X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0836061606000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0836061606000
 
| Well ID: 0836061606000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 56.194509, -118.887371 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 56.195433, -118.886074 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/06-16-083-06W6/0
 +
|-
 +
| Location Alias: 00/06-16-83-06 W6M
 +
|-
 +
| Location Alias 2: 00/06-16-083-06 W6/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 083
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 06
 +
|-
 +
| Section: 16
 +
|-
 +
| County/Municipality: [[Clear Hills County,_Alberta|Clear Hills County]]
 
|-
 
|-
 
| Well Name: RIGEL OAK 6-16-83-6
 
| Well Name: RIGEL OAK 6-16-83-6
 
|-
 
|-
| Operator:
+
| Operator Name: [[Repsol Oil & Gas Canada Inc.]]
 +
|-
 +
| License Number: 0220614
 
|-
 
|-
 
| License Date: 1999-01-11
 
| License Date: 1999-01-11
 
|-
 
|-
| Final Drilling Date: 1999-01-30
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1999-01-15
 +
|-
 +
| Final Drill Date: 1999-01-30
 +
|-
 +
| Well Total Depth: 1525.00 m
 +
|-
 +
| Surface Hole Latitude: 56.195433
 +
|-
 +
| Surface Hole Longitude: -118.886074
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1999-01-11
 +
| Obtained License
 +
|-
 +
| 1999-01-26
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1999-01-30
 +
| Finished Drilling
 +
|-
 +
| 1999-01-31
 +
| Well Log Performed
 +
|-
 +
| 1999-02-01
 +
| Drill Stem Test Performed
 +
|-
 +
| 1999-02-02
 +
| Drill Stem Test Performed
 +
|-
 +
| 1999-02-02
 +
| Production Casing Operation Performed
 +
|-
 +
| 1999-02-02
 +
| Well Log Performed
 
|-
 
|-
| Total Depth: 1525.0m
+
| 1999-02-03
 +
| Rig Released
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1999-02-03
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Status: Abandoned
+
| 1999-02-19
 +
| Well Log Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 1999-02-20
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Configuration: Vertical
+
| 1999-02-20
 +
| Well Log Performed
 
|-
 
|-
| Violations:
+
| 1999-02-22
 +
| Well Log Performed
 
|-
 
|-
| Latitude: 56.194509
+
| 1999-02-28
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Longitude: -118.887371
+
| 1999-02-28
 +
| Well Log Performed
 +
|-
 +
| 1999-03-03
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1999-03-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-03-06
 +
| Well Log Performed
 +
|-
 +
| 1999-03-13
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1999-04-01
 +
| Well Began Production
 +
|-
 +
| 1999-04-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1999-04-01
 +
| Well Mode changed to Pumping
 +
|-
 +
| 2001-09-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-09-06
 +
| Well Log Performed
 +
|-
 +
| 2001-09-11
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-09-11
 +
| Plug Back Performed
 +
|-
 +
| 2001-09-11
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2001-09-11
 +
| Well Log Performed
 +
|-
 +
| 2001-09-11
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2001-09-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-09-14
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-09-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-09-14
 +
| Plug Back Performed
 +
|-
 +
| 2001-09-14
 +
| Well Log Performed
 +
|-
 +
| 2001-09-16
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-09-16
 +
| Plug Back Performed
 +
|-
 +
| 2001-09-16
 +
| Well Log Performed
 +
|-
 +
| 2001-10-18
 +
| Well Abandoned
 +
|-
 +
| 2001-10-18
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2001-10-18
 +
| Well Mode changed to Abandoned
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1999-02-20
 +
| Perforation
 +
| style="text-align: right;" | 1441.50
 +
| style="text-align: right;" | 1447.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-09-11
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1467.00
 +
| style="text-align: right;" | 1475.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-09-12
 +
| Perforation
 +
| style="text-align: right;" | 1079.00
 +
| style="text-align: right;" | 1080.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-09-12
 +
| Perforation
 +
| style="text-align: right;" | 1055.00
 +
| style="text-align: right;" | 1058.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-09-14
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1042.00
 +
| style="text-align: right;" | 1050.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-09-14
 +
| Perforation
 +
| style="text-align: right;" | 898.00
 +
| style="text-align: right;" | 901.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-09-16
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 886.00
 +
| style="text-align: right;" | 894.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-02-20
 +
| Perforation
 +
| style="text-align: right;" | 1484.00
 +
| style="text-align: right;" | 1486.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 1999-02-28
 +
| Perforation
 +
| style="text-align: right;" | 1489.80
 +
| style="text-align: right;" | 1490.40
 +
| style="text-align: right;" | 17
 +
|-
 +
| 1999-03-03
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1489.80
 +
| style="text-align: right;" | 1490.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-03-03
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1484.00
 +
| style="text-align: right;" | 1486.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-03-06
 +
| Perforation
 +
| style="text-align: right;" | 1441.50
 +
| style="text-align: right;" | 1447.00
 +
| style="text-align: right;" | 18
 +
|-
 +
| 1999-03-06
 +
| Perforation
 +
| style="text-align: right;" | 1484.00
 +
| style="text-align: right;" | 1486.50
 +
| style="text-align: right;" | 18
 +
|-
 +
| 1999-03-13
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1441.50
 +
| style="text-align: right;" | 1447.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-09-06
 +
| Perforation
 +
| style="text-align: right;" | 1480.00
 +
| style="text-align: right;" | 1482.00
 +
| style="text-align: right;" | 17
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1999
 +
| style="text-align: right;" | 5820
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2000
 +
| style="text-align: right;" | 1235
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2001
 +
| style="text-align: right;" | 48
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 17:38, 19 January 2021

