Well ID: 34-055-21865 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.5811761191,"lon":-81.2648793339,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2005-12-31 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 4 | |
Latitude: 41.5811761191 | |
Longitude: -81.2648793339 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1489457783 | 2007-08-13 | Area around well head needs, lime, fertilized, seeded and mulched. Sedimentation is evident, drainage flows to the south and south east. The drainage channel had sand and clay fines in it. There is an area in the woods 15'X8' that the fines are deposited. Fines all so continue into the woods to the south east. Tank battery dike has two, two inch plastic drain pipes installed. Drain pipes do not have caps. Tank battery dike is not capable of containing spills. Area around well head needs, limed, fertilized, seeded and mulched. Plastic drain pipes installed in the tank battery dike need to be capped at both ends. | NONE(B) | |||
-1961115230 | 2006-01-13 | company setting tank battery checking on sedimentation to east of lease road company working on controling | ||||
-1980398235 | 2006-02-17 | checking location | ||||
-2042489268 | 2008-07-15 | Landowner to east has complainted about nise from pump jack motor and no fence around well | ||||
-2056793546 | 2007-10-17 | Area around the well has been repair seeded and mulched vegetation is beginning to become established. Drain pipes in the tank battery have been capped. | ||||
1142875243 | 2006-02-06 | Inspected site due to landowner stated that a feeder creek or drainage ditch that feeds into his pond was just all clay
sediment.He's worried about the fish that are in the pond ( Coy Crap). Case #06-001 Inspected site due to landowner stated that a feeder creek or drainage ditch that feeds into his pond was just all clay sediment.He's worried about the fish that are in the pond ( Coy Crap). Advised company to put sediment controls in ditch to stop sedi |
9-1-07 | |||
1143483406 | 2006-01-05 | Inspected site found crew from conpany on site cleaning up the mud on rt 6.
Case closed |
NONEA | |||
1188908590 | 2007-09-04 | Tank battery has two drain pipes installed east side of battery and the south. Called company and issued an NOV for the pipes. Neither pipe have caps on them to prevent the escape of brine and oil if a leak occurs. Area around the well head needs repair seeding to prevent erosion. Pit area needs soil treated and seeded to establish vegetation. There is sedimentation behind the well head. That follows a drainage cut to the east. Sedimentation is deposited in the woods away from the site. Called Tim Riley at the time of inspection and informed him of the issues. Will re-check site on Thursday of this week. | ||||
1236877905 | 2009-03-12 | Repair seeding has been completed. Site is stable, pump jack well has been installed. | ||||
1262706045 | 2006-03-21 | On site checking violation, feeder stream running clear Case Closed. Company on site Grading area around well. | ||||
1312176715 | 2011-04-05 | Dike needs built up. ID sings need placed on both well's. Drain cap needs replaced on drain pipe in the dike. | ||||
146668413 | 2013-07-19 | My inspection found the well to be equipped with a pump jack. The well and tank battery are in good repair. The tank battery consists of a 210 BBL production tank and a 100 BBL brine tank. A heat treated separator is outside of the tank battery with the proper spacing. The proper identification is located on the tank battery. The lease road is in stable condition. | ||||
1878457954 | 2006-08-10 | checking location | ||||
273900783 | 2006-02-06 | FOLLOW UP TO NOV # 1142875243 Inspected site due to landowner stated that a feeder creek or drainage ditch that feeds into his pond was just all clay
sediment. He's worried about the fish that are in the pond ( Coy Crap). Case #06-001 Inspected site due to landowner stated that a feeder creek or drainage ditch that feeds into his pond was just all clay sediment. He's worried about the fish that are in the pond ( Coy Crap). Advised company to put sediment controls in ditch to stop sai |
9-1-07 | |||
394087368 | 2006-01-11 | company placed straw bails to control off site sedimentation . |