If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-22073 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.916772053,"lon":-81.489589106,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1977-11-03 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.916772053 | |
Longitude: -81.489589106 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1069803722 | 2003-11-25 | RIG COULD NOT GET OVER TUBING/ CSG. DOWN HOLE. DISCUSSED PROBLEM WITH JEFF MURRAY,NCE. DECIDED TO MOVE RIG OFF HOLE UNTIL DRIER WEATHER, LOCATION IS TOTALLY UNDER WATER/MUD. OVER DOZER TRACKS.ON HOLE SINCE 11-16-03. NO PROGRESS MADE ON ATTEMPTING TO GET OVERSHOT OVER CASING OR TUBING.PROBABLY WILL HAVE TO MILL PIPE BUT CANNOT CONSTRUCT PIT AT THIS TIME DUE TO HIGH WATER. | ||||
1310339820 | 2005-02-04 | JEFF MURRAY, JOHN ULLOM, NORTHCOAST ENERGY, DISCUSSED WHAT NEEDED TO BE DONE WITH GETTING THIS WELL PLUGGED. CASING STRINGS THRU MINE AND ROTTED OFF. TO MOVE RIG ON STARTING MONDAY. START RIGGING UP, AND STARTING PLUGGING OPERATIONS. | ||||
202921671 | 2005-02-10 | MOVING MORE EQUIPMENT IN TO GET STARTED ON PLUGGING OF WELL. | ||||
261504099 | 2005-02-08 | MET MR. HORTON AT LOCATION. HE WASN'T GOING TO ALLOW RIG TO GO ON TO LOCATION DUE TO MUDDY CONDITIONS.AFTER LENGTHY DISCUSSION HE WAS CONVINCED TO ALLOW THE RIG TO MOVE ON TO LOCATION. | ||||
332350835 | 2003-11-18 | COMPANY RIG ON HOLE. RUN 4" BACK WITH OVERSHOT, TRYING TO GET BACK OVER 4" IN HOLE( PARTED). GOT BACK TO 93' AND HIT SOLID, 8" IS PROBABLY PARTED AT THIS POINT ALSO. ADVISED COMPANY TO MILL ON 4" TO GET EVEN CUT ON PIPE AFTER IMPRESSION BLOCK IS RUN TO SEE WHAT IS LOOKING UP AT US DOWNHOLE. | ||||
581909795 | 2005-12-19 | FINAL RESTORATION |