If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766133016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.614917,"lon":-119.980303,"icon":""}]} |
Location: 00/16-30-076-13W6/0 | |
Location Alias: 00/16-30-76-13 W6M | |
Location Alias 2: 00/16-30-076-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 13 | |
Section: 30 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN HZ GLACIER 16-30-76-13 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0422026 | |
License Date: 2010-07-21 | |
License Status: Amended | |
Spud Date: 2010-08-07 | |
Final Drill Date: 2010-08-22 | |
Well Total Depth: 3657.00 m | |
Surface Hole Latitude: 55.614917 | |
Surface Hole Longitude: -119.980303 |
Date | Event |
---|---|
2010-07-21 | Obtained License |
2010-08-03 | Well Log Performed |
2010-08-09 | Surface Casing Operation Performed |
2010-08-13 | Well Log Performed |
2010-08-15 | Direction Drilling Operation Performed - Horizontal |
2010-08-22 | Finished Drilling |
2010-08-22 | Well Log Performed |
2010-08-22 | Well Mode changed to Drilled and Cased |
2010-08-23 | Well Log Performed |
2010-08-24 | Production Casing Operation Performed |
2010-08-25 | Rig Released |
2010-12-10 | Well Log Performed |
2011-01-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-01-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-01-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-01-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-01-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-01-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-16 | Well Began Production |
2011-05-16 | Well Fluid changed to Gas |
2011-05-16 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-08-15 | 2325.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-25 | Multi-Stage Fracture | 3625.00 | 3635.00 | 0 |
2011-01-26 | Acid Treatment | 3070.00 | 3080.00 | 0 |
2011-01-26 | Multi-Stage Fracture | 2930.00 | 2940.00 | 0 |
2011-01-26 | Acid Treatment | 2930.00 | 2940.00 | 0 |
2011-01-27 | Multi-Stage Fracture | 2915.00 | 2925.00 | 0 |
2011-01-27 | Acid Treatment | 2915.00 | 2925.00 | 0 |
2011-01-27 | Multi-Stage Fracture | 2883.00 | 2887.00 | 0 |
2011-01-27 | Acid Treatment | 2883.00 | 2887.00 | 0 |
2011-01-27 | Multi-Stage Fracture | 2765.00 | 2775.00 | 0 |
2011-01-27 | Acid Treatment | 2765.00 | 2775.00 | 0 |
2011-01-27 | Multi-Stage Fracture | 2645.00 | 2655.00 | 0 |
2011-01-25 | Acid Treatment | 3625.00 | 3635.00 | 0 |
2011-01-27 | Acid Treatment | 2645.00 | 2655.00 | 0 |
2011-01-25 | Multi-Stage Fracture | 3490.00 | 3500.00 | 0 |
2011-01-25 | Acid Treatment | 3490.00 | 3500.00 | 0 |
2011-01-25 | Multi-Stage Fracture | 3350.00 | 3360.00 | 0 |
2011-01-25 | Acid Treatment | 3350.00 | 3360.00 | 0 |
2011-01-26 | Multi-Stage Fracture | 3210.00 | 3220.00 | 0 |
2011-01-26 | Acid Treatment | 3210.00 | 3220.00 | 0 |
2011-01-26 | Multi-Stage Fracture | 3070.00 | 3080.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 5457 | 0.0 | 0.0 | 0.0 |
2012 | 8131 | 0.0 | 0.0 | 0.0 |
2013 | 8434 | 0.0 | 0.0 | 0.0 |
2014 | 7522 | 0.0 | 0.0 | 0.0 |
2015 | 3421 | 0.0 | 0.0 | 0.0 |
2016 | 6352 | 0.0 | 0.0 | 0.0 |
2017 | 7098 | 0.0 | 0.0 | 0.0 |
2018 | 7244 | 0.0 | 0.0 | 0.0 |
2019 | 5836 | 0.0 | 0.0 | 0.0 |
2020 | 2048 | 0.0 | 0.0 | 0.0 |
For data sources see[6]