X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-035-22113"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-035-22113
 
| Well ID: 34-035-22113
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.546909627, -81.4527433641 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.54689894, -81.45290059 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Cuyahoga County, Ohio|Cuyahoga]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[BASS ENERGY CO INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2009-09-05
 
| Spud Date: 2009-09-05
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.546909627
+
| Latitude: 41.54689894
 
|-
 
|-
| Longitude: -81.4527433641
+
| Longitude: -81.45290059
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 30365.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 42117.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 29861.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 20729.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 16905.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 103:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1041071544
 
| -1041071544
 
| 2009-10-29
 
| 2009-10-29
|
+
|  
 
| Contractor working on asphalt parking lot.
 
| Contractor working on asphalt parking lot.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1080364776
 
| -1080364776
 
| 2013-01-14
 
| 2013-01-14
|
+
|  
 
| The producing unit is comprised of a two-tank battery (1 210-barrel production and 1 100-barrel brine) and a wellhead with mechanical plunger lift, and mechanical separator, each in separate chain-link enclosures. The well is currently in production.  The tank and well spacing is in accordance with 1509:9-9-05 . HB 278 safety equipment is present. Unit identification is present and legible at the tank battery. The tank battery secondary containment is adequate.  I did not observe any leaks, spills, or other signs of contamination. The gates are locked.
 
| The producing unit is comprised of a two-tank battery (1 210-barrel production and 1 100-barrel brine) and a wellhead with mechanical plunger lift, and mechanical separator, each in separate chain-link enclosures. The well is currently in production.  The tank and well spacing is in accordance with 1509:9-9-05 . HB 278 safety equipment is present. Unit identification is present and legible at the tank battery. The tank battery secondary containment is adequate.  I did not observe any leaks, spills, or other signs of contamination. The gates are locked.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1154297239
 +
| 2009-09-04
 +
|
 +
| On site did a change in rig orientation to east to west and pits to the north.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1223775498
 
| -1223775498
 
| 2009-10-20
 
| 2009-10-20
|
+
|  
 
| Fracturing crew on site no issues during the frac.
 
| Fracturing crew on site no issues during the frac.
 
Rick Simmers wants MSDA Sheets and also how much water and the volume of the additives used.
 
Rick Simmers wants MSDA Sheets and also how much water and the volume of the additives used.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1261231770
 +
| 2009-12-04
 +
|
 +
| crew on site boring under alpha drive city of highland Hts on site along with EOG.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -130104263
 
| -130104263
 
| 2009-09-09
 
| 2009-09-09
|
+
|  
 
| no violation, drilling cement inside  casing at 350'.
 
| no violation, drilling cement inside  casing at 350'.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1326480179
 +
| 2012-01-11
 +
|
 +
| On 01/11/2012, DNR Inspector Richard Skidmore completed an urban preliminary restoration well inspection for DNR Inspector Ray Wallace.  The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05.  Inspection passed.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1403888247
 
| -1403888247
 
| 2009-09-01
 
| 2009-09-01
|
+
|  
 
| on site company working on location for rig.
 
| on site company working on location for rig.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1421183368
 +
| 2009-10-19
 +
|
 +
| Rick Simmers received a phone call from ODNR  director Mr. Logan in reference to explosives being hauled in the city limits.
 +
Inspected site in Highland Hts . Well being perforated on Alpha Drive. Jim Austin building dept. and Tom Hartman Fire Chief  both saw the sign on Perforation Truck. Perforation crew gave the Fire Chief Hartman MSDA sheets and answered his question. Rick Simmers advised Director Logan that the perforation trucks are license under ODOT. The Fracturing will be done 10-20-09 before rush hr starting at 7 AM.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1560759082
 +
| 2015-02-24
 +
|
 +
| I inspected this well as part of routine inspection activity . Connections and fittings at the wellhead and battery are secure. Enclosure gates are locked. Signage is present and accurate. Load-outs are plugged and secure. Production reports are current. At the time of this inspection there is 12 to 15 inches of snow cover, which obscures some of the surficial features. The areas surrounding the wellhead and battery are comprised of a grassy tree lawn adjacent to the parking area. The tree lawn is snow-covered.  I did not observe any signs of impacts relating to the well on the surrounding areas.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1562925639
 
| -1562925639
 
| 2009-10-26
 
| 2009-10-26
|
+
|  
 
| asphalt still torn up well fenced and area still fenced with chain link .
 
| asphalt still torn up well fenced and area still fenced with chain link .
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1653003409
 
| -1653003409
 
| 2009-10-21
 
| 2009-10-21
|
+
|  
 
| checking site swabbing rig on well.
 
