If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0885110701020 | | Well ID: 0885110701020 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 56.618908, -115.761671 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Location: 02/01-07-088-11W5/0 |
|- | |- | ||
− | | Operator: | + | | Location Alias: 02/01-07-88-11 W5M |
+ | |- | ||
+ | | Location Alias 2: 02/01-07-088-11 W5/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 088 | ||
+ | |- | ||
+ | | Meridian: 5 | ||
+ | |- | ||
+ | | Range: 11 | ||
+ | |- | ||
+ | | Section: 07 | ||
+ | |- | ||
+ | | County/Municipality: [[Northern Sunrise County,_Alberta|Northern Sunrise County]] | ||
+ | |- | ||
+ | | Well Name: MBOG EVI 1-7-88-11 | ||
+ | |- | ||
+ | | Operator Name: [[Surge Energy Inc.]] | ||
+ | |- | ||
+ | | License Number: 0433062 | ||
|- | |- | ||
| License Date: 2011-04-20 | | License Date: 2011-04-20 | ||
|- | |- | ||
− | | Final | + | | License Status: Amended |
+ | |- | ||
+ | | Spud Date: 2011-11-29 | ||
+ | |- | ||
+ | | Final Drill Date: 2011-12-14 | ||
+ | |- | ||
+ | | Well Total Depth: 3399.00 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 56.618908 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -115.761671 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
|- | |- | ||
− | | | + | | 2011-04-20 |
+ | | Obtained License | ||
|- | |- | ||
− | | | + | | 2011-12-02 |
+ | | Surface Casing Operation Performed | ||
|- | |- | ||
− | | | + | | 2011-12-02 |
+ | | Well Log Performed | ||
|- | |- | ||
− | | | + | | 2011-12-04 |
+ | | Direction Drilling Operation Performed - Horizontal | ||
|- | |- | ||
− | | | + | | 2011-12-11 |
+ | | Intermediate Casing Operation Performed | ||
|- | |- | ||
− | | | + | | 2011-12-11 |
+ | | Well Log Performed | ||
|- | |- | ||
− | | | + | | 2011-12-14 |
+ | | Finished Drilling | ||
|- | |- | ||
− | | | + | | 2011-12-14 |
+ | | Well Structure changed to Drain | ||
+ | |- | ||
+ | | 2011-12-17 | ||
+ | | Liner Casing Operation Performed | ||
+ | |- | ||
+ | | 2012-01-11 | ||
+ | | Rig Released | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Perforation Treatment Performed - Open-Hole Completion | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | | 2011-12-04 | ||
+ | | style="text-align: right;" | 997.00 | ||
+ | | Horizontal | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Direction Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Open Hole/Barefoot Completion | ||
+ | | style="text-align: right;" | 3395.00 | ||
+ | | style="text-align: right;" | 3399.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3106.60 | ||
+ | | style="text-align: right;" | 3106.70 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3070.30 | ||
+ | | style="text-align: right;" | 3070.40 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3042.50 | ||
+ | | style="text-align: right;" | 3042.60 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3010.40 | ||
+ | | style="text-align: right;" | 3010.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2982.30 | ||
+ | | style="text-align: right;" | 2982.40 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2945.70 | ||
+ | | style="text-align: right;" | 2945.80 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2917.40 | ||
+ | | style="text-align: right;" | 2917.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2884.60 | ||
+ | | style="text-align: right;" | 2884.70 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2856.20 | ||
+ | | style="text-align: right;" | 2856.30 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2806.50 | ||
+ | | style="text-align: right;" | 2806.60 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3372.20 | ||
+ | | style="text-align: right;" | 3372.30 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2745.40 | ||
+ | | style="text-align: right;" | 2745.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2684.80 | ||
+ | | style="text-align: right;" | 2684.90 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2624.40 | ||
+ | | style="text-align: right;" | 2624.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2550.20 | ||
+ | | style="text-align: right;" | 2550.30 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2494.10 | ||
+ | | style="text-align: right;" | 2494.20 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2434.10 | ||
