If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22059 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.5331573258,"lon":-81.0264830452,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2010-08-09 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.5331573258 | |
Longitude: -81.0264830452 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1696676383 | 2010-09-08 | Inspection revealed that Union Drilling is at 8508'. No violations at this time. | ||||
-1869793055 | 2010-10-04 | On site with Dep Chief Tom Tugend and Mike McCormac to show them the size of the location and the erosion controls that have been installed on this wellsite. No violations at this time. | ||||
-2011543306 | 2010-09-21 | Inspection revealed that Union Drilling has finished moving off location and moved to Jefferson County for Marquette Exploration. No violations at this time. | ||||
-842239317 | 2010-09-29 | |||||
-897582845 | 2010-09-15 | Inspection revealed that Union Drilling has TD'ed the well at 9503' . They are logging the well at this time. No violations at this time. NOTE: Accompanied by Kyle Tharp during this inspection. | ||||
1105474281 | 2010-09-20 | Inspection revealed that Union Drilling is moving off location. No violations at this time. | ||||
1828331005 | 2010-08-31 | Inspection revealed that Union Drilling is drilling and there are no violations at this time. | ||||
1877722546 | 2010-07-14 | Inspection revealed that they are building the location and working on the lease road. The dozer operator advised that the rig should be on location within 2 to 3 weeks. No violations at this time. | ||||
549259841 | 2010-07-27 | Inspection revealed that the location is finished and the drilling pit has been dug and lined. The operator has installed orange fence around the drilling pit. The drilling rig should be onsite within the next to ten days. No violations at this time. | ||||
642531859 | 2010-06-23 | On site to conduct a post permit issuance inspection. Inspection revealed that the well stake is located on the south side of State Route 43 in an open hayfield. The stake is identified as the White# 1 well. Ingress to this well will be from State Route 43. | ||||
644711159 | 2010-09-09 | Inspection revealed that Union Drilling is working on the rig. No violations at this time. | ||||
66549640 | 2010-09-15 | Met with company representative and the rig toolpusher to set up plug job for tomorrow morning. No violations at this time. | ||||
756226330 | 2010-08-02 | Inspection revealed that the lease road has been stoned all the way to the well site. A stone pad has been constructed for the drilling rig and the service rig to sit on while drilling and servicing the well. I spoke with Craig Norton ( Enervest Operating LLC)(via cell phone) and he advised that the drilling rig ( Union Drilling) should be on location in approximately a week. The rig is on a well near Kimbolton and when they finish up on that well they will be moving onto this site. No violations at this time. | ||||
757633914 | 2010-08-29 | On site to witness the BOP Tests. They tested the BOP's, choke manifold, and annular space with high pressure (2500-3000 PSI) and low pressure. Took several attempys to get BOP's to test due to several small leaks. No violations at this time. |