X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-019-22549"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-019-22549
 
| Well ID: 34-019-22549
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.4495629543, -80.9610879213 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.44956295, -80.96108792 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Carroll County, Ohio|Carroll]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-12-04
 
| Spud Date: 2013-12-04
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.4495629543
+
| Latitude: 40.44956295
 
|-
 
|-
| Longitude: -80.9610879213
+
| Longitude: -80.96108792
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 160856.0
 +
| style="text-align:right;" | 33.0
 +
|
 +
|
 +
| style="text-align:right;" | 90.0
 +
| style="text-align:right;" | 33.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 411367.0
 +
| style="text-align:right;" | 91.0
 +
|
 +
|
 +
| style="text-align:right;" | 105.0
 +
| style="text-align:right;" | 91.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 302878.0
 +
| style="text-align:right;" | 90.0
 +
|
 +
|
 +
| style="text-align:right;" | 79.0
 +
| style="text-align:right;" | 90.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 85:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| 1386341224
 
| 1386341224
 
| 2013-12-05
 
| 2013-12-05
|
+
|  
| I witnessed the cementing of the conductor casing.  Express Energy Services drilled a 26" diameter hole to 120'.  Express installed 120' of 20" OD casing. Allied Oil & Gas Field Services was the cementing contractor.  The cement was mudscaled at 15.6 pounds per gallon (ppg).  Allied adjusted the density of the cement and pumped 52.5 bbls of cement slurry at 15.6 ppg.  The cement was displaced with 39 bbls of water.  Cement returns were 8 BBLs. No violations were found.
+
| I witnessed the cementing of the conductor casing.  Express Energy Services drilled a 26 diameter hole to 120'.  Express installed 120' of 20 OD casing. Allied Oil & Gas Field Services was the cementing contractor.  The cement was mudscaled at 15.6 pounds per gallon (ppg).  Allied adjusted the density of the cement and pumped 52.5 bbls of cement slurry at 15.6 ppg.  The cement was displaced with 39 bbls of water.  Cement returns were 8 BBLs. No violations were found.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 03:26, 15 July 2015

Well Details

Well ID: 34-019-22549
Loading map...
County: Carroll
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-12-04
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.44956295
Longitude: -80.96108792

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-3 160856.0 33.0 90.0 33.0
2014-4 411367.0 91.0 105.0 91.0
2015-1 302878.0 90.0 79.0 90.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1386341224 2013-12-05 I witnessed the cementing of the conductor casing. Express Energy Services drilled a 26 diameter hole to 120'. Express installed 120' of 20 OD casing. Allied Oil & Gas Field Services was the cementing contractor. The cement was mudscaled at 15.6 pounds per gallon (ppg). Allied adjusted the density of the cement and pumped 52.5 bbls of cement slurry at 15.6 ppg. The cement was displaced with 39 bbls of water. Cement returns were 8 BBLs. No violations were found.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.