X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0775251516004"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0775251516004
 
| Well ID: 0775251516004
| style="height=100%; align=center" rowspan="14" | {{#display_map: 55.676543, -117.783249 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.676543, -117.783249 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/16-15-077-25W5/4
 
| Location: 00/16-15-077-25W5/4
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/16-15-077-25 W5/04
 
| Location Alias 2: 00/16-15-077-25 W5/04
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 077
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 25
 +
|-
 +
| Section: 15
 
|-
 
|-
 
| County/Municipality: [[Birch Hills County,_Alberta|Birch Hills County]]
 
| County/Municipality: [[Birch Hills County,_Alberta|Birch Hills County]]
Line 17: Line 27:
 
| Well Name: CNRL 159748 EAGLE 16-15-77-25
 
| Well Name: CNRL 159748 EAGLE 16-15-77-25
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Canadian Natural Resources Limited]]
 
|-
 
|-
 
| License Number: 0159748
 
| License Number: 0159748
Line 29: Line 39:
 
| Final Drill Date: 1993-08-29
 
| Final Drill Date: 1993-08-29
 
|-
 
|-
| Well Total Depth: 2395 m
+
| Well Total Depth: 2395.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 55.676543
 
| Surface Hole Latitude: 55.676543
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1993-07-27
 +
| Obtained License
 +
|-
 +
| 1993-08-01
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1993-08-11
 +
| Well Log Performed
 +
|-
 +
| 1993-08-13
 +
| Drill Stem Test Performed
 +
|-
 +
| 1993-08-14
 +
| Drill Stem Test Performed
 +
|-
 +
| 1993-08-15
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 1993-08-15
 +
| Drill Stem Test Performed
 +
|-
 +
| 1993-08-29
 +
| Finished Drilling
 +
|-
 +
| 1993-08-29
 +
| Well Log Performed
 +
|-
 +
| 1993-08-29
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1993-08-30
 +
| Well Log Performed
 +
|-
 +
| 1993-09-02
 +
| Production Casing Operation Performed
 +
|-
 +
| 1993-09-06
 +
| Rig Released
 +
|-
 +
| 1993-10-12
 +
| Well Log Performed
 +
|-
 +
| 1993-11-10
 +
| Well Log Performed
 +
|-
 +
| 1993-11-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-11-12
 +
| Well Log Performed
 +
|-
 +
| 1993-11-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1993-11-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-11-16
 +
| Well Log Performed
 +
|-
 +
| 1993-11-18
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1993-11-20
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1993-11-20
 +
| Plug Back Performed
 +
|-
 +
| 1993-11-20
 +
| Well Log Performed
 +
|-
 +
| 1993-11-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-11-21
 +
| Well Log Performed
 +
|-
 +
| 1993-11-22
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1993-11-25
 +
| Well Log Performed
 +
|-
 +
| 1993-11-26
 +
| Well Log Performed
 +
|-
 +
| 1993-11-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-11-28
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1993-12-02
 +
| Well Log Performed
 +
|-
 +
| 1994-03-19
 +
| Well Log Performed
 +
|-
 +
| 1994-03-23
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1994-03-23
 +
| Plug Back Performed
 +
|-
 +
| 1994-03-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-03-25
 +
| Well Log Performed
 +
|-
 +
| 1997-03-11
 +
| Well Log Performed
 +
|-
 +
| 1997-03-12
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1997-03-12
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1997-03-12
 +
| Plug Back Performed
 +
|-
 +
| 1997-03-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1997-03-16
 +
| Well Log Performed
 +
|-
 +
| 1997-03-19
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1997-03-27
 +
| Well Log Performed
 +
|-
 +
| 1998-11-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-11-09
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2000-11-25
 +
| Well Log Performed
 +
|-
 +
| 2000-11-27
 +
| Well Log Performed
 +
|-
 +
| 2000-11-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-02-29
 +
| Well Log Performed
 +
|-
 +
| 2008-03-01
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2008-03-01
 +
| Plug Back Performed
 +
|-
 +
| 2008-03-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-03-06
 +
| Well Log Performed
 +
|-
 +
| 2008-03-13
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 253:
 
|-
 
|-
 
| 1993-08-15
 
| 1993-08-15
| style="text-align: right;" | 1625
+
| style="text-align: right;" | 1625.00
 
+
| Deviate (5 - 79 degrees)
 
|-
 
|-
 
|}
 
|}
Line 70: Line 260:
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 83: Line 273:
 
| 1993-11-12
 
| 1993-11-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2113
+
| style="text-align: right;" | 2113.00
| style="text-align: right;" | 2116
+
| style="text-align: right;" | 2116.00
| style="text-align: right;" | 14
 