Well Details

Well ID: 0836061606000
Loading map...
Location: 00/06-16-083-06W6/0
Location Alias: 00/06-16-83-06 W6M
Location Alias 2: 00/06-16-083-06 W6/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 6
Range: 06
Section: 16
County/Municipality: Clear Hills County
Well Name: RIGEL OAK 6-16-83-6
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0220614
License Date: 1999-01-11
License Status: RecCertified
Spud Date: 1999-01-15
Final Drill Date: 1999-01-30
Well Total Depth: 1525.00 m
Surface Hole Latitude: 56.195433
Surface Hole Longitude: -118.886074

For data sources see[1][2]

Well History

Date Event
1999-01-11 Obtained License
1999-01-26 Surface Casing Operation Performed
1999-01-30 Finished Drilling
1999-01-31 Well Log Performed
1999-02-01 Drill Stem Test Performed
1999-02-02 Drill Stem Test Performed
1999-02-02 Production Casing Operation Performed
1999-02-02 Well Log Performed
1999-02-03 Rig Released
1999-02-03 Well Mode changed to Drilled and Cased
1999-02-19 Well Log Performed
1999-02-20 Perforation Treatment Performed - Jet Perforation
1999-02-20 Well Log Performed
1999-02-22 Well Log Performed
1999-02-28 Perforation Treatment Performed - Jet Perforation
1999-02-28 Well Log Performed
1999-03-03 Perforation Treatment Performed - Cement Squeeze
1999-03-06 Perforation Treatment Performed - Jet Perforation
1999-03-06 Well Log Performed
1999-03-13 Perforation Treatment Performed - Cement Squeeze
1999-04-01 Well Began Production
1999-04-01 Well Fluid changed to Crude Oil
1999-04-01 Well Mode changed to Pumping
2001-09-06 Perforation Treatment Performed - Jet Perforation
2001-09-06 Well Log Performed
2001-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-11 Plug Back Performed
2001-09-11 Well Fluid changed to Crude Oil
2001-09-11 Well Log Performed
2001-09-11 Well Mode changed to Abandoned Zone
2001-09-12 Perforation Treatment Performed - Jet Perforation
2001-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-14 Perforation Treatment Performed - Jet Perforation
2001-09-14 Plug Back Performed
2001-09-14 Well Log Performed
2001-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-16 Plug Back Performed
2001-09-16 Well Log Performed
2001-10-18 Well Abandoned
2001-10-18 Well Fluid changed to Crude Oil
2001-10-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-02-20 Perforation 1441.50 1447.00 17
2001-09-11 Packing Device Capped w/Cement 1467.00 1475.00 0
2001-09-12 Perforation 1079.00 1080.50 17
2001-09-12 Perforation 1055.00 1058.00 17
2001-09-14 Packing Device Capped w/Cement 1042.00 1050.00 0
2001-09-14 Perforation 898.00 901.00 17
2001-09-16 Packing Device Capped w/Cement 886.00 894.00 0
1999-02-20 Perforation 1484.00 1486.50 17
1999-02-28 Perforation 1489.80 1490.40 17
1999-03-03 Cement Squeeze 1489.80 1490.40 0
1999-03-03 Cement Squeeze 1484.00 1486.50 0
1999-03-06 Perforation 1441.50 1447.00 18
1999-03-06 Perforation 1484.00 1486.50 18
1999-03-13 Cement Squeeze 1441.50 1447.00 0
2001-09-06 Perforation 1480.00 1482.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 5820 0.0 0.0 0.0
2000 1235 0.0 0.0 0.0
2001 48 0.0 0.0 0.0

For data sources see[5]

References