X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795090101000

Well Details

Well ID: 0795090101000
Loading map...
Location: 00/01-01-079-09W5/0
Location Alias: 00/01-01-79-09 W5M
Location Alias 2: 00/01-01-079-09 W5/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 09
Section: 01
County/Municipality: Big Lakes County
Well Name: PRED ET AL HZ NIPISI 1-1-79-9
Operator Name: Highwood Oil Company Ltd.
License Number: 0196058
License Date: 1997-01-03
License Status: Abandoned
Spud Date: 1997-02-03
Final Drill Date: 1997-02-13
Well Total Depth: 1892.00 m
Surface Hole Latitude: 55.813777
Surface Hole Longitude: -115.258996

For data sources see[1][2]

Well History

Date Event
1997-01-03 Obtained License
1997-02-05 Surface Casing Operation Performed
1997-02-13 Finished Drilling
1997-02-13 Well Log Performed
1997-02-13 Well Mode changed to Drilled and Cased
1997-02-16 Production Casing Operation Performed
1997-02-16 Rig Released
1997-02-19 Well Log Performed
1997-02-21 Perforation Treatment Performed - Jet Perforation
1997-03-06 Well Began Production
1997-03-06 Well Fluid changed to Crude Oil
1997-03-06 Well Mode changed to Pumping
1997-04-01 Well Log Performed
1998-01-23 Perforation Treatment Performed - Jet Perforation
1998-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-22 Plug Back Performed
1998-07-22 Well Fluid changed to Crude Oil
1998-07-22 Well Mode changed to Abandoned and Whipstocked
1998-12-19 Perforation Treatment Performed - Jet Perforation
1998-12-19 Well Log Performed
1998-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-12-20 Perforation Treatment Performed - Cement Squeeze
1998-12-20 Plug Back Performed
1998-12-20 Well Fluid changed to Crude Oil
1998-12-20 Well Log Performed
1998-12-20 Well Mode changed to Abandoned and Whipstocked
2000-07-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-02-21 Perforation 1748.50 1750.50 13
1998-12-19 Perforation 1767.50 1769.50 13
1998-12-20 Cement Squeeze 1748.50 1769.50 0
1998-12-20 Packing Device Capped w/Cement 1732.50 1742.00 0
1997-02-21 Perforation 1761.00 1762.50 13
1997-02-21 Perforation 1767.50 1769.50 13
1998-01-23 Perforation 1748.50 1750.50 17
1998-01-23 Perforation 1761.00 1762.00 17
1998-01-23 Perforation 1767.50 1769.50 17
1998-07-22 Packing Device Capped w/Cement 1732.00 1740.00 0
1998-12-19 Perforation 1748.50 1750.50 13
1998-12-19 Perforation 1761.00 1762.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4732 0.0 0.0 0.0
1998 2960 0.0 0.0 0.0

For data sources see[5]

References