|-
 
| 1993-11-14
 
| Acid Treatment
 
| style="text-align: right;" | 2113
 
| style="text-align: right;" | 2116
 
| style="text-align: right;" | 0
 
|-
 
| 1993-11-16
 
| Perforation
 
| style="text-align: right;" | 2120
 
| style="text-align: right;" | 2124
 
| style="text-align: right;" | 14
 
|-
 
| 1993-11-18
 
| Acid Treatment
 
| style="text-align: right;" | 2120
 
| style="text-align: right;" | 2124
 
| style="text-align: right;" | 0
 
|-
 
| 1993-11-20
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 2097
 
| style="text-align: right;" | 2105
 
| style="text-align: right;" | 0
 
|-
 
| 1993-11-21
 
| Perforation
 
| style="text-align: right;" | 1396
 
| style="text-align: right;" | 1400
 
| style="text-align: right;" | 14
 
|-
 
| 1993-11-22
 
| Fracture
 
| style="text-align: right;" | 1396
 
| style="text-align: right;" | 1400
 
| style="text-align: right;" | 0
 
|-
 
| 1993-11-27
 
| Perforation
 
| style="text-align: right;" | 1359
 
| style="text-align: right;" | 1361
 
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
|-
 
| 1993-11-28
 
| Fracture
 
| style="text-align: right;" | 1359
 
| style="text-align: right;" | 1361
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 1994-03-23
 
| 1994-03-23
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1377
+
| style="text-align: right;" | 1377.00
| style="text-align: right;" | 1385
+
| style="text-align: right;" | 1385.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-03-25
 
| 1994-03-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1189
+
| style="text-align: right;" | 1189.00
| style="text-align: right;" | 1189.5
+
| style="text-align: right;" | 1189.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1997-03-12
 
| 1997-03-12
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1189
+
| style="text-align: right;" | 1189.00
| style="text-align: right;" | 1189.5
+
| style="text-align: right;" | 1189.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-03-12
 
| 1997-03-12
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1189
+
| style="text-align: right;" | 1189.00
| style="text-align: right;" | 1189.5
+
| style="text-align: right;" | 1189.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-03-16
 
| 1997-03-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1386.5
+
| style="text-align: right;" | 1386.50
| style="text-align: right;" | 1389
+
| style="text-align: right;" | 1389.00
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 1997-03-16
 
| 1997-03-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1365.5
+
| style="text-align: right;" | 1365.50
| style="text-align: right;" | 1372
+
| style="text-align: right;" | 1372.00
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 1997-03-19
 
| 1997-03-19
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1359
+
| style="text-align: right;" | 1359.00
| style="text-align: right;" | 1389
+
| style="text-align: right;" | 1389.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-11-07
 
| 1998-11-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1344
+
| style="text-align: right;" | 1344.00
| style="text-align: right;" | 1348
+
| style="text-align: right;" | 1348.00
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 1998-11-09
 
| 1998-11-09
| Fracture  
+
| Fracture
| style="text-align: right;" | 1344
+
| style="text-align: right;" | 1344.00
| style="text-align: right;" | 1348
+
| style="text-align: right;" | 1348.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-11-29
 
| 2000-11-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 526
+
| style="text-align: right;" | 526.00
| style="text-align: right;" | 528
+
| style="text-align: right;" | 528.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 +
|-
 +
| 1993-11-14
 +
| Acid Treatment
 +
| style="text-align: right;" | 2113.00
 +
| style="text-align: right;" | 2116.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-03-01
 
| 2008-03-01
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 526
+
| style="text-align: right;" | 526.00
| style="text-align: right;" | 528
+
| style="text-align: right;" | 528.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-03-06
 
| 2008-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1285.5
+
| style="text-align: right;" | 1285.50
| style="text-align: right;" | 1286.5
+
| style="text-align: right;" | 1286.50
 
| style="text-align: right;" | 6
 
| style="text-align: right;" | 6
 
|-
 
|-
 
| 2008-03-06
 
| 2008-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1292.5
+
| style="text-align: right;" | 1292.50
| style="text-align: right;" | 1293.5
+
| style="text-align: right;" | 1293.50
 
| style="text-align: right;" | 6
 
| style="text-align: right;" | 6
 
|-
 
|-
 
| 2008-03-06
 
| 2008-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1299
+
| style="text-align: right;" | 1299.00
| style="text-align: right;" | 1301
+
| style="text-align: right;" | 1301.00
 
| style="text-align: right;" | 6
 
| style="text-align: right;" | 6
 
|-
 
|-
 
| 2008-03-13
 
| 2008-03-13
| Fracture  
+
| Fracture
| style="text-align: right;" | 1285.5
+
| style="text-align: right;" | 1285.50
| style="text-align: right;" | 1301
+
| style="text-align: right;" | 1301.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1993-11-16
 +
| Perforation
 +
| style="text-align: right;" | 2120.00
 +
| style="text-align: right;" | 2124.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 1993-11-18
 +
| Acid Treatment
 +
| style="text-align: right;" | 2120.00
 +
| style="text-align: right;" | 2124.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1993-11-20
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2097.00
 +
| style="text-align: right;" | 2105.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1993-11-21
 +
| Perforation
 +
| style="text-align: right;" | 1396.00
 +
| style="text-align: right;" | 1400.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 1993-11-22
 +
| Fracture
 +
| style="text-align: right;" | 1396.00
 +
| style="text-align: right;" | 1400.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1993-11-27
 +
| Perforation
 +
| style="text-align: right;" | 1359.00
 +
| style="text-align: right;" | 1361.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 1993-11-28
 +
| Fracture
 +
| style="text-align: right;" | 1359.00
 +
| style="text-align: right;" | 1361.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 229: Line 419:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 274: Line 478:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 14:00, 18 January 2021

