X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795233615020

Well Details

Well ID: 0795233615020
Loading map...
Location: 02/15-36-079-23W5/0
Location Alias: 02/15-36-79-23 W5M
Location Alias 2: 02/15-36-079-23 W5/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 23
Section: 36
County/Municipality: Municipal District of Smoky River No. 130
Well Name: CNRL HZ NVILLE 15-36-79-23
Operator Name: Canadian Natural Resources Limited
License Number: 0447990
License Date: 2012-08-24
License Status: Issued
Spud Date: 2012-09-28
Final Drill Date: 2012-10-09
Well Total Depth: 2476.00 m
Surface Hole Latitude: 55.881608
Surface Hole Longitude: -117.451053

For data sources see[1][2]

Well History

Date Event
2012-08-24 Obtained License
2012-09-10 Well Log Performed
2012-09-29 Lost Circulation Occurred
2012-09-29 Surface Casing Operation Performed
2012-10-01 Direction Drilling Operation Performed - Deviate
2012-10-02 Direction Drilling Operation Performed - Horizontal
2012-10-02 Well Log Performed
2012-10-03 Intermediate Casing Operation Performed
2012-10-09 Finished Drilling
2012-10-09 Well Log Performed
2012-10-09 Well Mode changed to Drilled and Cased
2012-10-10 Well Log Performed
2012-10-11 Perforation Treatment Performed - Open-Hole Completion
2012-10-11 Rig Released
2012-11-26 Well Log Performed
2012-11-27 Well Log Performed
2012-11-28 Well Log Performed
2012-11-29 Well Log Performed
2012-12-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-20 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-21 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-25 Well Began Production
2013-03-25 Well Fluid changed to Crude Oil
2013-03-25 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-28 Horizon Drilling Inc. 31 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-01 528.80 Deviate (5 - 79 degrees)
2012-10-02 1119.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-11 Open Hole/Barefoot Completion 1222.50 2476.00 0
2012-12-19 Multi-Stage Fracture 2046.50 2046.60 0
2012-12-19 Multi-Stage Fracture 1995.00 1995.10 0
2012-12-20 Multi-Stage Fracture 1945.00 1945.10 0
2012-12-20 Multi-Stage Fracture 1896.50 1896.60 0
2012-12-20 Multi-Stage Fracture 1845.00 1845.10 0
2012-12-20 Multi-Stage Fracture 1795.00 1795.10 0
2012-12-20 Multi-Stage Fracture 1745.00 1745.10 0
2012-12-20 Multi-Stage Fracture 1695.00 1695.10 0
2012-12-20 Multi-Stage Fracture 1645.00 1645.10 0
2012-12-20 Multi-Stage Fracture 1595.00 1595.10 0
2012-12-18 Multi-Stage Fracture 2444.50 2444.60 0
2012-12-20 Multi-Stage Fracture 1545.00 1545.10 0
2012-12-21 Multi-Stage Fracture 1495.00 1495.10 0
2012-12-21 Multi-Stage Fracture 1440.00 1440.10 0
2012-12-21 Multi-Stage Fracture 1395.00 1395.10 0
2012-12-21 Multi-Stage Fracture 1345.00 1345.10 0
2012-12-21 Multi-Stage Fracture 1296.00 1296.10 0
2012-12-21 Multi-Stage Fracture 1245.00 1245.10 0
2012-12-18 Multi-Stage Fracture 2395.00 2395.10 0
2012-12-18 Multi-Stage Fracture 2345.00 2345.10 0
2012-12-18 Multi-Stage Fracture 2295.00 2295.10 0
2012-12-19 Multi-Stage Fracture 2245.00 2245.10 0
2012-12-19 Multi-Stage Fracture 2194.00 2194.10 0
2012-12-19 Multi-Stage Fracture 2145.00 2145.10 0
2012-12-19 Multi-Stage Fracture 2095.00 2095.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6615 0.0 0.0 0.0
2014 8423 0.0 0.0 0.0
2015 8402 0.0 0.0 0.0
2016 7471 0.0 0.0 0.0
2017 8095 0.0 0.0 0.0
2018 8317 0.0 0.0 0.0
2019 8623 0.0 0.0 0.0
2020 1486 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-29 Lost Circulation 276.50 276.50
2012-10-11 No Incident Encountered 0.00 0.00
2013-01-15 No Incident Encountered 0.00 0.00

For data sources see[8]

References