X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915122813000

Well Details

Well ID: 0915122813000
Loading map...
Location: 00/13-28-091-12W5/0
Location Alias: 00/13-28-91-12 W5M
Location Alias 2: 00/13-28-091-12 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 12
Section: 28
County/Municipality: Northern Sunrise County
Well Name: AMOCO SAWN 13-28-91-12
Operator Name: BP Canada Energy Group ULC
License Number: 0105571
License Date: 1984-01-27
License Status: RecCertified
Spud Date: 1984-02-19
Final Drill Date: 1984-03-17
Well Total Depth: 1751.60 m
Surface Hole Latitude: 56.927626
Surface Hole Longitude: -115.875322

For data sources see[1][2]

Well History

Date Event
1984-01-27 Obtained License
1984-02-23 Drill Stem Test Performed
1984-02-23 Lost Circulation Occurred
1984-03-05 Well Log Performed
1984-03-11 Drill Stem Test Performed
1984-03-17 Finished Drilling
1984-03-17 Well Log Performed
1984-03-17 Well Mode changed to Drilled and Cased
1984-03-18 Well Log Performed
1984-03-19 Liner Casing Operation Performed
1984-03-24 Perforation Treatment Performed - Jet Perforation
1984-03-24 Well Log Performed
1984-03-25 Well Log Performed
1984-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-27 Perforation Treatment Performed - Jet Perforation
1984-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-02 Well Began Production
1984-08-02 Well Fluid changed to Crude Oil
1984-08-02 Well Mode changed to Pumping
1985-01-26 Perforation Treatment Performed - Fractured
1985-04-01 Well Fluid changed to Crude Oil
1985-04-01 Well Mode changed to Suspended
1985-06-01 Well Fluid changed to Crude Oil
1985-06-01 Well Mode changed to Pumping
1986-03-01 Well Fluid changed to Crude Oil
1986-03-01 Well Mode changed to Suspended
1989-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-10 Plug Back Performed
1989-09-10 Well Abandoned
1989-09-10 Well Fluid changed to Crude Oil
1989-09-10 Well Log Performed
1989-09-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-03-24 Perforation 1597.00 1599.50 13
1984-03-26 Acid Treatment 1597.00 1599.50 0
1984-03-27 Perforation 1587.50 1592.50 13
1984-03-29 Acid Treatment 1587.50 1599.50 0
1985-01-26 Fracture 1587.50 1599.50 0
1989-09-10 Packing Device Capped w/Cement 1554.00 1562.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2184 0.0 0.0 0.0
1985 5017 0.0 0.0 0.0
1986 1152 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-02-23 Lost Circulation 725.00 1460.00

For data sources see[6]

References