| Well ID: 34-019-22533
 
| Well ID: 34-019-22533
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.5377300319, -81.055877875 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.53773003, -81.05587787 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Carroll County, Ohio|Carroll]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-12-22
 
| Spud Date: 2013-12-22
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.5377300319
+
| Latitude: 40.53773003
 
|-
 
|-
| Longitude: -81.055877875
+
| Longitude: -81.05587787
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 162679.0
 +
| style="text-align:right;" | 81.0
 +
|
 +
|
 +
| style="text-align:right;" | 19334.0
 +
| style="text-align:right;" | 81.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 184619.0
 +
| style="text-align:right;" | 85.0
 +
|
 +
|
 +
| style="text-align:right;" | 18679.0
 +
| style="text-align:right;" | 85.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 76:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1393309804
 +
| 2014-02-11
 +
|
 +
| I was on site to witness the cementing of the 13 3/8 inch surface casing. My inspection revealed that Nomac Rig # 73 has drilled a 17 1/2 inch to a 535 feet and ran 530 feet of 13 3/8 inch casing (54.5 pounds per foot / inside diameter of 12.615 inches). 5 bowspring centralizers were ran on the casing string on joints 1,3,6,9, and 12. O-TEX cemented the 13 3/8 inch casing with 500 sacks of Class H with 2% CaCl, 0.4% C-41P, and 1/4 pound per sack celloflake. The cement had a density of 15.6 pounds per gallon, a yield of 1.2 cubic feet per sack, and they used 5.25 gallons of mix water per sack. O-TEX pumped 107 barrels of cement slurry, 75 barrels of displacement, and there was 21 barrels of cement returns to surface. They bumped the plug at 09:30 pm with 250 PSI and then bumped the pressure up to 750 PSI for the casing test. The casing test was approved, floats held, and there was approximately 1/2 barrel flowback when the pressure was released. My inspection revealed no violations at this time.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1643607222
 
| -1643607222
 
| 2013-12-24
 
| 2013-12-24
|
+
|  
| I was on site to witness the cementing of the 20 inch conductor casing. My inspection revealed that Express has drilled a 26 inch hole to a total depth of 120 feet and ran 120 feet of 20 inch conductor casing (94 pounds per foot / inside diameter 19.124 inches). Allied cemented the casing with 250 sacks of Class "A" with 2% CaCl and 1/2 pound per sack flake. The cement had a density of 15.6 pounds per gallon, a yield of 1.18 cubic feet per sack, and they used 5.23 gallons of mix water per sack. Allied pumped 52.5 barrels of cement, pumped 39 barrels of displacement, and there was 8 barrels of cement returns to surface. My inspection revealed no violations at this time.
+
| I was on site to witness the cementing of the 20 inch conductor casing. My inspection revealed that Express has drilled a 26 inch hole to a total depth of 120 feet and ran 120 feet of 20 inch conductor casing (94 pounds per foot / inside diameter 19.124 inches). Allied cemented the casing with 250 sacks of Class A with 2% CaCl and 1/2 pound per sack flake. The cement had a density of 15.6 pounds per gallon, a yield of 1.18 cubic feet per sack, and they used 5.23 gallons of mix water per sack. Allied pumped 52.5 barrels of cement, pumped 39 barrels of displacement, and there was 8 barrels of cement returns to surface. My inspection revealed no violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1831406851
 
| -1831406851
 
| 2014-02-14
 
| 2014-02-14
|
+
|  
| I was on site to witness the cementing of the 9 5/8 inch intermediate casing. My inspection revealed that Nomac Rig # 73 has drilled a 17 1/2 hole to a total depth of 1930 feet and ran 1918 feet of 9 5/8 inch intermediate casing (40 pounds per foot / inside diameter 8.835 inches). They installed  15 bowspring centralizers on the casing string on joints 1,4,7,10,13,16,18,21,24,27,30,33,36,38, and 41. O-TEX cemented the casing with 710 sacks of Class "H" 3% Gypsum, 2% CaCl, 0.8% MC500, 0.5% C-45, and 0.4% C-41P. The cement had a density of 15.8 pounds per gallon, a yield of 1.21 cubic feet per sack, and they used 5.14 gallons of mix water per sack. O-TEX pumped 153 barrels of cement slurry, 139 barrels of displacement, and there was 27 barrels of cement returns to surface. They bumped the plug at 12:51am with 680 PSI and then conducted the casing test with 1500 PSI. Casing test approved, floats held and the was 1 barrel of water flowed back when the pressure was released. My inspection revealed no violations at this time.
+
| I was on site to witness the cementing of the 9 5/8 inch intermediate casing. My inspection revealed that Nomac Rig # 73 has drilled a 17 1/2 hole to a total depth of 1930 feet and ran 1918 feet of 9 5/8 inch intermediate casing (40 pounds per foot / inside diameter 8.835 inches). They installed  15 bowspring centralizers on the casing string on joints 1,4,7,10,13,16,18,21,24,27,30,33,36,38, and 41. O-TEX cemented the casing with 710 sacks of Class H 3% Gypsum, 2% CaCl, 0.8% MC500, 0.5% C-45, and 0.4% C-41P. The cement had a density of 15.8 pounds per gallon, a yield of 1.21 cubic feet per sack, and they used 5.14 gallons of mix water per sack. O-TEX pumped 153 barrels of cement slurry, 139 barrels of displacement, and there was 27 barrels of cement returns to surface. They bumped the plug at 12:51am with 680 PSI and then conducted the casing test with 1500 PSI. Casing test approved, floats held and the was 1 barrel of water flowed back when the pressure was released. My inspection revealed no violations at this time.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1393309804
 
