X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885121212002

Well Details

Well ID: 0885121212002
Loading map...
Location: 00/12-12-088-12W5/2
Location Alias: 00/12-12-88-12 W5M
Location Alias 2: 00/12-12-088-12 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 12
Section: 12
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 12-12-88-12
Operator Name: Surge Energy Inc.
License Number: 0432201
License Date: 2011-03-08
License Status: Issued
Spud Date: 2011-08-15
Final Drill Date: 2011-09-05
Well Total Depth: 3220.00 m
Surface Hole Latitude: 56.618998
Surface Hole Longitude: -115.751871

For data sources see[1][2]

Well History

Date Event
2011-03-08 Obtained License
2011-08-16 Surface Casing Operation Performed
2011-08-18 Direction Drilling Operation Performed - Horizontal
2011-08-22 Intermediate Casing Operation Performed
2011-08-29 Direction Drilling Operation Performed - Horizontal
2011-09-05 Finished Drilling
2011-09-05 Well Log Performed
2011-09-05 Well Mode changed to Drilled and Cased
2011-09-08 Liner Casing Operation Performed
2011-09-08 Rig Released
2011-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-29 Perforation Treatment Performed - Open-Hole Completion
2011-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-25 Well Began Production
2011-11-25 Well Fluid changed to Crude Oil
2011-11-25 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-18 1099.30 Horizontal
2011-08-29 1656.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-29 Open Hole/Barefoot Completion 3216.00 3220.00 0
2011-10-30 Multi-Stage Fracture 2641.00 2642.00 0
2011-10-30 Multi-Stage Fracture 2567.60 2568.60 0
2011-10-30 Multi-Stage Fracture 2495.20 2496.20 0
2011-10-30 Multi-Stage Fracture 2435.60 2436.60 0
2011-10-30 Multi-Stage Fracture 2362.70 2363.70 0
2011-10-30 Multi-Stage Fracture 2291.60 2292.60 0
2011-10-30 Multi-Stage Fracture 2232.10 2233.10 0
2011-10-31 Multi-Stage Fracture 2158.70 2159.70 0
2011-10-31 Multi-Stage Fracture 2085.60 2086.60 0
2011-10-31 Multi-Stage Fracture 2026.30 2027.30 0
2011-10-29 Multi-Stage Fracture 3193.00 3194.00 0
2011-10-31 Multi-Stage Fracture 1953.20 1954.20 0
2011-10-31 Multi-Stage Fracture 1880.30 1881.30 0
2011-10-29 Multi-Stage Fracture 3113.60 3114.60 0
2011-10-29 Multi-Stage Fracture 3053.90 3054.90 0
2011-10-29 Multi-Stage Fracture 2980.70 2981.70 0
2011-10-29 Multi-Stage Fracture 2907.30 2908.30 0
2011-10-29 Multi-Stage Fracture 2847.40 2848.40 0
2011-10-29 Multi-Stage Fracture 2774.20 2775.20 0
2011-10-30 Multi-Stage Fracture 2700.80 2701.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 407 0.0 0.0 0.0
2012 7636 0.0 0.0 0.0
2013 8400 0.0 0.0 0.0
2014 8656 0.0 0.0 0.0
2015 8567 0.0 0.0 0.0
2016 8743 0.0 0.0 0.0
2017 7730 0.0 0.0 0.0
2018 7569 0.0 0.0 0.0
2019 144 0.0 0.0 0.0

For data sources see[6]

References