If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0795221601000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.841676,"lon":-117.371475,"icon":""}]} |
Location: 00/01-16-079-22W5/0 | |
Location Alias: 00/01-16-79-22 W5M | |
Location Alias 2: 00/01-16-079-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 5 | |
Range: 22 | |
Section: 16 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: CNRL ET AL NVILLE 1-16-79-22 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: B0002818 | |
License Date: 1949-04-29 | |
License Status: Suspension | |
Spud Date: 1949-05-16 | |
Final Drill Date: 1949-09-22 | |
Well Total Depth: 2262.80 m | |
Surface Hole Latitude: 55.841676 | |
Surface Hole Longitude: -117.371475 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1949-04-29 | Obtained License |
1949-05-31 | Drill Stem Test Performed |
1949-06-02 | Drill Stem Test Performed |
1949-06-05 | Drill Stem Test Performed |
1949-06-06 | Drill Stem Test Performed |
1949-06-07 | Drill Stem Test Performed |
1949-06-08 | Drill Stem Test Performed |
1949-06-09 | Drill Stem Test Performed |
1949-06-12 | Drill Stem Test Performed |
1949-06-13 | Drill Stem Test Performed |
1949-06-15 | Drill Stem Test Performed |
1949-06-16 | Drill Stem Test Performed |
1949-06-17 | Drill Stem Test Performed |
1949-06-18 | Drill Stem Test Performed |
1949-06-19 | Drill Stem Test Performed |
1949-06-21 | Drill Stem Test Performed |
1949-06-22 | Drill Stem Test Performed |
1949-06-24 | Drill Stem Test Performed |
1949-06-25 | Drill Stem Test Performed |
1949-06-26 | Drill Stem Test Performed |
1949-06-27 | Drill Stem Test Performed |
1949-07-07 | Drill Stem Test Performed |
1949-07-29 | Drill Stem Test Performed |
1949-09-10 | Drill Stem Test Performed |
1949-09-11 | Drill Stem Test Performed |
1949-09-22 | Drill Stem Test Performed |
1949-09-22 | Finished Drilling |
1949-09-22 | Well Mode changed to Drilled and Cased |
1949-09-26 | Production Casing Operation Performed |
1949-09-30 | Perforation Treatment Performed - Jet Perforation |
1949-10-03 | Perforation Treatment Performed - Jet Perforation |
1949-10-05 | Perforation Treatment Performed - Jet Perforation |
1949-10-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1949-10-12 | Well Began Production |
1949-10-12 | Well Fluid changed to Crude Oil |
1949-10-12 | Well Mode changed to Flowing |
1954-06-10 | Well Fluid changed to Crude Oil |
1954-06-10 | Well Mode changed to Suspended |
1956-05-12 | Perforation Treatment Performed - Cement Squeeze |
1956-05-27 | Perforation Treatment Performed - Jet Perforation |
1956-05-28 | Perforation Treatment Performed - Acid Wash - No Pressure |
1956-05-29 | Perforation Treatment Performed - Jet Perforation |
1956-06-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-06-03 | Perforation Treatment Performed - Jet Perforation |
1956-06-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-06-09 | Well Fluid changed to Crude Oil |
1956-06-09 | Well Mode changed to Flowing |
1975-06-05 | Well Fluid changed to Crude Oil |
1975-06-05 | Well Mode changed to Pumping |
1977-11-16 | Well Fluid changed to Crude Oil |
1977-11-16 | Well Mode changed to Suspended |
1982-07-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-07-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-07-16 | Perforation Treatment Performed - Jet Perforation |
1982-07-16 | Well Fluid changed to Crude Oil |
1982-07-16 | Well Mode changed to Abandoned Zone |
1993-05-24 | Well Log Performed |
1993-05-25 | Well Log Performed |
1993-05-27 | Perforation Treatment Performed - Cement Squeeze |
1993-06-03 | Well Log Performed |
1993-06-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-06-04 | Perforation Treatment Performed - Jet Perforation |
1993-06-04 | Plug Back Performed |
1993-06-05 | Perforation Treatment Performed - Fractured |
1993-06-05 | Well Log Performed |
1993-09-04 | Well Log Performed |
1993-09-05 | Perforation Treatment Performed - Jet Perforation |
1993-09-08 | Perforation Treatment Performed - Fractured |
1993-09-11 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-09-30 | Perforation | 2054.40 | 2055.90 | 13 |
1956-05-29 | Perforation | 2045.80 | 2048.30 | 13 |
1956-06-01 | Acid Treatment | 2040.90 | 2048.30 | 0 |
1956-06-03 | Perforation | 2048.30 | 2051.30 | 13 |
1956-06-04 | Acid Treatment | 2040.90 | 2051.30 | 0 |
1982-07-14 | Packing Device Capped w/Cement | 1968.00 | 2050.00 | 0 |
1982-07-16 | Packing Device Capped w/Cement | 755.00 | 765.00 | 0 |
1982-07-16 | Perforation | 746.50 | 748.50 | 13 |
1993-05-27 | Cement Squeeze | 746.50 | 748.50 | 0 |
1993-06-04 | Packing Device Capped w/Cement | 1241.00 | 1250.00 | 0 |
1993-06-04 | Perforation | 1100.00 | 1105.50 | 13 |
1949-10-03 | Perforation | 2052.80 | 2054.40 | 13 |
1993-06-05 | Fracture | 1100.00 | 1105.50 | 0 |
1993-09-05 | Perforation | 1039.00 | 1046.00 | 13 |
1993-09-05 | Perforation | 1047.00 | 1049.00 | 13 |
1993-09-08 | Fracture | 1039.00 | 1049.00 | 0 |
1949-10-05 | Perforation | 2051.30 | 2052.80 | 13 |
1949-10-06 | Acid Treatment | 2051.30 | 2055.90 | 0 |
1956-05-12 | Cement Squeeze | 2051.30 | 2055.90 | 0 |
1956-05-27 | Perforation | 2040.90 | 2044.00 | 26 |
1956-05-27 | Perforation | 2045.20 | 2046.70 | 26 |
1956-05-28 | Acid Wash | 2040.90 | 2046.70 | 0 |
1956-05-29 | Perforation | 2040.90 | 2043.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 6032 | 0.0 | 0.0 | 0.0 |
1973 | 7950 | 0.0 | 0.0 | 0.0 |
1974 | 7250 | 0.0 | 0.0 | 0.0 |
1975 | 7603 | 0.0 | 0.0 | 0.0 |
1976 | 5283 | 0.0 | 0.0 | 0.0 |
1978 | 720 | 0.0 | 0.0 | 0.0 |
For data sources see[5]