If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-019-22579 | | Well ID: 34-019-22579 | ||
+ | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.49517123, -81.13981617 | width=100% | height=100% }} | ||
|- | |- | ||
− | | County: | + | | County: [[Carroll County, Ohio|Carroll]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[CHESAPEAKE EXPLORATION LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: 2014-04-27 |
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
− | | Violations: | + | | Violations: 0 |
|- | |- | ||
− | | Latitude: | + | | Latitude: 40.49517123 |
|- | |- | ||
− | | Longitude: | + | | Longitude: -81.13981617 |
|- | |- | ||
|} | |} | ||
Line 42: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2015-1 | ||
+ | | style="text-align:right;" | 117344.0 | ||
+ | | style="text-align:right;" | 63.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 22492.0 | ||
+ | | style="text-align:right;" | 63.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 63: | Line 67: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1234398146 | | -1234398146 | ||
| 2014-06-23 | | 2014-06-23 | ||
− | | | + | | |
− | | I was on location for the cementing of the intermediate casing. Nomac Rig 74 drilled a 12.25 | + | | I was on location for the cementing of the intermediate casing. Nomac Rig 74 drilled a 12.25 Hole #3 to 2,525' from rig floor (KB) and set 9.625 casing to 2,510' KB with 15 centralizers. The rig floor height was 20'. The casing had a weight of 40 lbs/ft and rating of J-55. A float shoe and collar was installed on the casing. The float collar was between the second and third joints. Schlumberger rigged up and established circulation with 5 bbls of fresh water. The operator mixed and pumped 25 bbls of a gel spacer, 10 bbls of a water spacer and 197 bbls (900 sacks) of Class A cement with a yield of 1.23 and 15.6 PPG. Next, Schlumberger released the plug and displaced the cement to 2,421' with 183.5 bbls of fresh water. I witnessed 35 bbls of good cement returned to surface. Once the plug landed, O-Tex pressured up from 1,068 psi to 1,579 psi and held static for 5 minutes. Pressure on the plug was release and there was 1 bbl of flow back water. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1403634576 | | 1403634576 | ||
| 2014-06-21 | | 2014-06-21 | ||
− | | | + | | |
− | | I was on location for the cementing of the surface casing. Nomac Rig 74 drilled a 17.5 | + | | I was on location for the cementing of the surface casing. Nomac Rig 74 drilled a 17.5 Hole #2 to 572' from rig floor (KB) and set 13.375 casing to 557' KB with 5 centralizers. The casing had a weight of 54.5 lbs/ft and rating of J-55. A float shoe and collar was installed onto the casing string. Schlumberger rigged up and established circulation with 5 bbls of fresh water. The operator mixed and pumped 30 bbls of a gel spacer, 10 bbls of a fresh water spacer and 109 bbls (500 sacks) of Class A cement with a yield of 1.22 and 15.6 PPG. Next, Schlumberger released the plug and displaced the cement to 514' with 79.5 bbls of fresh water. I witnessed 25 bbls of good cement returned to surface. Once the plug landed, O-Tex pressured up from 300 to 1300 psi and held static for 5 minutes. Pressure on the plug was release and there was 0.5 bbl of flow back water. Cement samples was taken and weighed at 15.6. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1897889412 | | 1897889412 | ||
| 2014-04-27 | | 2014-04-27 | ||
− | | | + | | |
− | + | | I witnessed the cementing of the conductor casing. Precision Rathole drilled a 26 diameter hole to 115 | |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-019-22579 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.49517123,"lon":-81.13981617,"icon":""}]} |
County: Carroll | |
Municipality: | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-04-27 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.49517123 | |
Longitude: -81.13981617 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2015-1 | 117344.0 | 63.0 | 22492.0 | 63.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1234398146 | 2014-06-23 | I was on location for the cementing of the intermediate casing. Nomac Rig 74 drilled a 12.25 Hole #3 to 2,525' from rig floor (KB) and set 9.625 casing to 2,510' KB with 15 centralizers. The rig floor height was 20'. The casing had a weight of 40 lbs/ft and rating of J-55. A float shoe and collar was installed on the casing. The float collar was between the second and third joints. Schlumberger rigged up and established circulation with 5 bbls of fresh water. The operator mixed and pumped 25 bbls of a gel spacer, 10 bbls of a water spacer and 197 bbls (900 sacks) of Class A cement with a yield of 1.23 and 15.6 PPG. Next, Schlumberger released the plug and displaced the cement to 2,421' with 183.5 bbls of fresh water. I witnessed 35 bbls of good cement returned to surface. Once the plug landed, O-Tex pressured up from 1,068 psi to 1,579 psi and held static for 5 minutes. Pressure on the plug was release and there was 1 bbl of flow back water. | ||||
1403634576 | 2014-06-21 | I was on location for the cementing of the surface casing. Nomac Rig 74 drilled a 17.5 Hole #2 to 572' from rig floor (KB) and set 13.375 casing to 557' KB with 5 centralizers. The casing had a weight of 54.5 lbs/ft and rating of J-55. A float shoe and collar was installed onto the casing string. Schlumberger rigged up and established circulation with 5 bbls of fresh water. The operator mixed and pumped 30 bbls of a gel spacer, 10 bbls of a fresh water spacer and 109 bbls (500 sacks) of Class A cement with a yield of 1.22 and 15.6 PPG. Next, Schlumberger released the plug and displaced the cement to 514' with 79.5 bbls of fresh water. I witnessed 25 bbls of good cement returned to surface. Once the plug landed, O-Tex pressured up from 300 to 1300 psi and held static for 5 minutes. Pressure on the plug was release and there was 0.5 bbl of flow back water. Cement samples was taken and weighed at 15.6. | ||||
1897889412 | 2014-04-27 | I witnessed the cementing of the conductor casing. Precision Rathole drilled a 26 diameter hole to 115 |
For data sources see[2]