| checking site swabbing rig on well.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -1920329157
 
| 2009-09-17
 
|
 
| on site for cementing the 4.5" casing in.
 
|
 
|
 
|
 
|-
 
|-
 
| -767187006
 
| 2009-10-19
 
|
 
| on site to check progress of the perforation of well. Crew done perforating no issues or violation. Crew to arrive early to get fracturing done before workers arrive for work.
 
|
 
|
 
|
 
|-
 
|-
 
| -811240886
 
| 2009-10-16
 
|
 
| checked area pits closed. company letting ground settle before laying asphalt.
 
|
 
|
 
|
 
|-
 
|-
 
| -930451393
 
| 2009-09-15
 
|
 
| drilling at 3000' No Violation.
 
|
 
|
 
|
 
|-
 
|-
 
| 1154297239
 
| 2009-09-04
 
|
 
| On site did a change in rig orientation to east to west and pits to the north.
 
|
 
|
 
|
 
|-
 
|-
 
| 1261231770
 
| 2009-12-04
 
|
 
| crew on site boring under alpha drive city of highland Hts on site along with EOG.
 
|
 
|
 
|
 
|-
 
|-
 
| 1326480179
 
| 2012-01-11
 
|
 
| On 01/11/2012, DNR Inspector Richard Skidmore completed an urban preliminary restoration well inspection for DNR Inspector Ray Wallace.  The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05.  Inspection passed.
 
|
 
|
 
|
 
|-
 
|-
 
| 1421183368
 
| 2009-10-19
 
|
 
| Rick Simmers received a phone call from ODNR  director Mr. Logan in reference to explosives being hauled in the city limits.
 
Inspected site in Highland Hts . Well being perforated on Alpha Drive. Jim Austin building dept. and Tom Hartman Fire Chief  both saw the sign on Perforation Truck. Perforation crew gave the Fire Chief Hartman MSDA sheets and answered his question. Rick Simmers advised Director Logan that the perforation trucks are license under ODOT. The Fracturing will be done 10-20-09 before rush hr starting at 7 AM.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1853183142
 
| 1853183142
 
| 2013-09-25
 
| 2013-09-25
|
+
|  
 
| The producing unit is comprised of a wellhead with mechanical plunger lift system and an above-ground storage tank (AST) battery. The wellhead and battery are in separate, board-on-board enclsoures. The well is producing and no problems or violations noted. Preliminary restoration passes.
 
| The producing unit is comprised of a wellhead with mechanical plunger lift system and an above-ground storage tank (AST) battery. The wellhead and battery are in separate, board-on-board enclsoures. The well is producing and no problems or violations noted. Preliminary restoration passes.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1920329157
 +
| 2009-09-17
 +
|
 +
| on site for cementing the 4.5 casing in.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1959838854
 
| 1959838854
 
| 2009-09-28
 
| 2009-09-28
|
+
|  
 
| chain link fence still up around site .Pits had been solidified on the 27th of Sept 2009 company man advised me they will be covered over when solidification is hard because it is in the asphalt parking area
 
| chain link fence still up around site .Pits had been solidified on the 27th of Sept 2009 company man advised me they will be covered over when solidification is hard because it is in the asphalt parking area
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 2025017081
 
| 2025017081
 
| 2010-01-13
 
| 2010-01-13
|
+
|  
 
| no violation unable to check restoation because of snow cover!
 
| no violation unable to check restoation because of snow cover!
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 2141169373
 
| 2141169373
 
| 2009-09-23
 
| 2009-09-23
|
+
|  
 
| Pits still open and fenced in .
 
| Pits still open and fenced in .
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 249116297
 
| 249116297
 
| 2009-12-04
 
| 2009-12-04
|
+
|  
 
| company boring under alpha drive for flow line to domino gas line.then continued to bore from alpha drive east to tank batery.
 
| company boring under alpha drive for flow line to domino gas line.then continued to bore from alpha drive east to tank batery.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 492190694
 
| 492190694
 
| 2009-10-20
 
| 2009-10-20
|
+
|  
 
| Crew on site flowing well into frac tanks.
 
| Crew on site flowing well into frac tanks.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 662069362
 
| 662069362
 
| 2009-09-10
 
| 2009-09-10
|
+
|  
 
| drilling at 1200' tripping out drill stems to run motor in.
 
| drilling at 1200' tripping out drill stems to run motor in.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -767187006
 +
| 2009-10-19
 +
|
 +
| on site to check progress of the perforation of well. Crew done perforating no issues or violation. Crew to arrive early to get fracturing done before workers arrive for work.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -811240886
 +
| 2009-10-16
 +
|
 +
| checked area pits closed. company letting ground settle before laying asphalt.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 829868315
 
| 829868315
 
| 2009-10-20
 
| 2009-10-20
|
+
|  
 
| on site during fracturing no violation found.
 