+ | | style="text-align: right;" | 2434.20 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2373.50 | ||
+ | | style="text-align: right;" | 2373.60 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2301.20 | ||
+ | | style="text-align: right;" | 2301.30 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3318.70 | ||
+ | | style="text-align: right;" | 3318.80 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3290.80 | ||
+ | | style="text-align: right;" | 3290.90 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3258.60 | ||
+ | | style="text-align: right;" | 3258.70 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3230.50 | ||
+ | | style="text-align: right;" | 3230.60 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3194.40 | ||
+ | | style="text-align: right;" | 3194.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3166.60 | ||
+ | | style="text-align: right;" | 3166.70 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-02-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3134.40 | ||
+ | | style="text-align: right;" | 3134.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | | 2012-04-09 | ||
+ | | No Incident Encountered | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Occurence Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
Well ID: 0885110701020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.618908,"lon":-115.761671,"icon":""}]} |
Location: 02/01-07-088-11W5/0 | |
Location Alias: 02/01-07-88-11 W5M | |
Location Alias 2: 02/01-07-088-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 5 | |
Range: 11 | |
Section: 07 | |
County/Municipality: Northern Sunrise County | |
Well Name: MBOG EVI 1-7-88-11 | |
Operator Name: Surge Energy Inc. | |
License Number: 0433062 | |
License Date: 2011-04-20 | |
License Status: Amended | |
Spud Date: 2011-11-29 | |
Final Drill Date: 2011-12-14 | |
Well Total Depth: 3399.00 m | |
Surface Hole Latitude: 56.618908 | |
Surface Hole Longitude: -115.761671 |
Date | Event |
---|---|
2011-04-20 | Obtained License |
2011-12-02 | Surface Casing Operation Performed |
2011-12-02 | Well Log Performed |
2011-12-04 | Direction Drilling Operation Performed - Horizontal |
2011-12-11 | Intermediate Casing Operation Performed |
2011-12-11 | Well Log Performed |
2011-12-14 | Finished Drilling |
2011-12-14 | Well Structure changed to Drain |
2011-12-17 | Liner Casing Operation Performed |
2012-01-11 | Rig Released |
2012-02-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-29 | Perforation Treatment Performed - Open-Hole Completion |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-12-04 | 997.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-29 | Open Hole/Barefoot Completion | 3395.00 | 3399.00 | 0 |
2012-02-29 | Multi-Stage Fracture | 3106.60 | 3106.70 | 0 |
2012-02-29 | Multi-Stage Fracture | 3070.30 | 3070.40 | 0 |
2012-02-29 | Multi-Stage Fracture | 3042.50 | 3042.60 | 0 |
2012-02-29 | Multi-Stage Fracture | 3010.40 | 3010.50 | 0 |
2012-02-29 | Multi-Stage Fracture | 2982.30 | 2982.40 | 0 |
2012-02-29 | Multi-Stage Fracture | 2945.70 | 2945.80 | 0 |
2012-02-29 | Multi-Stage Fracture | 2917.40 | 2917.50 | 0 |
2012-02-29 | Multi-Stage Fracture | 2884.60 | 2884.70 | 0 |
2012-02-29 | Multi-Stage Fracture | 2856.20 | 2856.30 | 0 |
2012-02-29 | Multi-Stage Fracture | 2806.50 | 2806.60 | 0 |
2012-02-29 | Multi-Stage Fracture | 3372.20 | 3372.30 | 0 |
2012-02-29 | Multi-Stage Fracture | 2745.40 | 2745.50 | 0 |
2012-02-29 | Multi-Stage Fracture | 2684.80 | 2684.90 | 0 |
2012-02-29 | Multi-Stage Fracture | 2624.40 | 2624.50 | 0 |
2012-02-29 | Multi-Stage Fracture | 2550.20 | 2550.30 | 0 |
2012-02-29 | Multi-Stage Fracture | 2494.10 | 2494.20 | 0 |
2012-02-29 | Multi-Stage Fracture | 2434.10 | 2434.20 | 0 |
2012-02-29 | Multi-Stage Fracture | 2373.50 | 2373.60 | 0 |
2012-02-29 | Multi-Stage Fracture | 2301.20 | 2301.30 | 0 |
2012-02-29 | Multi-Stage Fracture | 3318.70 | 3318.80 | 0 |
2012-02-29 | Multi-Stage Fracture | 3290.80 | 3290.90 | 0 |
2012-02-29 | Multi-Stage Fracture | 3258.60 | 3258.70 | 0 |
2012-02-29 | Multi-Stage Fracture | 3230.50 | 3230.60 | 0 |
2012-02-29 | Multi-Stage Fracture | 3194.40 | 3194.50 | 0 |
2012-02-29 | Multi-Stage Fracture | 3166.60 | 3166.70 | 0 |
2012-02-29 | Multi-Stage Fracture | 3134.40 | 3134.50 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-04-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]