0.0
2001 5671 0.0 0.0 0.0

For data sources see[5]

References