Well ID: 34-019-22579 |
County: |
Municipality: |
Operator Name: |
Well Pad ID: |
Farm/Lease Name: |
First Permit Date: |
Last Permit Date: |
Spud Date: |
Unconventional: |
Horizontal: |
Producing: |
Violations: |
Latitude: |
Longitude: |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1234398146 | 2014-06-23 | I was on location for the cementing of the intermediate casing. Nomac Rig 74 drilled a 12.25" Hole #3 to 2,525' from rig floor (KB) and set 9.625" casing to 2,510' KB with 15 centralizers. The rig floor height was 20'. The casing had a weight of 40 lbs/ft and rating of J-55. A float shoe and collar was installed on the casing. The float collar was between the second and third joints. Schlumberger rigged up and established circulation with 5 bbls of fresh water. The operator mixed and pumped 25 bbls of a gel spacer, 10 bbls of a water spacer and 197 bbls (900 sacks) of Class A cement with a yield of 1.23 and 15.6 PPG. Next, Schlumberger released the plug and displaced the cement to 2,421' with 183.5 bbls of fresh water. I witnessed 35 bbls of good cement returned to surface. Once the plug landed, O-Tex pressured up from 1,068 psi to 1,579 psi and held static for 5 minutes. Pressure on the plug was release and there was 1 bbl of flow back water. | ||||
1403634576 | 2014-06-21 | I was on location for the cementing of the surface casing. Nomac Rig 74 drilled a 17.5" Hole #2 to 572' from rig floor (KB) and set 13.375" casing to 557' KB with 5 centralizers. The casing had a weight of 54.5 lbs/ft and rating of J-55. A float shoe and collar was installed onto the casing string. Schlumberger rigged up and established circulation with 5 bbls of fresh water. The operator mixed and pumped 30 bbls of a gel spacer, 10 bbls of a fresh water spacer and 109 bbls (500 sacks) of Class A cement with a yield of 1.22 and 15.6 PPG. Next, Schlumberger released the plug and displaced the cement to 514' with 79.5 bbls of fresh water. I witnessed 25 bbls of good cement returned to surface. Once the plug landed, O-Tex pressured up from 300 to 1300 psi and held static for 5 minutes. Pressure on the plug was release and there was 0.5 bbl of flow back water. Cement samples was taken and weighed at 15.6. | ||||
1897889412 | 2014-04-27 |