If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1116073316000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.680823,"lon":-119.094789,"icon":""}]} |
Location: 00/16-33-111-07W6/0 | |
Location Alias: 00/16-33-11-07 W6M | |
Location Alias 2: 00/16-33-111-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 111 | |
Meridian: 6 | |
Range: 07 | |
Section: 33 | |
County/Municipality: Mackenzie County | |
Well Name: MOBIL HUSKY HZ RAIN 16-33-111-7 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0211978 | |
License Date: 1998-01-14 | |
License Status: Abandoned | |
Spud Date: 1998-01-27 | |
Final Drill Date: 1998-02-24 | |
Well Total Depth: 2350.00 m | |
Surface Hole Latitude: 58.680823 | |
Surface Hole Longitude: -119.094789 |
Date | Event |
---|---|
1998-01-14 | Obtained License |
1998-01-28 | Lost Circulation Occurred |
1998-01-30 | Surface Casing Operation Performed |
1998-02-04 | Direction Drilling Operation Performed - Horizontal |
1998-02-10 | Lost Circulation Occurred |
1998-02-15 | Lost Circulation Occurred |
1998-02-16 | Well Log Performed |
1998-02-17 | Intermediate Casing Operation Performed |
1998-02-22 | Well Log Performed |
1998-02-24 | Finished Drilling |
1998-02-24 | Well Log Performed |
1998-02-24 | Well Mode changed to Drilled and Cased |
1998-02-25 | Perforation Treatment Performed - Open-Hole Completion |
1998-02-25 | Rig Released |
1998-03-20 | Well Began Production |
1998-03-20 | Well Fluid changed to Crude Oil |
1998-03-20 | Well Mode changed to Flowing |
1998-04-07 | Well Fluid changed to Crude Oil |
1998-04-07 | Well Mode changed to Suspended |
1998-12-10 | Well Fluid changed to Crude Oil |
1998-12-10 | Well Mode changed to Flowing |
1999-01-20 | Well Fluid changed to Crude Oil |
1999-01-20 | Well Mode changed to Suspended |
2006-02-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-17 | Perforation Treatment Performed - Jet Perforation |
2006-02-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-18 | Perforation Treatment Performed - Remedial Casing |
2006-02-18 | Plug Back Performed |
2006-02-18 | Well Fluid changed to Crude Oil |
2006-02-18 | Well Mode changed to Abandoned Zone |
2007-02-02 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2007-02-02 | Perforation Treatment Performed - Jet Perforation |
2007-02-21 | Perforation Treatment Performed - Remedial Casing |
2007-02-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-02-22 | Plug Back Performed |
2007-02-22 | Well Log Performed |
2007-03-03 | Well Log Performed |
2007-03-05 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2007-03-06 | Perforation Treatment Performed - Remedial Casing |
2007-03-07 | Perforation Treatment Performed - Cement Plug |
2008-01-13 | Well Log Performed |
2008-01-15 | Well Log Performed |
2008-01-16 | Perforation Treatment Performed - Jet Perforation |
2008-01-16 | Well Log Performed |
2008-01-17 | Perforation Treatment Performed - Remedial Casing |
2008-01-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-01-19 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2008-01-21 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2008-01-23 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2008-01-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-01-23 | Perforation Treatment Performed - Remedial Casing |
2008-01-24 | Perforation Treatment Performed - Remedial Casing |
2008-02-16 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2008-02-16 | Perforation Treatment Performed - Remedial Casing |
2008-02-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-02-29 | Well Log Performed |
2012-03-08 | Well Log Performed |
2012-03-09 | Perforation Treatment Performed - Jet Perforation |
2012-03-09 | Well Log Performed |
2012-03-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-03-13 | Perforation Treatment Performed - Cement Plug |
2012-03-13 | Perforation Treatment Performed - Remedial Casing |
2012-03-13 | Plug Back Performed |
2012-03-15 | Well Log Performed |
2013-02-24 | Well Abandoned |
2013-02-24 | Well Fluid changed to Crude Oil |
2013-02-24 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1998-02-04 | 1210.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-02-25 | Open Hole/Barefoot Completion | 2046.00 | 2350.00 | 0 |
2007-03-05 | Hydra Jet Perforation | 312.00 | 313.00 | 1 |
2007-03-06 | Remedial Casing Cementing | 312.00 | 313.00 | 0 |
2007-03-07 | Cement Plug | 229.00 | 313.00 | 0 |
2008-01-16 | Perforation | 620.00 | 622.00 | 17 |
2008-01-17 | Remedial Casing Cementing | 620.00 | 622.00 | 0 |
2008-01-18 | Packing Device Capped w/Cement | 547.00 | 628.10 | 0 |
2008-01-19 | Hydra Jet Perforation | 396.00 | 397.00 | 1 |
2008-01-21 | Hydra Jet Perforation | 394.00 | 395.00 | 1 |
2008-01-23 | Remedial Casing Cementing | 394.00 | 397.00 | 0 |
2008-01-23 | Packing Device Capped w/Cement | 386.00 | 388.00 | 0 |
2006-02-16 | Packing Device Capped w/Cement | 1765.00 | 1965.50 | 0 |
2008-01-23 | Hydra Jet Perforation | 315.00 | 317.00 | 1 |
2008-01-24 | Remedial Casing Cementing | 315.00 | 317.00 | 0 |
2008-02-16 | Hydra Jet Perforation | 305.00 | 307.00 | 1 |
2008-02-16 | Remedial Casing Cementing | 305.00 | 307.00 | 0 |
2008-02-17 | Packing Device Capped w/Cement | 288.00 | 301.00 | 0 |
2012-03-09 | Perforation | 409.00 | 410.00 | 99 |
2012-03-09 | Perforation | 365.00 | 366.00 | 99 |
2012-03-09 | Perforation | 344.00 | 345.00 | 99 |
2012-03-09 | Perforation | 305.00 | 306.00 | 99 |
2012-03-13 | Remedial Casing Cementing | 305.00 | 410.00 | 0 |
2006-02-17 | Perforation | 425.00 | 425.30 | 17 |
2012-03-13 | Cement Plug | 317.00 | 430.00 | 0 |
2012-03-13 | Packing Device Capped w/Cement | 281.00 | 296.00 | 0 |
2006-02-18 | Remedial Casing Cementing | 425.00 | 425.30 | 0 |
2006-02-18 | Packing Device Capped w/Cement | 398.70 | 416.70 | 0 |
2007-02-02 | Perforation | 390.00 | 392.00 | 17 |
2007-02-02 | Hydra Jet Perforation | 390.70 | 391.00 | 36 |
2007-02-21 | Remedial Casing Cementing | 390.00 | 392.00 | 0 |
2007-02-22 | Packing Device Capped w/Cement | 351.00 | 385.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 415 | 0.0 | 0.0 | 0.0 |
1999 | 139 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1998-01-28 | Lost Circulation | 186.00 | 249.00 |
1998-02-10 | Lost Circulation | 1762.00 | 1769.00 |
1998-02-15 | Lost Circulation | 2046.00 | 2046.00 |
For data sources see[7]