If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0765122410000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.601566,"lon":-115.717744,"icon":""}]} |
Location: 00/10-24-076-12W5/0 | |
Location Alias: 00/10-24-76-12 W5M | |
Location Alias 2: 00/10-24-076-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 5 | |
Range: 12 | |
Section: 24 | |
County/Municipality: Big Lakes County | |
Well Name: KEWANEE ET AL SALT CREEK 10-24-76-12 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0027218 | |
License Date: 1964-11-23 | |
License Status: RecCertified | |
Spud Date: 1964-11-29 | |
Final Drill Date: 1964-12-24 | |
Well Total Depth: 2088.80 m | |
Surface Hole Latitude: 55.601566 | |
Surface Hole Longitude: -115.717744 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1964-11-23 | Obtained License |
1964-12-04 | Drill Stem Test Performed |
1964-12-10 | Drill Stem Test Performed |
1964-12-18 | Drill Stem Test Performed |
1964-12-24 | Finished Drilling |
1964-12-25 | Drill Stem Test Performed |
1964-12-27 | Production Casing Operation Performed |
1964-12-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-12-29 | Perforation Treatment Performed - Bullet Perforation |
1965-01-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1965-01-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-01-04 | Perforation Treatment Performed - Jet Perforation |
1965-01-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1965-01-07 | Well Abandoned |
1965-01-07 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1964-12-29 | Bullet Perforation | 2005.30 | 2008.30 | 3 |
1964-12-29 | Acid Treatment | 2005.30 | 2008.30 | 0 |
1965-01-03 | Packing Device Capped w/Cement | 1996.40 | 1996.40 | 0 |
1965-01-04 | Perforation | 898.60 | 901.60 | 3 |
1965-01-04 | Acid Treatment | 898.60 | 901.60 | 0 |
1965-01-06 | Packing Device Capped w/Cement | 883.90 | 883.90 | 0 |
For data sources see[4]