If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0886091916002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.650808,"lon":-119.436382,"icon":""}]} |
Location: 00/16-19-088-09W6/2 | |
Location Alias: 00/16-19-88-09 W6M | |
Location Alias 2: 00/16-19-088-09 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 6 | |
Range: 09 | |
Section: 19 | |
County/Municipality: Clear Hills County | |
Well Name: BIRCHCLIFF HZ WORSLEY 16-19-88-9 | |
Operator Name: Enercapita Energy Ltd. | |
License Number: 0443187 | |
License Date: 2012-01-23 | |
License Status: Amended | |
Spud Date: 2012-02-01 | |
Final Drill Date: 2012-02-18 | |
Well Total Depth: 2733.00 m | |
Surface Hole Latitude: 56.650808 | |
Surface Hole Longitude: -119.436382 |
Date | Event |
---|---|
2012-01-23 | Obtained License |
2012-02-03 | Surface Casing Operation Performed |
2012-02-09 | Direction Drilling Operation Performed - Horizontal |
2012-02-12 | Intermediate Casing Operation Performed |
2012-02-18 | Finished Drilling |
2012-02-18 | Well Mode changed to Drilled and Cased |
2012-02-19 | Liner Casing Operation Performed |
2012-02-20 | Rig Released |
2012-03-09 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-08 | Well Began Production |
2012-05-08 | Well Fluid changed to Crude Oil |
2012-05-08 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-09 | 1033.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-09 | Open Hole/Barefoot Completion | 2727.00 | 2733.00 | 0 |
2012-03-12 | Multi-Stage Fracture | 1791.20 | 1792.00 | 0 |
2012-03-12 | Multi-Stage Fracture | 1706.80 | 1707.60 | 0 |
2012-03-12 | Multi-Stage Fracture | 1623.30 | 1624.10 | 0 |
2012-03-11 | Multi-Stage Fracture | 2670.50 | 2671.30 | 0 |
2012-03-11 | Multi-Stage Fracture | 2572.70 | 2573.50 | 0 |
2012-03-11 | Multi-Stage Fracture | 2449.60 | 2450.40 | 0 |
2012-03-11 | Multi-Stage Fracture | 2300.30 | 2301.10 | 0 |
2012-03-11 | Multi-Stage Fracture | 2203.10 | 2203.90 | 0 |
2012-03-11 | Multi-Stage Fracture | 2094.10 | 2094.90 | 0 |
2012-03-11 | Multi-Stage Fracture | 1944.50 | 1945.30 | 0 |
2012-03-12 | Multi-Stage Fracture | 1874.30 | 1875.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4757 | 0.0 | 0.0 | 0.0 |
2013 | 7743 | 0.0 | 0.0 | 0.0 |
2014 | 8608 | 0.0 | 0.0 | 0.0 |
2015 | 8468 | 0.0 | 0.0 | 0.0 |
2016 | 5973 | 0.0 | 0.0 | 0.0 |
2017 | 8031 | 0.0 | 0.0 | 0.0 |
2018 | 7550 | 0.0 | 0.0 | 0.0 |
2019 | 7634 | 0.0 | 0.0 | 0.0 |
2020 | 2153 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]