| on site during fracturing no violation found.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 921119440
 
| 921119440
 
| 2009-11-30
 
| 2009-11-30
|
+
|  
 
| Working on well site and tank battery in back of property.
 
| Working on well site and tank battery in back of property.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -930451393
 +
| 2009-09-15
 +
|
 +
| drilling at 3000' No Violation.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 16:00, 16 July 2015

Well Details

Well ID: 34-035-22113
Loading map...
County: Cuyahoga
Municipality:
Operator Name: BASS ENERGY CO INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2009-09-05
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.54689894
Longitude: -81.45290059

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 30365.0 0.0
2011-0 42117.0 0.0
2012-0 29861.0 0.0
2013-0 20729.0 0.0
2014-0 16905.0 365.0 0.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1041071544 2009-10-29 Contractor working on asphalt parking lot.
-1080364776 2013-01-14 The producing unit is comprised of a two-tank battery (1 210-barrel production and 1 100-barrel brine) and a wellhead with mechanical plunger lift, and mechanical separator, each in separate chain-link enclosures. The well is currently in production. The tank and well spacing is in accordance with 1509:9-9-05 . HB 278 safety equipment is present. Unit identification is present and legible at the tank battery. The tank battery secondary containment is adequate. I did not observe any leaks, spills, or other signs of contamination. The gates are locked.
1154297239 2009-09-04 On site did a change in rig orientation to east to west and pits to the north.
-1223775498 2009-10-20 Fracturing crew on site no issues during the frac.

Rick Simmers wants MSDA Sheets and also how much water and the volume of the additives used.

1261231770 2009-12-04 crew on site boring under alpha drive city of highland Hts on site along with EOG.
-130104263 2009-09-09 no violation, drilling cement inside casing at 350'.
1326480179 2012-01-11 On 01/11/2012, DNR Inspector Richard Skidmore completed an urban preliminary restoration well inspection for DNR Inspector Ray Wallace. The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05. Inspection passed.
-1403888247 2009-09-01 on site company working on location for rig.
1421183368 2009-10-19 Rick Simmers received a phone call from ODNR director Mr. Logan in reference to explosives being hauled in the city limits.

Inspected site in Highland Hts . Well being perforated on Alpha Drive. Jim Austin building dept. and Tom Hartman Fire Chief both saw the sign on Perforation Truck. Perforation crew gave the Fire Chief Hartman MSDA sheets and answered his question. Rick Simmers advised Director Logan that the perforation trucks are license under ODOT. The Fracturing will be done 10-20-09 before rush hr starting at 7 AM.

1560759082 2015-02-24 I inspected this well as part of routine inspection activity . Connections and fittings at the wellhead and battery are secure. Enclosure gates are locked. Signage is present and accurate. Load-outs are plugged and secure. Production reports are current. At the time of this inspection there is 12 to 15 inches of snow cover, which obscures some of the surficial features. The areas surrounding the wellhead and battery are comprised of a grassy tree lawn adjacent to the parking area. The tree lawn is snow-covered. I did not observe any signs of impacts relating to the well on the surrounding areas.
-1562925639 2009-10-26 asphalt still torn up well fenced and area still fenced with chain link .
-1653003409 2009-10-21 checking site swabbing rig on well.
1853183142 2013-09-25 The producing unit is comprised of a wellhead with mechanical plunger lift system and an above-ground storage tank (AST) battery. The wellhead and battery are in separate, board-on-board enclsoures. The well is producing and no problems or violations noted. Preliminary restoration passes.
-1920329157 2009-09-17 on site for cementing the 4.5 casing in.
1959838854 2009-09-28 chain link fence still up around site .Pits had been solidified on the 27th of Sept 2009 company man advised me they will be covered over when solidification is hard because it is in the asphalt parking area
2025017081 2010-01-13 no violation unable to check restoation because of snow cover!
2141169373 2009-09-23 Pits still open and fenced in .
249116297 2009-12-04 company boring under alpha drive for flow line to domino gas line.then continued to bore from alpha drive east to tank batery.
492190694 2009-10-20 Crew on site flowing well into frac tanks.
662069362 2009-09-10 drilling at 1200' tripping out drill stems to run motor in.
-767187006 2009-10-19 on site to check progress of the perforation of well. Crew done perforating no issues or violation. Crew to arrive early to get fracturing done before workers arrive for work.
-811240886 2009-10-16 checked area pits closed. company letting ground settle before laying asphalt.
829868315 2009-10-20 on site during fracturing no violation found.
921119440 2009-11-30 Working on well site and tank battery in back of property.
-930451393 2009-09-15 drilling at 3000' No Violation.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.