X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886091916002

Well Details

Well ID: 0886091916002
Loading map...
Location: 00/16-19-088-09W6/2
Location Alias: 00/16-19-88-09 W6M
Location Alias 2: 00/16-19-088-09 W6/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 09
Section: 19
County/Municipality: Clear Hills County
Well Name: BIRCHCLIFF HZ WORSLEY 16-19-88-9
Operator Name: Enercapita Energy Ltd.
License Number: 0443187
License Date: 2012-01-23
License Status: Amended
Spud Date: 2012-02-01
Final Drill Date: 2012-02-18
Well Total Depth: 2733.00 m
Surface Hole Latitude: 56.650808
Surface Hole Longitude: -119.436382

For data sources see[1][2]

Well History

Date Event
2012-01-23 Obtained License
2012-02-03 Surface Casing Operation Performed
2012-02-09 Direction Drilling Operation Performed - Horizontal
2012-02-12 Intermediate Casing Operation Performed
2012-02-18 Finished Drilling
2012-02-18 Well Mode changed to Drilled and Cased
2012-02-19 Liner Casing Operation Performed
2012-02-20 Rig Released
2012-03-09 Perforation Treatment Performed - Open-Hole Completion
2012-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-08 Well Began Production
2012-05-08 Well Fluid changed to Crude Oil
2012-05-08 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-02-09 1033.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-09 Open Hole/Barefoot Completion 2727.00 2733.00 0
2012-03-12 Multi-Stage Fracture 1791.20 1792.00 0
2012-03-12 Multi-Stage Fracture 1706.80 1707.60 0
2012-03-12 Multi-Stage Fracture 1623.30 1624.10 0
2012-03-11 Multi-Stage Fracture 2670.50 2671.30 0
2012-03-11 Multi-Stage Fracture 2572.70 2573.50 0
2012-03-11 Multi-Stage Fracture 2449.60 2450.40 0
2012-03-11 Multi-Stage Fracture 2300.30 2301.10 0
2012-03-11 Multi-Stage Fracture 2203.10 2203.90 0
2012-03-11 Multi-Stage Fracture 2094.10 2094.90 0
2012-03-11 Multi-Stage Fracture 1944.50 1945.30 0
2012-03-12 Multi-Stage Fracture 1874.30 1875.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4757 0.0 0.0 0.0
2013 7743 0.0 0.0 0.0
2014 8608 0.0 0.0 0.0
2015 8468 0.0 0.0 0.0
2016 5973 0.0 0.0 0.0
2017 8031 0.0 0.0 0.0
2018 7550 0.0 0.0 0.0
2019 7634 0.0 0.0 0.0
2020 2153 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References