X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786010907002

Well Details

Well ID: 0786010907002
Loading map...
Location: 00/07-09-078-01W6/2
Location Alias: 00/07-09-78-01 W6M
Location Alias 2: 00/07-09-078-01 W6/02
Province: Alberta
County/Municipality: Birch Hills County
Well Name: CNRL ET AL BELLOY 7-9-78-1
Operator Name:
License Number: 0038716
License Date: 1970-09-03
License Status: Abandoned
Spud Date: 1970-10-11
Final Drill Date: 1970-10-16
Well Total Depth: 1029.3 m
Surface Hole Latitude: 55.74233
Surface Hole Longitude: -118.086096

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-09-06 Perforation 990.6 992.4 13
1971-09-07 Perforation 827.5 829.1 13
1971-09-09 Perforation 806.5 808.3 13
1971-09-10 Perforation 752.9 754.1 13
1971-09-11 Cement Squeeze 806.5 808.3 0
1971-09-12 Cement Squeeze 752.9 754.1 0
1973-07-04 Cement Plug 973.5 981.5 0
1973-07-05 Perforation 950.7 951.9 7
1973-07-06 Perforation 953.4 954.9 7
1975-03-07 Cement Squeeze 826 827.5 0
1975-03-09 Perforation 612 613.3 3
1992-06-30 Packing Device Capped w/Cement 935 943 0
1992-07-01 Perforation 806.2 809.2 13
1998-06-07 Packing Device Capped w/Cement 784 792 0
1998-06-07 Packing Device Capped w/Cement 594 602 0
1998-06-09 Perforation 418.5 419.5 14
1998-06-10 Acid Treatment 418.5 419.5 0
1998-06-12 Remedial Casing Cementing 418.5 419.5 0
1998-06-14 Perforation 379 380 14
1998-06-16 Remedial Casing Cementing 379 380 0
1999-05-28 Perforation 806.2 809.2 13
1999-05-28 Perforation 612 613.3 3
1999-06-01 Acid Treatment 806.2 809.2 0
1999-06-02 Packing Device Capped w/Cement 796 804 0
1999-06-03 Acid Treatment 612 613.3 0
1999-06-04 Packing Device Capped w/Cement 592 600 0
1999-06-04 Perforation 529 530 14
1999-06-04 Perforation 556 557 14
1999-06-05 Acid Treatment 529 557 0
1999-06-06 Acid Treatment 529 557 0
1999-06-06 Perforation 534 535 14
1999-06-07 Cement Plug 478 565.7 0
1999-06-09 Perforation 453.5 454.5 14
1999-06-09 Perforation 462.5 463.5 14
1999-06-09 Acid Treatment 453.5 463.5 0
1999-06-11 Remedial Casing Cementing 453.5 463.5 0
1999-06-11 Packing Device Capped w/Cement 320.6 458 0
1999-06-13 Perforation 230 231 14
1999-06-14 Acid Treatment 230 231 0
1999-06-14 Remedial Casing Cementing 230 231 0
1999-06-14 Packing Device Capped w/Cement 218 227 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 433 735.2 0.0 0.0
1973 5341 7219.8 0.0 154.1
1974 494 201.4 0.0 3.7

For data sources see[4]

References