X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766091411000

Well Details

Well ID: 0766091411000
Loading map...
Location: 00/11-14-076-09W6/0
Location Alias: 00/11-14-76-09 W6M
Location Alias 2: 00/11-14-076-09 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 09
Section: 14
County/Municipality: Saddle Hills County
Well Name: BELLAMONT HZ VALHALLA 11-14-76-9
Operator Name: Storm Resources Ltd.
License Number: 0413617
License Date: 2009-11-02
License Status: Amended
Spud Date: 2009-11-19
Final Drill Date: 2009-12-03
Well Total Depth: 2920.00 m
Surface Hole Latitude: 55.580548
Surface Hole Longitude: -119.262934

For data sources see[1][2]

Well History

Date Event
2009-11-02 Obtained License
2009-11-20 Surface Casing Operation Performed
2009-11-23 Direction Drilling Operation Performed - Horizontal
2009-11-27 Intermediate Casing Operation Performed
2009-12-03 Finished Drilling
2009-12-03 Well Mode changed to Drilled and Cased
2009-12-05 Liner Casing Operation Performed
2009-12-05 Perforation Treatment Performed - Multi-Stage Fracture
2009-12-05 Perforation Treatment Performed - Open-Hole Completion
2009-12-07 Rig Released
2010-02-23 Well Began Production
2010-02-23 Well Fluid changed to Gas
2010-02-23 Well Mode changed to Flowing
2012-06-01 Well Fluid changed to Gas
2012-06-01 Well Mode changed to Suspended
2012-10-09 Well Fluid changed to Gas
2012-10-09 Well Mode changed to Flowing
2015-01-15 Well Fluid changed to Gas
2015-01-15 Well Mode changed to Suspended
2016-02-01 Well Fluid changed to Gas
2016-02-01 Well Mode changed to Flowing
2016-05-01 Well Fluid changed to Gas
2016-05-01 Well Mode changed to Suspended
2016-09-01 Well Fluid changed to Gas
2016-09-01 Well Mode changed to Flowing
2019-11-01 Well Fluid changed to Gas
2019-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-11-23 1150.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-12-05 Open Hole/Barefoot Completion 1619.00 2920.00 0
2009-12-05 Multi-Stage Fracture 1748.90 1749.00 0
2009-12-05 Multi-Stage Fracture 1674.20 1674.30 0
2009-12-05 Multi-Stage Fracture 2821.20 2821.30 0
2009-12-05 Multi-Stage Fracture 2705.10 2705.20 0
2009-12-05 Multi-Stage Fracture 2575.90 2576.00 0
2009-12-05 Multi-Stage Fracture 2446.40 2446.50 0
2009-12-05 Multi-Stage Fracture 2330.60 2330.70 0
2009-12-05 Multi-Stage Fracture 2175.20 2175.60 0
2009-12-05 Multi-Stage Fracture 2035.30 2035.40 0
2009-12-05 Multi-Stage Fracture 1878.50 1878.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6952 0.0 0.0 0.0
2011 8420 0.0 0.0 0.0
2012 4869 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8375 0.0 0.0 0.0
2015 336 0.0 0.0 0.0
2016 1476 0.0 0.0 0.0
2017 8406 0.0 0.0 0.0
2018 6912 0.0 0.0 0.0
2019 3696 0.0 0.0 0.0

For data sources see[6]

References