X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0776051006003"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0776051006003
 
| Well ID: 0776051006003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 55.655759, -118.689268 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.655759, -118.689268 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-10-077-05W6/3
 
| Location: 00/06-10-077-05W6/3
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/06-10-077-05 W6/03
 
| Location Alias 2: 00/06-10-077-05 W6/03
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 077
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 05
 +
|-
 +
| Section: 10
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Spirit River No. 133,_Alberta|Municipal District of Spirit River No. 133]]
 
| County/Municipality: [[Municipal District of Spirit River No. 133,_Alberta|Municipal District of Spirit River No. 133]]
Line 17: Line 27:
 
| Well Name: TIDEWATER RYCROFT 6-10-77-5
 
| Well Name: TIDEWATER RYCROFT 6-10-77-5
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Tidewater Midstream and Infrastructure Ltd.]]
 
|-
 
|-
 
| License Number: 0107443
 
| License Number: 0107443
Line 29: Line 39:
 
| Final Drill Date: 1984-07-16
 
| Final Drill Date: 1984-07-16
 
|-
 
|-
| Well Total Depth: 1420 m
+
| Well Total Depth: 1420.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 55.655759
 
| Surface Hole Latitude: 55.655759
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1984-06-04
 +
| Obtained License
 +
|-
 +
| 1984-07-09
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1984-07-16
 +
| Finished Drilling
 +
|-
 +
| 1984-07-17
 +
| Well Log Performed
 +
|-
 +
| 1984-07-18
 +
| Drill Stem Test Performed
 +
|-
 +
| 1984-07-19
 +
| Drill Stem Test Performed
 +
|-
 +
| 1984-07-21
 +
| Production Casing Operation Performed
 +
|-
 +
| 1984-07-21
 +
| Rig Released
 +
|-
 +
| 1984-07-30
 +
| Well Log Performed
 +
|-
 +
| 1984-08-02
 +
| Well Log Performed
 +
|-
 +
| 1984-08-03
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1984-08-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-11-16
 +
| Well Log Performed
 +
|-
 +
| 1984-11-17
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1984-11-17
 +
| Plug Back Performed
 +
|-
 +
| 1984-11-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-11-19
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1994-08-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1994-08-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-08-25
 +
| Plug Back Performed
 +
|-
 +
| 1994-08-25
 +
| Well Log Performed
 +
|-
 +
| 1994-08-26
 +
| Well Log Performed
 +
|-
 +
| 1994-08-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-08-27
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1994-08-28
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2000-07-05
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 174:
 
| 1984-08-03
 
| 1984-08-03
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1382
+
| style="text-align: right;" | 1382.00
| style="text-align: right;" | 1383
+
| style="text-align: right;" | 1383.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-08-03
 
| 1984-08-03
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1382
+
| style="text-align: right;" | 1382.00
| style="text-align: right;" | 1383
+
| style="text-align: right;" | 1383.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-11-17
 
| 1984-11-17
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1362
+
| style="text-align: right;" | 1362.00
| style="text-align: right;" | 1370
+
| style="text-align: right;" | 1370.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-11-18
 
| 1984-11-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1260
+
| style="text-align: right;" | 1260.00
| style="text-align: right;" | 1263
+
| style="text-align: right;" | 1263.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1984-11-19
 
| 1984-11-19
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1260
+
| style="text-align: right;" | 1260.00
| style="text-align: right;" | 1263
+
| style="text-align: right;" | 1263.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-08-25
 
| 1994-08-25
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1244
+
| style="text-align: right;" | 1244.00
| style="text-align: right;" | 1252
+
| style="text-align: right;" | 1252.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-08-25
 
| 1994-08-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 737
+
| style="text-align: right;" | 737.00
| style="text-align: right;" | 738.5
+
| style="text-align: right;" | 738.50
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1994-08-27
 
| 1994-08-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1232.5
+
| style="text-align: right;" | 1232.50
| style="text-align: right;" | 1235
+
| style="text-align: right;" | 1235.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2000-07-05
 
| 2000-07-05
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 737
+
| style="text-align: right;" | 737.00
| style="text-align: right;" | 738.5
+
| style="text-align: right;" | 738.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 130: Line 230:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 175: Line 289:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 14:24, 18 January 2021

Well Details

Well ID: 0776051006003
Loading map...
Location: 00/06-10-077-05W6/3
Location Alias: 00/06-10-77-05 W6M
Location Alias 2: 00/06-10-077-05 W6/03
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 05
Section: 10
County/Municipality: Municipal District of Spirit River No. 133
Well Name: TIDEWATER RYCROFT 6-10-77-5
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0107443
License Date: 1984-06-04
License Status: Suspension
Spud Date: 1984-07-08
Final Drill Date: 1984-07-16
Well Total Depth: 1420.00 m
Surface Hole Latitude: 55.655759
Surface Hole Longitude: -118.689268

For data sources see[1][2]

Well History

Date Event
1984-06-04 Obtained License
1984-07-09 Surface Casing Operation Performed
1984-07-16 Finished Drilling
1984-07-17 Well Log Performed
1984-07-18 Drill Stem Test Performed
1984-07-19 Drill Stem Test Performed
1984-07-21 Production Casing Operation Performed
1984-07-21 Rig Released
1984-07-30 Well Log Performed
1984-08-02 Well Log Performed
1984-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-03 Perforation Treatment Performed - Jet Perforation
1984-11-16 Well Log Performed
1984-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-17 Plug Back Performed
1984-11-18 Perforation Treatment Performed - Jet Perforation
1984-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-25 Perforation Treatment Performed - Jet Perforation
1994-08-25 Plug Back Performed
1994-08-25 Well Log Performed
1994-08-26 Well Log Performed
1994-08-27 Perforation Treatment Performed - Jet Perforation
1994-08-27 Well Mode changed to Drilled and Cased
1994-08-28 Well Mode changed to Drilled and Cased
2000-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-08-03 Perforation 1382.00 1383.00 13
1984-08-03 Acid Treatment 1382.00 1383.00 0
1984-11-17 Packing Device Capped w/Cement 1362.00 1370.00 0
1984-11-18 Perforation 1260.00 1263.00 7
1984-11-19 Acid Treatment 1260.00 1263.00 0
1994-08-25 Packing Device Capped w/Cement 1244.00 1252.00 0
1994-08-25 Perforation 737.00 738.50 14
1994-08-27 Perforation 1232.50 1235.00 14
2000-07-05 Acid Treatment 737.00 738.50 0

For data sources see[4]



References