Well Details

Well ID: 0775251516004
Loading map...
Location: 00/16-15-077-25W5/4
Location Alias: 00/16-15-77-25 W5M
Location Alias 2: 00/16-15-077-25 W5/04
Country: Canada
Province: Alberta
Township: 077
Meridian: 5
Range: 25
Section: 15
County/Municipality: Birch Hills County
Well Name: CNRL 159748 EAGLE 16-15-77-25
Operator Name: Canadian Natural Resources Limited
License Number: 0159748
License Date: 1993-07-27
License Status: Suspension
Spud Date: 1993-07-30
Final Drill Date: 1993-08-29
Well Total Depth: 2395.00 m
Surface Hole Latitude: 55.676543
Surface Hole Longitude: -117.783249

For data sources see[1][2]

Well History

Date Event
1993-07-27 Obtained License
1993-08-01 Surface Casing Operation Performed
1993-08-11 Well Log Performed
1993-08-13 Drill Stem Test Performed
1993-08-14 Drill Stem Test Performed
1993-08-15 Direction Drilling Operation Performed - Deviate
1993-08-15 Drill Stem Test Performed
1993-08-29 Finished Drilling
1993-08-29 Well Log Performed
1993-08-29 Well Mode changed to Drilled and Cased
1993-08-30 Well Log Performed
1993-09-02 Production Casing Operation Performed
1993-09-06 Rig Released
1993-10-12 Well Log Performed
1993-11-10 Well Log Performed
1993-11-12 Perforation Treatment Performed - Jet Perforation
1993-11-12 Well Log Performed
1993-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-16 Perforation Treatment Performed - Jet Perforation
1993-11-16 Well Log Performed
1993-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-20 Plug Back Performed
1993-11-20 Well Log Performed
1993-11-21 Perforation Treatment Performed - Jet Perforation
1993-11-21 Well Log Performed
1993-11-22 Perforation Treatment Performed - Fractured
1993-11-25 Well Log Performed
1993-11-26 Well Log Performed
1993-11-27 Perforation Treatment Performed - Jet Perforation
1993-11-28 Perforation Treatment Performed - Fractured
1993-12-02 Well Log Performed
1994-03-19 Well Log Performed
1994-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-03-23 Plug Back Performed
1994-03-25 Perforation Treatment Performed - Jet Perforation
1994-03-25 Well Log Performed
1997-03-11 Well Log Performed
1997-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-12 Perforation Treatment Performed - Cement Squeeze
1997-03-12 Plug Back Performed
1997-03-16 Perforation Treatment Performed - Jet Perforation
1997-03-16 Well Log Performed
1997-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-27 Well Log Performed
1998-11-07 Perforation Treatment Performed - Jet Perforation
1998-11-09 Perforation Treatment Performed - Fractured
2000-11-25 Well Log Performed
2000-11-27 Well Log Performed
2000-11-29 Perforation Treatment Performed - Jet Perforation
2008-02-29 Well Log Performed
2008-03-01 Perforation Treatment Performed - Cement Squeeze
2008-03-01 Plug Back Performed
2008-03-06 Perforation Treatment Performed - Jet Perforation
2008-03-06 Well Log Performed
2008-03-13 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-08-15 1625.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-11-12 Perforation 2113.00 2116.00 14
1994-03-23 Packing Device Capped w/Cement 1377.00 1385.00 0
1994-03-25 Perforation 1189.00 1189.50 13
1997-03-12 Acid Treatment 1189.00 1189.50 0
1997-03-12 Cement Squeeze 1189.00 1189.50 0
1997-03-16 Perforation 1386.50 1389.00 18
1997-03-16 Perforation 1365.50 1372.00 18
1997-03-19 Acid Treatment 1359.00 1389.00 0
1998-11-07 Perforation 1344.00 1348.00 18
1998-11-09 Fracture 1344.00 1348.00 0
2000-11-29 Perforation 526.00 528.00 17
1993-11-14 Acid Treatment 2113.00 2116.00 0
2008-03-01 Cement Squeeze 526.00 528.00 0
2008-03-06 Perforation 1285.50 1286.50 6
2008-03-06 Perforation 1292.50 1293.50 6
2008-03-06 Perforation 1299.00 1301.00 6
2008-03-13 Fracture 1285.50 1301.00 0
1993-11-16 Perforation 2120.00 2124.00 14
1993-11-18 Acid Treatment 2120.00 2124.00 0
1993-11-20 Packing Device Capped w/Cement 2097.00 2105.00 0
1993-11-21 Perforation 1396.00 1400.00 14
1993-11-22 Fracture 1396.00 1400.00 0
1993-11-27 Perforation 1359.00 1361.00 14
1993-11-28 Fracture 1359.00 1361.00 0

For data sources see[5]



References