X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605220502002

Well Details

Well ID: 0605220502002
Loading map...
Location: 00/02-05-060-22W5/2
Location Alias: 00/02-05-60-22 W5M
Location Alias 2: 00/02-05-060-22 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 22
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ RE-EN FIR 2-5-60-22
Operator Name: XTO Energy Canada ULC
License Number: 0426520
License Date: 2010-11-29
License Status: Amended
Spud Date: 2011-01-28
Final Drill Date: 2011-02-26
Well Total Depth: 4890.00 m
Surface Hole Latitude: 54.156844
Surface Hole Longitude: -117.225723

For data sources see[1][2]

Well History

Date Event
2010-11-29 Obtained License
2011-02-01 Direction Drilling Operation Performed - Horizontal
2011-02-01 Production Casing Operation Performed
2011-02-26 Finished Drilling
2011-02-26 Well Log Performed
2011-02-26 Well Mode changed to Drilled and Cased
2011-03-02 Liner Casing Operation Performed
2011-03-03 Rig Released
2011-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-13 Perforation Treatment Performed - Open-Hole Completion
2011-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-15 Well Fluid changed to Gas
2011-03-15 Well Mode changed to Testing
2011-04-23 Well Began Production
2011-04-23 Well Fluid changed to Gas
2011-04-23 Well Mode changed to Flowing
2013-02-05 Well Fluid changed to Gas
2013-02-05 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-01 2256.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-13 Open Hole/Barefoot Completion 4885.00 4890.00 0
2011-03-13 Multi-Stage Fracture 4873.60 4876.50 0
2011-03-13 Multi-Stage Fracture 4809.80 4811.40 0
2011-03-13 Multi-Stage Fracture 4711.60 4713.20 0
2011-03-14 Multi-Stage Fracture 4601.00 4602.60 0
2011-03-14 Multi-Stage Fracture 4501.80 4503.40 0
2011-03-14 Multi-Stage Fracture 4391.00 4392.60 0
2011-03-14 Multi-Stage Fracture 4291.10 4292.70 0
2011-03-14 Multi-Stage Fracture 4181.20 4182.80 0
2011-03-14 Multi-Stage Fracture 4070.60 4072.20 0
2011-03-14 Multi-Stage Fracture 3982.50 3984.10 0
2011-03-14 Multi-Stage Fracture 3861.00 3862.60 0
2011-03-15 Multi-Stage Fracture 3762.40 3764.00 0
2011-03-15 Multi-Stage Fracture 3651.30 3652.90 0
2011-03-15 Multi-Stage Fracture 3551.70 3553.30 0
2011-03-15 Multi-Stage Fracture 3451.80 3453.40 0
2011-03-15 Multi-Stage Fracture 3340.20 3341.80 0
2011-03-15 Multi-Stage Fracture 3229.50 3231.10 0
2011-03-15 Multi-Stage Fracture 3129.80 3131.40 0
2011-03-15 Multi-Stage Fracture 3030.50 3032.10 0
2011-03-15 Multi-Stage Fracture 2953.20 2954.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4277 0.0 0.0 0.0
2012 7975 0.0 0.0 0.0
2013 6956 0.0 0.0 0.0
2014 6421 0.0 0.0 0.0
2015 7208 0.0 0.0 0.0
2016 7646 0.0 0.0 0.0
2017 6790 0.0 0.0 0.0
2018 7812 0.0 0.0 0.0
2019 8095 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[6]

References