X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875122416030

Well Details

Well ID: 0875122416030
Loading map...
Location: 03/16-24-087-12W5/0
Location Alias: 03/16-24-87-12 W5M
Location Alias 2: 03/16-24-087-12 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 12
Section: 24
County/Municipality: Northern Sunrise County
Well Name: LONE PINE EVI 16-24-87-12
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0446324
License Date: 2012-06-06
License Status: Amended
Spud Date: 2012-08-13
Final Drill Date: 2012-08-22
Well Total Depth: 2389.00 m
Surface Hole Latitude: 56.573395
Surface Hole Longitude: -115.761551

For data sources see[1][2]

Well History

Date Event
2012-06-06 Obtained License
2012-08-14 Surface Casing Operation Performed
2012-08-17 Direction Drilling Operation Performed - Deviate
2012-08-19 Direction Drilling Operation Performed - Horizontal
2012-08-22 Finished Drilling
2012-08-22 Well Log Performed
2012-08-22 Well Mode changed to Drilled and Cased
2012-08-23 Production Casing Operation Performed
2012-08-23 Rig Released
2012-09-01 Well Began Production
2012-09-01 Well Fluid changed to Crude Oil
2012-09-01 Well Mode changed to Pumping
2012-09-04 Perforation Treatment Performed - Abrasa-Jet Perforation
2012-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-05 Perforation Treatment Performed - Abrasa-Jet Perforation
2012-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-18 Well Log Performed
2014-06-30 Well Fluid changed to Crude Oil
2014-06-30 Well Mode changed to Suspended
2014-07-01 Well Began Injection
2014-07-01 Well Fluid changed to Water
2014-07-01 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-08-17 1280.00 Deviate (5 - 79 degrees)
2012-08-19 1589.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-04 Multi-Stage Fracture 1786.30 1786.40 0
2012-09-04 Multi-Stage Fracture 2298.80 2298.90 0
2012-09-04 Hydra Jet Perforation 2350.00 2350.10 0
2012-09-05 Multi-Stage Fracture 1585.00 1585.10 0
2012-09-05 Multi-Stage Fracture 1628.60 1628.70 0
2012-09-05 Multi-Stage Fracture 1672.40 1672.50 0
2012-09-05 Multi-Stage Fracture 1729.30 1729.40 0
2012-09-05 Hydra Jet Perforation 1775.00 1775.10 0
2012-09-04 Multi-Stage Fracture 1843.30 1843.40 0
2012-09-04 Multi-Stage Fracture 1900.20 1900.30 0
2012-09-04 Multi-Stage Fracture 1957.20 1957.30 0
2012-09-04 Multi-Stage Fracture 2014.10 2014.20 0
2012-09-04 Multi-Stage Fracture 2071.10 2071.20 0
2012-09-04 Multi-Stage Fracture 2128.00 2128.20 0
2012-09-04 Multi-Stage Fracture 2185.00 2185.10 0
2012-09-04 Multi-Stage Fracture 2241.80 2241.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1447 0.0 0.0 0.0
2013 8508 0.0 0.0 0.0
2014 1480 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-23 No Incident Encountered 0.00 0.00
2012-09-15 No Incident Encountered 0.00 0.00
2014-03-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References