| 2014-02-11
 
|
 
| I was on site to witness the cementing of the 13 3/8 inch surface casing. My inspection revealed that Nomac Rig # 73 has drilled a 17 1/2 inch to a 535 feet and ran 530 feet of 13 3/8 inch casing (54.5 pounds per foot / inside diameter of 12.615 inches). 5 bowspring centralizers were ran on the casing string on joints 1,3,6,9, and 12. O-TEX cemented the 13 3/8 inch casing with 500 sacks of Class "H" with 2% CaCl, 0.4% C-41P, and 1/4 pound per sack celloflake. The cement had a density of 15.6 pounds per gallon, a yield of 1.2 cubic feet per sack, and they used 5.25 gallons of mix water per sack. O-TEX pumped 107 barrels of cement slurry, 75 barrels of displacement, and there was 21 barrels of cement returns to surface. They bumped the plug at 09:30 pm with 250 PSI and then bumped the pressure up to 750 PSI for the casing test. The casing test was approved, floats held, and there was approximately 1/2 barrel flowback when the pressure was released. My inspection revealed no violations at this time.
 
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 16:11, 16 July 2015

Well Details

Well ID: 34-019-22533
Loading map...
County: Carroll
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-12-22
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.53773003
Longitude: -81.05587787

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-4 162679.0 81.0 19334.0 81.0
2015-1 184619.0 85.0 18679.0 85.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1393309804 2014-02-11 I was on site to witness the cementing of the 13 3/8 inch surface casing. My inspection revealed that Nomac Rig # 73 has drilled a 17 1/2 inch to a 535 feet and ran 530 feet of 13 3/8 inch casing (54.5 pounds per foot / inside diameter of 12.615 inches). 5 bowspring centralizers were ran on the casing string on joints 1,3,6,9, and 12. O-TEX cemented the 13 3/8 inch casing with 500 sacks of Class H with 2% CaCl, 0.4% C-41P, and 1/4 pound per sack celloflake. The cement had a density of 15.6 pounds per gallon, a yield of 1.2 cubic feet per sack, and they used 5.25 gallons of mix water per sack. O-TEX pumped 107 barrels of cement slurry, 75 barrels of displacement, and there was 21 barrels of cement returns to surface. They bumped the plug at 09:30 pm with 250 PSI and then bumped the pressure up to 750 PSI for the casing test. The casing test was approved, floats held, and there was approximately 1/2 barrel flowback when the pressure was released. My inspection revealed no violations at this time.
-1643607222 2013-12-24 I was on site to witness the cementing of the 20 inch conductor casing. My inspection revealed that Express has drilled a 26 inch hole to a total depth of 120 feet and ran 120 feet of 20 inch conductor casing (94 pounds per foot / inside diameter 19.124 inches). Allied cemented the casing with 250 sacks of Class A with 2% CaCl and 1/2 pound per sack flake. The cement had a density of 15.6 pounds per gallon, a yield of 1.18 cubic feet per sack, and they used 5.23 gallons of mix water per sack. Allied pumped 52.5 barrels of cement, pumped 39 barrels of displacement, and there was 8 barrels of cement returns to surface. My inspection revealed no violations at this time.
-1831406851 2014-02-14 I was on site to witness the cementing of the 9 5/8 inch intermediate casing. My inspection revealed that Nomac Rig # 73 has drilled a 17 1/2 hole to a total depth of 1930 feet and ran 1918 feet of 9 5/8 inch intermediate casing (40 pounds per foot / inside diameter 8.835 inches). They installed 15 bowspring centralizers on the casing string on joints 1,4,7,10,13,16,18,21,24,27,30,33,36,38, and 41. O-TEX cemented the casing with 710 sacks of Class H 3% Gypsum, 2% CaCl, 0.8% MC500, 0.5% C-45, and 0.4% C-41P. The cement had a density of 15.8 pounds per gallon, a yield of 1.21 cubic feet per sack, and they used 5.14 gallons of mix water per sack. O-TEX pumped 153 barrels of cement slurry, 139 barrels of displacement, and there was 27 barrels of cement returns to surface. They bumped the plug at 12:51am with 680 PSI and then conducted the casing test with 1500 PSI. Casing test approved, floats held and the was 1 barrel of water flowed back when the pressure was released. My inspection revealed no violations at this time.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.