If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766120708000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.583332,"lon":-119.860718,"icon":""}]} |
Location: 00/08-07-076-12W6/0 | |
Location Alias: 00/08-07-76-12 W6M | |
Location Alias 2: 00/08-07-076-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 12 | |
Section: 07 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN HZ GLACIER 8-7-76-12 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0437300 | |
License Date: 2011-09-30 | |
License Status: Issued | |
Spud Date: 2012-02-28 | |
Final Drill Date: 2012-03-15 | |
Well Total Depth: 4606.00 m | |
Surface Hole Latitude: 55.583332 | |
Surface Hole Longitude: -119.860718 |
Date | Event |
---|---|
2011-09-30 | Obtained License |
2012-03-01 | Surface Casing Operation Performed |
2012-03-04 | Direction Drilling Operation Performed - Horizontal |
2012-03-15 | Finished Drilling |
2012-03-15 | Well Log Performed |
2012-03-15 | Well Mode changed to Drilled and Cased |
2012-03-17 | Production Casing Operation Performed |
2012-03-18 | Rig Released |
2013-02-09 | Well Log Performed |
2013-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-02-21 | Perforation Treatment Performed - Open-Hole Completion |
2013-02-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-07-10 | Well Began Production |
2013-07-10 | Well Fluid changed to Gas |
2013-07-10 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-28 | Ensign Drilling Inc. | 33 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-04 | 2071.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-02-21 | Open Hole/Barefoot Completion | 4591.00 | 4606.00 | 0 |
2013-02-22 | Multi-Stage Fracture | 3597.40 | 3597.50 | 0 |
2013-02-22 | Multi-Stage Fracture | 3482.40 | 3482.50 | 0 |
2013-02-22 | Multi-Stage Fracture | 3358.00 | 3358.10 | 0 |
2013-02-22 | Multi-Stage Fracture | 3242.80 | 3242.90 | 0 |
2013-02-22 | Multi-Stage Fracture | 3115.40 | 3115.50 | 0 |
2013-02-22 | Multi-Stage Fracture | 3001.10 | 3001.20 | 0 |
2013-02-22 | Multi-Stage Fracture | 2875.20 | 2875.30 | 0 |
2013-02-21 | Multi-Stage Fracture | 4554.80 | 4554.90 | 0 |
2013-02-21 | Multi-Stage Fracture | 4431.80 | 4431.90 | 0 |
2013-02-21 | Multi-Stage Fracture | 4316.40 | 4316.50 | 0 |
2013-02-21 | Multi-Stage Fracture | 4189.90 | 4190.00 | 0 |
2013-02-21 | Multi-Stage Fracture | 4072.60 | 4072.70 | 0 |
2013-02-22 | Multi-Stage Fracture | 3956.80 | 3956.90 | 0 |
2013-02-22 | Multi-Stage Fracture | 3838.40 | 3838.50 | 0 |
2013-02-22 | Multi-Stage Fracture | 3712.30 | 3712.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-21 | 2013-02-22 | 2,334 | 1,007 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 27.7263 | N/A | |||
FRAC SAND 20/40 WHITE (OTTAWA TYPE) | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 16.9637 | N/A | ||
FRAC SAND 30/50 WHITE | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 14.2537 | N/A | ||
FRAC SAND 50/140 CANADIAN | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.4094 | N/A | ||
2K7 Solution W-M | Baker Hughes | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0265 | N/A | |
Methanol | 67-56-1 | 100 | 0.0265 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0265 | N/A | ||||
Breaker AB | Baker Hughes | Breaker | Distillates. hydrotreated middle. petroleum | 64742-46-7 | 100 | 0.0462 | N/A | |
CC-2 | Baker Hughes | Clay Control | Non-hazardous | Not Available | 100 | 0.0586 | N/A | |
Carbon Dioxide. Liquid | Baker Hughes | Energizing Fluid | Carbon dioxide. refrigerated liquid | 124-38-9 | 100 | 30.6381 | N/A | |
Nitrogen | Baker Hughes | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 9.525 | N/A | |
FAC-1W | Baker Hughes | Gelling Agent | Isopropanol | 67-63-0 | 100 | 0.0369 | N/A | |
N.N-Dimethyloctadecylamine | 124-28-7 | 100 | 0.0369 | N/A | ||||
N.N-Dimethyloctadecylamine hydrochloride | 1613-17-8 | 100 | 0.0369 | N/A | ||||
Trimethyloctadecylammonium chloride | 112-03-8 | 100 | 0.0369 | N/A | ||||
FAC-3W | Baker Hughes | Gelling Agent | Isopropanol | 67-63-0 | 100 | 0.315 | N/A | |
Sodium xylene sulphonate | 1300-72-7 | 100 | 0.315 | N/A | ||||
Trimethyloctadecylammonium chloride | 112-03-8 | 100 | 0.315 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-02-21 | 2013-02-22 | Surface Water - Lake | 501 |
2013-02-09 | 2013-02-09 | Central Water Distribution Facility | 34 |
2013-03-09 | 2013-03-16 | Central Water Distribution Facility | 153 |
2013-03-08 | 2013-03-15 | Central Water Distribution Facility | 102 |
2013-02-21 | 2013-02-22 | Municipal Water | 576 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 4176 | 0.0 | 0.0 | 0.0 |
2014 | 7866 | 0.0 | 0.0 | 0.0 |
2015 | 6500 | 0.0 | 0.0 | 0.0 |
2016 | 8477 | 0.0 | 0.0 | 0.0 |
2017 | 5201 | 0.0 | 0.0 | 0.0 |
2018 | 7603 | 0.0 | 0.0 | 0.0 |
2019 | 5994 | 0.0 | 0.0 | 0.0 |
2020 | 2057 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-03-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]